Line 19 of the Shenzhen Metro is a line under construction, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction began on 9 May 2024, and the line is expected to open in October 2028. The first phase of Line 19 will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2][3] The line is proposed to use 6 car type B trains.[4]

Quick Facts Overview, Status ...
Line 19
19
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations12 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned openingOctober 2028; 3 years' time (2028-10)
Technical
Line length12.5km (Phase 1)
CharacterUnderground
Operating speed80km/h
Close

Stations (Phase 1)

More information Station name, Connections ...
Station name Connections Location
English Chinese
Nantangwei 南塘围 Pingshan
People's Hospital 人民医院
Tang-keng 汤坑
Jinlong 锦龙 14
Xinwei 新围
Baoshan 宝山
Xinhe 新和 16
Culture Center 文化中心  Pingshan SkyShuttle Line 1 
Pingshan Center 坪山中心 14  Pingshan SkyShuttle Line 1 
Lanzhu Road 兰竹路
Lijing 荔景
Julong 聚龙
Close

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.