Remove ads
Japanese scout/observation helicopter From Wikipedia, the free encyclopedia
The Kawasaki OH-1 (nickname: "Ninja") is a military scout/observation helicopter developed and manufactured by the Kawasaki Aerospace Company. The primary operator is the Japan Ground Self-Defense Force (JGSDF), who originally procured the OH-1 as a domestically produced successor to their existing OH-6D Loach fleet. The OH-1 has the distinction of being the first helicopter to be entirely produced in Japan.[2]
OH-1 | |
---|---|
General information | |
Type | Scout/observation helicopter |
National origin | Japan |
Manufacturer | Kawasaki Aerospace Company |
Status | In service |
Primary user | Japan Ground Self-Defense Force |
Number built | 38 as of 2013[1] |
History | |
Manufactured | 1996–2013 |
Introduction date | 2000 |
First flight | 6 August 1996 |
In addition to its use as an observation helicopter, it can also be armed to directly participate in combat; such weapons include a limited quantity of air-to-air missiles for self-defense purposes. Several variants of the OH-1 have been proposed, these have included derivatives of the type to serve as an attack helicopter as well as an aborted project to develop a utility helicopter. As of March 2014, a total of 38 OH-1s have entered service with the JGSDF; so far these complement the existing OH-6Ds rather than replace them.[3]
In December 2022, the Japanese government decided to replace 33 OH -1, 12 AH-64D, 47 AH-1S, and 26 U-125A with unmanned aerial vehicles. Japan plans to increase its defense budget from 1.24% of GDP in fiscal 2021 to around 2.0% within 10 years, and has decided to retire these helicopters and aircraft as part of an effort to spend its defense budget efficiently.[4]
During the late 1980s, the JGSDF developed a requirement for a new scout/observation helicopter to replace its Kawasaki license-built OH-6Ds, which became the OH-X programme.[5] In June 1989, the JGSDF announced their intention to pursue the development of the OH-X.[1] Several proposals to meet the OH-X requirement were submitted by Kawasaki, Fuji and Mitsubishi. In 1991, Kawasaki's proposal was selected by the JGSDF's Technical Research and Development Institute as the prime contractor for the OH-X programme.[1] On 18 September 1992, the Kawasaki design formally appointed by the Ministry of Defense as the winner.[2][5] Kawasaki was made responsible for producing 50 percent of the airframe, as well as coordinating development of the rotor system; the remaining airframe elements were manufactured by Mitsubishi and Fuji.[1] Development was formally launched in October 1992.[1]
In early 1996, the first OH-1 prototype was rolled out.[1] On 6 August 1996, the first of four OH-1 prototypes (designated XOH-1) performed the type's maiden flight. All four prototypes were flying by March 1997.[1] The four prototypes were delivered to the Japanese Defence Agency for service testing from June to August 1997.[6] By April 1998, flight testing of the prototypes was reportedly around half way complete, having accumulated a combined 400 flight hours during testing, further tests focused on flight validation, operational evaluation, and mission equipment functionality.[7] These four prototype aircraft were all later remanufactured to conform to production standards and redelivered under new serial numbers to the JGSDF.[1]
In June 1998, in response to the finalising of a production contract and an initial order for two OH-1s having been placed earlier that year, the manufacture of production OH-1s formally commenced;[6][7] By the late 1990s, the JGSDF had announced that it had planned to procure between 150[5] and 250 OH-Xs to meet its requirements.[1][6] This figure was significantly fewer than the 297 OH-6Ds that were in active service by March 1995, and there were repeated concerns that numbers could be further curtailed as a result of the impact of defense budget cuts. Procurement, and thus production, of the OH-1 was of a slow pace; each year, only a handful of rotorcraft would normally be purchased, such as a pair of OH-1s being the only units procured in 2004.[8][9] By 2013, production of the OH-1 was reportedly as presumed to have been terminated.[1]
