Leek Brook railway station

Railway station in Staffordshire, England From Wikipedia, the free encyclopedia

Leek Brook railway stationmap

Leek Brook railway station is a passenger station in Staffordshire, Great Britain.

Quick Facts General information, Location ...
Leek Brook
Thumb
Leek Brook station in 2019
General information
LocationLeek, Staffordshire, Staffordshire Moorlands
England
Coordinates53.0800°N 2.0296°W / 53.0800; -2.0296
Grid referenceSJ981536
Platforms3 until 1956, now 1
Other information
StatusUsed (Heritage Railway)
History
Original companyNorth Staffordshire Railway
Post-grouping
Key dates
1904Opened
1956Closed
24 August 1996reopened as a heritage railway station
Close

History

Leek Brook railway station was opened by the North Staffordshire Railway (NSR) in 1904.[1] It consisted of an island platform with two faces on the line from Stoke-on-Trent and Leek and a single platform on the down (i.e. Leek bound) direction of the Churnet Valley Line.[2]

The railway station was a very quiet station not even advertised in timetables and was described by the NSR as a halt.[3] The Churnet Valley platform was mainly used as an interchange platform with the St Edwards Hospital tramway using the other side of the platform. Passengers to and from Stoke-on-Trent used the platforms on the StokeLeek line and walked over to the Churnet Valley platform to catch a tram to the hospital. Passengers wishing to head south on the Churnet Valley line towards Uttoxeter would have to catch a northbound train to Leek and then return through Leek Brook on a south bound train.

Leek Brook railway station closed to all traffic on 7 May 1956,[3] the hospital railway had already closed two years previously in November 1954.[4]

Churnet Valley Railway

Summarize
Perspective

During the 1970s a railway preservation base was set up at nearby Cheddleton railway station. This was later to become the base of the Churnet Valley Railway (CVR). The CVR had slowly been progressing in preserving the line when in the late 1990s they had reached the site of Leek Brook station which, however, was not judged worthy of re-opening due to the large amount of other preservation projects being undertaken by the CVR at the time and the poor access to the site.

The first CVR passenger service to the station site was on 24 August 1996. In November 2010, some CVR trains began to continue beyond the site towards Cauldon Low, with most services now terminating at Ipstones, on the Waterhouses branch.[5] In late 2024, track laying was largely completed towards Leek from Leekbrook, with the first passenger service to the site of the new Leek station planned to run in early 2025 [6] On 31 December 2024, a train operated by Churnet Valley Railway travelled for the first time from Froghall to the new temporary terminus at Leek, carrying 400 invited guests.[7]

There is no public access to the station, so neither boarding not alighting is possible there. Trains stop there only to detach the locomotive from one end of the train and run round to attach it to the other.

Route

More information Preceding station, Historical railways ...
Preceding station   Historical railways   Following station
Line open, station closed
North Staffordshire Railway
Line disused, station closed
North Staffordshire Railway
Line & station open
Heritage railways
TerminusChurnet Valley Railway
Close

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.