Excellence-class cruise ship
Excellence class of cruise ship From Wikipedia, the free encyclopedia
Remove ads
Excellence class of cruise ship From Wikipedia, the free encyclopedia
The Excellence class,[1][2][3] including the sub-classes Helios class[4] and XL or Excel class,[5] is a class of cruise ships ordered by Carnival Corporation & plc for its subsidiary brands AIDA Cruises, Costa Cruises, P&O Cruises and Carnival Cruise Line. The ships are being constructed by Meyer Werft at their shipyard in Papenburg, Germany, and Meyer Turku at their shipyard in Turku, Finland. The first, AIDAnova, entered service for AIDA Cruises in 2018.
AIDAnova, the first ship in the class, in 2018 | |
Class overview | |
---|---|
Builders | |
Operators | |
Preceded by |
|
Built | 2017–2023 |
In service | 2018–present |
Planned | 11 |
Building | 0 |
Completed | 9 |
Active | 9 |
General characteristics | |
Type | Cruise ship |
Tonnage | 183,900 GT |
Displacement | 80,000 |
Length | 1,115 ft (340 m) |
Height | 69.3 m (227 ft 4 in)-72 m (236 ft) |
Installed power | 4x MaK 16VM46DF, 57.2 MW total |
Propulsion | Two ABB azimuth thrusters, 37 MW total |
In March 2015, Carnival Corporation entered into a strategic partnership with Meyer Werft to build new ships between 2018 and 2022.[6] In June 2015, four ships were ordered for delivery between 2019 and 2020.[7][8] In September 2016, three more ships were ordered for Carnival Cruise Line and P&O Cruises for delivery in 2020 and 2022. [9] In February 2024, Carnival Cruise Line placed an order for another Excellence class ship for delivery in 2027.
The Excellence class are the first cruise ships in the world to be dual fueled by liquefied natural gas (LNG) and traditional fuel oil, which is intended to make them more environmentally friendly than traditional, diesel-powered ships.[8] Each ship is expected to cost $950 million.[10]
The first four ships in the class suffered delivery delays. The delays of AIDAnova, Costa Smeralda and Mardi Gras were attributed to the ships being the first to be fueled by LNG, design complexities, difficulties coordinating subcontractors, and the large size of the ships.[3] The delay of Iona was due to a temporary suspension of operations by P&O Cruises, and slower construction progress, in response to the COVID-19 pandemic.[11] Mardi Gras was later delayed until 2021, also due to the pandemic.[12]
Ship | Subclass | Built | Operator | Builder | Gross tonnage | Flag | IMO number | Notes | Image | Newbuilding no. |
---|---|---|---|---|---|---|---|---|---|---|
AIDAnova | Helios class[13] | 2018 | AIDA Cruises | Meyer Werft | 183,858[14] | Italy | 9781865 | World's first LNG-powered cruise ship.[15] | S.696 | |
Costa Smeralda | 2019 | Costa Cruises | Meyer Turku | 185,010[16] | Italy | 9781889 | NB 1394 | |||
Iona | Excel class[5] | 2020 | P&O Cruises | Meyer Werft | 184,089[17] | United Kingdom | 9826548 | S.710 | ||
Mardi Gras | Excel class[18] | 2020 | Carnival Cruise Line | Meyer Turku | 180,800[19] | Bahamas | 9837444 | NB 1396 | ||
AIDAcosma | Helios class[13] | 2021 | AIDA Cruises | Meyer Werft | 183,900[10] | Italy | 9781877 | Originally planned for 2020. | S.709 | |
Costa Toscana | 2021 | Costa Cruises | Meyer Turku | 186,364[10] | Italy | 9781891 | Originally planned for 2020. | NB 1395 | ||
Carnival Celebration[20] | Excel class[18] | 2022 | Carnival Cruise Line | Meyer Turku | 183,521[21] | Bahamas | 9837456 | Construction started on January 13, 2021.[22] | NB 1397 | |
Arvia[23] | Excel class[5] | 2022 | P&O Cruises | Meyer Werft | 185,581[24] | United Kingdom | 9849693 | Construction started on February 22, 2021.[25] | S.716 | |
Carnival Jubilee[26] | Excel class | 2023 | Carnival Cruise Line | Meyer Werft | 183,521[27] | Bahamas | 9851737 | Originally ordered for AIDA Cruises.[28] Construction started on March 18, 2022.[29] | S.717[30] | |
TBA | Excel class | 2027 | Carnival Cruise Line | Meyer Werft | 180,000 | Order announced February 13, 2024.[31] first order by the Carnival Corporation after five years[32] |
||||
TBA | Excel class | 2028 | Carnival Cruise Line | Meyer Werft | 180,000 | Order announced March 26, 2024.[33] Hermes cover underway[34][35] |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.