During the 1990s, the JGSDF was interested in procuring a new attack helicopter during the following decade, seeking to replace the Fuji-built Bell AH-1 Cobra fleet. Amongst the proposals produced by Japanese industries was a derivative of the OH-1, tentatively designated as the AH-2.[10][11] In 1999, it was revealed that the JGSDF was actively studying the modification of the OH-1 into an attack helicopter suitable to their requirements.[12][13] The OH-1 had been intentionally designed with additional margin to accommodate such growth of scope, the main limiting factors being its transmission and engines. The AH-2 proposal would have involved installing uprated engines and the addition of new unspecified armaments for anti-tank combat missions; Boeing in particular was dismissive of the value of the proposed rotorcraft, claiming that it "cannot fulfill the attack requirement".[14] Kawasaki's proposal was ultimately rejected in favour of a locally-built variant of the Boeing AH-64 Apache.[1]
In 2005, Kawasaki proposed the development of a utility-orientated derivative of the OH-1 in response to the fledgling UH-X programme, which intended to replace the JGSDF's outdated fleet of Fuji-built Bell UH-1J Iroquois helicopters.[15] This variant, which would have used the OH-1 as a base, would have featured a new cabin, avionics, transmission and engines, but would have also retained a high level of commonality between the observation and utility models. In 2006, the Japanese government approved a request to fund development of a more powerful variant of the OH-1's Mitsubishi TS1-10 engine.[16] In March 2007, Kawasaki was reportedly close to finalizing its plans for the utility-orientated OH-1 derivative of the OH-1.[17] In 2012, a refreshed proposal for the UH-X requirement was made by Kawasaki, emphasizing its use of OH-1 technology.[18] In July 2015, the Japanese Ministry of Defense (MoD) announced its decision to accept a rival bid made by Fuji/Bell to domestically produce a modified version of the Bell 412 to meet the UH-X requirement instead.[19]
In early 2007, Kawasaki confirmed that it was studying several capability improvements for the OH-1 in terms of adaptability, maneuverability and stability; industry sources also claimed that improvements to the range of the OH-1 along with significant power output increases from the type's TS-1-10 engines.[17] Alternative powerplants for the OH-1 have also been suggested, such as the LHTEC T800 and the MTR MTR390.[7] In late 2008, Kawasaki was considered implementing a series of improvements aimed at increasing the payload of OH-1; this proposed modification was dependent upon demand from the Japanese defense ministry.[20]
The OH-1 Light Observation Helicopter is a tandem-seat, twin-engine scout helicopter. It has a narrow fuselage fitted with small stub wings and a non-retractable tail wheel undercarriage. The OH-1 is suited to armed scout, light escort, and observation duties.[1] It is equipped with an automatic pilot system with flight holding functionality, while the cockpit features a multi-display system to lower workloads on its two-man crew.[2]
The OH-1 is powered by a pair of Mitsubishi TS1 turboshaft engines, equipped with Full Authority Digital Engine Controls (FADEC), which drives a four-blade composite main rotor with a bearingless rotor hub along with a Fenestron-type anti-torque tail rotor (an enclosed tail-fan unit). The Fenestron uses eight asymmetrically spaced blades to reduce both noise and vibration.[1][5]
A roof-mounted electro-optical sensor turret is located forward of the rotor head, containing a forward looking infrared sensor, a laser rangefinder and a colour TV camera. A total of four hardpoints are fitted under the rotorcraft's stub wings to allow the carriage of external stores, these have a total capacity of 132 kg (291 lb). The outer pylons can carry four Type 91 guided surface-to-air missiles, while the inner pylons are capable of carrying external fuel tanks for additional range or endurance.[5] No additional armament is typically fitted.[5]
In January 2000, the first production standard OH-1 was delivered to the JGSDF.[1] The OH-1 is slated to replace the Hughes OH-6D, which remains in service as the primary aircraft in this role.
Data from Kawasaki Aerospace[2]
General characteristics
Performance
Armament
Aircraft of comparable role, configuration, and era
Related lists
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.