Kennedy Space Center Launch Complex 39B

Historic launch pad operated by NASA From Wikipedia, the free encyclopedia

Kennedy Space Center Launch Complex 39Bmap

Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, which at the time was the United States' most powerful rocket. Typically used to launch NASA's crewed spaceflight missions since the late 1960s, the pad is currently configured for use by the agency's Space Launch System rocket, a Shuttle-derived launch vehicle which is currently used in the Artemis program and subsequent Moon to Mars campaigns. The pad had also been leased by NASA to aerospace company Northrop Grumman, for use as a launch site for their Shuttle-derived OmegA launch vehicle, for National Security Space Launch flights and commercial launches, before the OmegA program was cancelled.

Quick Facts Launch site, Location ...
Launch Complex 39B
Thumb
Space Launch System atop LC-39B on March 18, 2022
Thumb
Launch siteKennedy Space Center
LocationMerritt Island, Florida
Coordinates28°37′38″N 80°37′15″W
Time zoneUTC−05:00 (EST)
 Summer (DST)
UTC−04:00 (EDT)
OperatorNASA (1967–present)
Orbital inclination
range
28–62°
Launch history
StatusActive
Launches60
First launchMay 18, 1969 (1969-05-18)
Saturn V / Apollo 10
Last launchNovember 16, 2022 (2022-11-16)
Space Launch System / Artemis 1
Associated
rockets
Current: SLS
Retired: Saturn V, Saturn IB, Space Shuttle, Ares I-X
Plans cancelled: Ares I, OmegA
Launch Complex 39--Pad B
Thumb
Thumb
LocationJohn F. Kennedy Space Center, Titusville, Florida
Area160 acres (65 ha)
Built1967-1968
MPSJohn F. Kennedy Space Center MPS
NRHP reference No.99001639[1]
Added to NRHPJanuary 21, 2000
Close
Thumb
About OpenStreetMaps
Maps: terms of use
4km
2.5miles
28
28 LC-29
28 LC-29
27
27 LC-25
27 LC-25
26
26 LC-30
26 LC-30
25
25 LC-5 and LC-6
25 LC-5 and LC-6
24
24 LC-26
24 LC-26
23
23 SLC-17
23 SLC-17
22
22 LC-18
22 LC-18
21
21 LC-31 and LC-32
21 LC-31 and LC-32
20
20 LC-21 and LC-22
20 LC-21 and LC-22
19
19 SLC-46
19 SLC-46
18
18 LC-1, LC-2, LC-3, and LC-4
18 LC-1, LC-2, LC-3, and LC-4
17
17 LC-36
17 LC-36
16
16 LC-11
16 LC-11
15
15 LC-12
15 LC-12
14
14 LC-13 (LZ-1 & LZ-2)
14 LC-13 (LZ-1 & LZ-2)
13
13 LC-14
13 LC-14
12
12 LC-15
12 LC-15
11
11 LC-16
11 LC-16
10
10 LC-19
10 LC-19
9
9 SLC-20
9 SLC-20
8
8 LC-34
8 LC-34
7
7 SLC-37
7 SLC-37
6
6 LC-47
6 LC-47
5
5 SLC-40
5 SLC-40
4
4 SLC-41
4 SLC-41
3
3 LC-48
3 LC-48
2
2 LC-39A
2 LC-39A
1
1 LC-39B
1 LC-39B

  Active pads
  Active pads not used for launches
  Inactive leased pads
  Inactive unleased pads

History

Summarize
Perspective

Apollo program

In 1961, President Kennedy proposed to Congress the goal of landing a man on the Moon by the end of the decade. Congressional approval led to the launch of the Apollo program, which required a massive expansion of NASA operations, including an expansion of launch operations from the Cape to adjacent Merritt Island to the north and west.[2]

Launch Complex 39B was designed to handle launches of the Saturn V rocket, the largest and most powerful launch vehicle, which would propel Apollo spacecraft to the Moon. Launch Complex 39B's inaugural launch in May 1969 was also that of the only Saturn V to launch from the pad; SA-505, used to launch the Apollo 10 mission.

After the Apollo 17 mission in 1972, Pad 39B was used for Saturn IB launches. The Mobile Launchers were then modified for the Saturn IB rocket, by adding a "milk-stool" extension platform to the launch pedestal, so that the S-IVB upper stage and Apollo spacecraft swing arms would reach their targets. These were used for three crewed Skylab flights and the Apollo–Soyuz, since the Saturn IB pads 34 and 37 at Cape Canaveral had been decommissioned.[3][4]

Space Shuttle

With the advent of the Space Shuttle program in the early 1980s, the original structure of the launch pads were remodeled for the needs of the Space Shuttle. Pad 39A hosted all Space Shuttle launches until January 1986, when Space Shuttle Challenger would become the first to launch from pad 39B during the ill-fated STS-51-L mission, which ended with the destruction of Challenger and the death of the mission's crew a minute into the flight.

