Jiangtai Road station
Guangzhou Metro station From Wikipedia, the free encyclopedia
Jiangtai Road Station (Chinese: 江泰路站; Jyutping: gong1 taai3 lou6 zaam6; Cantonese Yale: Gōngtaai Louh Jaahm; lit. 'Jiangtai Road Station') is an interchange station between Line 2 and Line 11 of the Guangzhou Metro. The underground station is located at the junction of Jiangnan Avenue (江南大道) and Jiangtai Road (江泰路) in the Haizhu District of Guangzhou. The Line 2 station opened on 25 September 2010, whilst the Line 11 station opened on 28 December 2024.[1]
![]() Line 2 platform | ||||||||||||||||
Chinese name | ||||||||||||||||
Chinese | 江泰路站 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Intersection of Jiangnan Avenue (江南大道) and Jiangtai Road (江泰路), Fengyang Subdistrict Haizhu District, Guangzhou, Guangdong China | |||||||||||||||
Coordinates | 23°04′56″N 113°16′50″E | |||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | Line 2 Line 11 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 208 1126 | |||||||||||||||
History | ||||||||||||||||
Opened | 25 September 2010 (Line 2) 28 December 2024 (Line 11) | |||||||||||||||
Previous names | Jiangtai Lu (2010-27 December 2024) | |||||||||||||||
Services | ||||||||||||||||
|
Station layout
Line 2
G | - | Exits A-D |
L1 Concourse |
2 Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Transfer to 11 |
L2 Platforms |
Platform 2 | ![]() |
Island platform, doors will open on the left | ||
Platform 1 | 2 towards Jiahewanggang (Changgang) ![]() |
Line 11
G | - | Exits E-H |
L1 Concourse |
11 Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Transfer to 2 |
L2 | - | Station equipment |
L3 Platforms |
Platform 4 | ![]() |
Island platform, doors will open on the left | ||
Platform 3 | 11 Outer Circle (Wufeng) ![]() |
Exits
Gallery
- Line 2 concourse
- Line 11 concourse
- Line 2 platform view
- Line 11 platform
- Line 2 platform panorama
- Line 11 platform panorama
History
Summarize
Perspective
Construction
The main station structure of Line 11 started construction in January 2022,[2] and was topped out on 29 May 2023.[3]
In order to withstand the flow of passengers from Line 11, the station body of Line 2 was renovated on the eve of the opening of Line 11, and the Line 2 station converted the original staircase connecting the concourse to the platform into an escalator, and a new set of stairs was built in the middle of the concourse to connect to the platform. In addition, a passenger queueing space is set up in the Line 11 concourse before entering the transfer interface so that it can be used for transferring passengers from Line 11 during peak traffic restrictions.[4]
Operation
On 28 September 2010, the station was officially put into use with the opening of the new Line 2 and Line 8.[5]
When the station was first opened, it was called Jiangtai Lu in English. In 2022, the Office of the Foreign Affairs Commission of the Guangzhou Municipal Party Committee issued a new version of the "English Translation and Writing Specifications for Public Signs in Guangzhou (2022 Edition)", which requires the English naming of roads to be standardized.[6] Thus, the English station name of the station will be changed to Jiangtai Road when Line 11 opens. Related materials have also been updated on the eve of the opening of Line 11.[7] On 28 December 2024, the Line 11 station was put into use.[8]
Neighboring buildings
- Jiangnan Dadao South Public Transport Interchange
- Xiaoyuan Secondary School
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.