Lavender MRT station

Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Lavender MRT stationmap

Lavender MRT station is an underground Mass Rapid Transit (MRT) station on the East West line in Kallang, Singapore. Located under Kallang Road, the station is close to the Immigration and Checkpoints Authority (ICA) Building and Jalan Besar Stadium. Planned and built as part of Phase Two of the initial system. The contract for the station's construction was awarded in October 1985, and it was opened in November 1989.

Quick Facts General information, Location ...
Lavender
 EW11 


劳明达
லவண்டர்
Mass Rapid Transit (MRT) station
Thumb
Platform of Lavender MRT station
General information
Location50 Kallang Road
Singapore 208699
Coordinates1°18′25.80″N 103°51′46.83″E
Operated bySMRT Trains Ltd (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeUnderground
Platform levels1
ParkingYes (ICA Building)
Bicycle facilitiesYes
AccessibleYes
History
Opened4 November 1989; 35 years ago (1989-11-04)
ElectrifiedYes
Previous namesKallang, Crawford
Passengers
June 202416,402 per day[1]
Services
Preceding station Mass Rapid Transit Following station
Kallang
towards Pasir Ris
East–West Line Bugis
towards Tuas Link
Location
Thumb
Lavender
Lavender station in Singapore
Close

History

Summarize
Perspective

Lavender station was first included in the early plans of the MRT system as Crawford station in May 1982.[2] As early as February 1983, Lavender station was designated as a bomb shelter along with six other stations.[3][4] It was later announced to be part of Phase II of the MRT in October 1983.[5] In September 1984, the station's name was changed to Lavender station.[6]

Several joint ventures between companies were prequalified for Contract 301B by May 1985, which detailed the construction of the construction of Lavender station, as well as for Victoria station and the tunnels between Bras Basah Road and the Kallang River.[7][8] Ultimately, Contract 301B was awarded to Nishimatsu-Lum Chang Joint Venture for S$227 million (1985) (US$103.17 million) in October 1985.[9]

Quick Facts External Image ...
Close

Initially, the tunnels between Victoria and Lavender station in Victoria street were going to be digged using the cut-and-cover method due to the soft marine clay present, which would have resulted in road diversions and shophouses being covered by hoardings. However, the contractors suggested the tunnels be bored underground, which was accepted by the MRTC, though a shield chamber would have to be built underneath the Tai-Pan Hotel for the tunnelling machine.[10]

As for the tunnel at the Kallang Road and Crawford and Lavender Streets junction, the MRTC considered boring the tunnels but had to use the cut-and-cover method due to the marine clay and sand being too soft and loose.[11] When tunneling, precautions had to be made for the 885m long tunnel. Even though there was not much difficulty when tunneling through Robinson Road, tunneling through Kallang Road and Victoria Street was challenging as it has old shophouses, which had weaker foundations compared to the buildings at Robinson Road and therefore had to be carefully monitored.[12] In March 1986, the section of Kallang Road between Rochor Canal Road and Lavender Street had to be diverted southwards to facilitate the construction of the station. Also, the junction the stretch of Kallang Road between Lavender Street and Rochor Canal Road was closed to traffic.[13] Construction for the station started around July 1986.[14] By February 1987, tunneling between Victoria and Lavender stations was completed five months ahead of schedule.[15][16] The station opened on 4 November 1989, along with the section of the East West line from City Hall to Tanah Merah.[17]

Station details

Lavender station is located under Kallang Road,[13] and is close to Golden Mile Complex, the ICA Building, and Jalan Besar Stadium.[18] Served by the East West Line, between Kallang and Bugis stations, the station has the station code EW11.[19] When it opened, it had the station code of E2[20] before being changed to its current station code in August 2001 as a part of a system-wide campaign to cater to the expanding MRT System.[21][22] As one of the nine stations on the original MRT network built as emergency bomb shelters, the station was fitted out with steel blast doors and 2 metres (6.6 ft) thick walls of reinforced concrete.[23]

Lavender is named after the subzone it serves, which possibly originated as a tongue-in-cheek to the then nearby Kallang Gasworks emitting a foul smell or from the night soil used as fertiliser.[24] The station is directly parallel to Kallang Road and bounded by Crawford Street and the Rochor River. It has two exits primarily serving landmarks in the area such as the ICA building, Jalan Besar Community Club, and Kitchener Complex.[25][26]

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.