Launch Complex 39B hosted 53 Space Shuttle launches until December 2006, when Discovery launched from the pad for the final time during the STS-116 mission. The program's remaining flights launched from pad 39A. To support the final Shuttle mission to the Hubble Space Telescope STS-125 launched from pad 39A in May 2009, Endeavour was placed on 39B if needed to launch the STS-400 rescue mission.

Constellation program

Launch Complex 39B would subsequently be reconfigured for crewed Ares I launches as part of the Constellation program; the Ares I-X mission launched a prototype Ares I from 39B in October 2009, prior to the program's cancellation the following year.

Artemis program

On November 16, 2022, at 06:47:44 UTC, the Space Launch System (SLS) was launched from Complex 39B as part of the Artemis 1 mission.[5][6]

Current status

Summarize
Perspective

After the Ares I-X test flight in 2009, NASA removed the Fixed Service Structure (FSS) from Pad 39B, returning the location to an Apollo-like "clean pad" design for the first time since 1977. This approach is intended to make the pad available to multiple types of vehicles that will arrive at the pad with service structures on the mobile launcher platform, as opposed to using fixed structures on the pad.[7] The LH2, LOX, and water tanks used for the sound suppression system are the only structures left from the Space Shuttle era.[8][9][10]

In 2014, NASA announced that it would make LC-39B available to commercial users during times when it is not needed by the Space Launch System.[11] NASA subsequently agreed to allow Orbital ATK to use LC-39B for their OmegA launch vehicle.[12] However Northrop Grumman, who absorbed Orbital ATK in June 2018,[13] cancelled the development of OmegA in September 2020 before any launches had taken place; SLS will therefore remain the only user of LC-39B for the foreseeable future.[14][15]

As of November 2022, LC-39B manages the Space Launch System (SLS)'s processing and launch operations, as part of the first phase of a five-phase project, were being completed. The second phase of this project is currently budgeted for $89.2 million.[16][17][6]

Launch history

Summarize
Perspective

Statistics

1
2
3
4
5
6
1965
1970
1975
1980
1985
1990
1995
2000
2005
2010
2015
2020

List of launches

Apollo and Apollo Applications

All flights operated by NASA.

More information No., Date ...
No. Date Time (UTC) Launch vehicle Serial number Mission Result Remarks
1 18 May 1969 16:49 Saturn V SA-505 Apollo 10 Success First launch, first crewed launch, and only Saturn V launch from LC-39B. Launch was conducted at the pad to practice high Saturn V launch cadence.
2 25 May 1973 13:00 Saturn IB SA-206 Skylab 2 Success First launch of the Saturn IB from LC-39B, and the first launch of the Saturn IB since Apollo 7 in 1968. First visit to Skylab.
3 28 July 1973 11:10 Saturn IB SA-207 Skylab 3 Success Second visit to Skylab.
4 16 November 1973 14:01 Saturn IB SA-208 Skylab 4 Success Last visit to Skylab.
5 15 July 1975 19:50 Saturn IB SA-210 Apollo–Soyuz Success The Apollo component of the Apollo–Soyuz Test Project, complementing Soyuz 19. First crewed international spaceflight for NASA, and last flight of the Saturn IB, Saturn family, and Apollo CSM.
Close

Space Shuttle

All flights operated by NASA.

More information No., Date ...
No. Date Time (UTC) Launch vehicle Shuttle Mission Result Remarks
6 28 January 1986 16:38 Space Shuttle Challenger STS-51-L Failure First Space Shuttle launch from LC-39B. A failure of the solid rocket booster led to breakup 73 seconds after launch, causing to the Space Shuttle Challenger disaster.
7 28 September 1988 15:37 Space Shuttle Discovery STS-26 Success First Space Shuttle launch following the Challenger disaster.
8 2 December 1988 14:30 Space Shuttle Atlantis STS-27 Success
9 13 March 1989 14:37 Space Shuttle Discovery STS-29 Success
10 4 May 1989 14:46 Space Shuttle Atlantis STS-30 Success Launch and deployment of Magellan.
11 8 August 1989 12:37 Space Shuttle Columbia STS-28 Success
12 18 October 1989 16:53 Space Shuttle Atlantis STS-34 Success Launch and deployment of Galileo.
13 23 November 1989 00:23 Space Shuttle Discovery STS-33 Success
14 12 April 1990 12:33 Space Shuttle Discovery STS-31 Success Launch and deployment of the Hubble Space Telescope.
15 6 October 1990 11:47 Space Shuttle Discovery STS-41 Success Launch and deployment of Ulysses.
16 2 December 1990 06:49 Space Shuttle Columbia STS-35 Success
17 5 April 1991 14:22 Space Shuttle Atlantis STS-37 Success Launch and deployment of the Compton Gamma Ray Observatory.
18 5 June 1991 13:24 Space Shuttle Columbia STS-40 Success
19 7 May 1992 23:40 Space Shuttle Endeavour STS-49 Success Maiden flight of Space Shuttle Endeavour.
20 31 July 1992 13:56 Space Shuttle Atlantis STS-46 Success
21 12 September 1992 14:23 Space Shuttle Endeavour STS-47 Success
22 22 October 1992 17:09 Space Shuttle Columbia STS-52 Success
23 13 January 1993 13:59 Space Shuttle Endeavour STS-54 Success
24 8 April 1993 05:29 Space Shuttle Discovery STS-56 Success
25 21 June 1993 13:07 Space Shuttle Endeavour STS-57 Success
26 12 September 1993 11:45 Space Shuttle Discovery STS-51 Success
27 18 October 1993 14:53 Space Shuttle Columbia STS-58 Success
28 2 December 1993 09:27 Space Shuttle Endeavour STS-61 Success Servicing mission for the Hubble Space Telescope.
29 4 March 1994 13:53 Space Shuttle Columbia STS-62 Success
30 9 September 1994 22:22 Space Shuttle Discovery STS-64 Success
31 3 November 1994 16:59 Space Shuttle Atlantis STS-66 Success
32 3 February 1995 05:22 Space Shuttle Discovery STS-63 Success First mission to the space station Mir. Rendezvoused, but did not dock.
33 13 July 1995 13:41 Space Shuttle Discovery STS-70 Success
34 20 October 1995 13:53 Space Shuttle Columbia STS-73 Success
35 11 January 1996 09:41 Space Shuttle Endeavour STS-72 Success
36 22 February 1996 20:18 Space Shuttle Columbia STS-75 Success
37 22 March 1996 08:13 Space Shuttle Atlantis STS-76 Success Docking with Mir.
38 19 May 1996 10:30 Space Shuttle Endeavour STS-77 Success
39 20 June 1996 14:49 Space Shuttle Columbia STS-78 Success
40 19 November 1996 19:55 Space Shuttle Columbia STS-80 Success Longest ever Space Shuttle flight, at 17 days and 15 hours.
41 12 January 1997 09:27 Space Shuttle Atlantis STS-81 Success Docking with Mir.
42 19 November 1997 19:46 Space Shuttle Columbia STS-87 Success
43 17 April 1998 18:19 Space Shuttle Columbia STS-90 Success
44 29 October 1998 19:19 Space Shuttle Discovery STS-95 Success
45 27 May 1999 10:49 Space Shuttle Discovery STS-96 Success First non-assembly Space Shuttle flight to the International Space Station.
46 23 July 1999 04:31 Space Shuttle Columbia STS-93 Success Launch and deployment of the Chandra X-Ray Observatory.
47 19 December 1999 00:50 Space Shuttle Discovery STS-103 Success Servicing mission for the Hubble Space Telescope.
48 8 September 2000 12:45 Space Shuttle Atlantis STS-106 Success Docking with the ISS.
49 1 December 2000 03:06 Space Shuttle Endeavour STS-97 Success ISS assembly flight, adding the P6 solar array and radiators.
50 8 March 2001 11:42 Space Shuttle Discovery STS-102 Success Docking with the ISS.
51 12 July 2001 09:03 Space Shuttle Atlantis STS-104 Success ISS assembly flight, adding the Quest Joint Airlock.
52 5 December 2001 22:19 Space Shuttle Endeavour STS-108 Success Docking with the ISS.
53 8 April 2002 20:44 Space Shuttle Atlantis STS-110 Success ISS assembly flight, adding the S0 truss.
54 7 October 2002 19:45 Space Shuttle Atlantis STS-112 Success ISS assembly flight, adding the S1 truss.
55 26 July 2005 14:39 Space Shuttle Discovery STS-114 Success Docking with the ISS. First Space Shuttle flight following the Columbia disaster.
56 4 July 2006 18:37 Space Shuttle Discovery STS-121 Success Docking with the ISS.
57 9 September 2006 15:14 Space Shuttle Atlantis STS-115 Success ISS assembly flight, adding the P3/P4 truss and solar arrays.
58 10 December 2006 00:47 Space Shuttle Discovery STS-116 Success ISS assembly flight, adding the P5 truss. Final Space Shuttle flight from LC-39B.
Close

Constellation and Artemis

All flights operated by NASA.

More information No., Date ...
No. Date Time (UTC) Launch vehicle Spacecraft Mission Result Remarks
59 28 October 2009 15:30 Ares I Boilerplate Ares I-X Success Suborbital launch. Carried a boilerplate upper stage and Orion spacecraft. Only launch of the Ares I and of the Constellation Program. First uncrewed launch from LC-39B.
60 16 November 2022 06:47 Space Launch System CM-002 Artemis I Success First launch of SLS and first launch of the Artemis Program. Inaugural flight of a completed Orion spacecraft.