Remove ads
Settlement and civil parish in Lincolnshire, England From Wikipedia, the free encyclopedia
Conisholme is a small settlement and civil parish in the East Lindsey district of Lincolnshire, England. It is on the Cleethorpes to Mablethorpe A1031 road, and 7 miles (11 km) north-east from Louth. The population is included in the civil parish of Grainthorpe.
Conisholme | |
---|---|
St Peter's, Conisholme | |
Location within Lincolnshire | |
Population | 87 |
OS grid reference | TF402955 |
• London | 135 mi (217 km) SSW |
District | |
Shire county | |
Region | |
Country | England |
Sovereign state | United Kingdom |
Post town | LOUTH |
Postcode district | LN11 |
Dialling code | 01507 |
Police | Lincolnshire |
Fire | Lincolnshire |
Ambulance | East Midlands |
UK Parliament | |
Conisholme is approximately 3 miles (5 km) from the Lincolnshire coast. The parish covers an area of 1,240 acres (5.0 km2), but only a small amount is taken up by the A1031 road – from Ludney to the west to halfway between the village and Braygate Bridge, to the north-east. The major village of North Somercotes is to the east. The parish mostly extends south-west across Conisholme Fen towards the Louth Canal and North Cockerington.
The county council Louth Marsh and district council North Somercotes wards are both Conservative, and represented by Robert Palmer who is also the Chairman of East Lindsey District Council.[1]
The parish church is dedicated to St Peter.[2] It is in the North Somercotes group of churches, with Grainthorpe.
The wind turbines[3] at Fen Farm on Conisholme Fen,[4] south-west of the village, have the capacity to supply 24% of electricity needs in East Lindsey,[citation needed] Each turbine has a hub height of between 165 and 252 feet (50 and 77 m), a rotor diameter of 157 feet (48 m), an overall height of 292 feet (89 m), and produces 800kWe.[3] The farm, operated by Ecotricity, produces enough energy for 13,000 homes.[5]
The turbines were designed by architect Norman Foster[citation needed] and built by Enercon. Construction began in December 2007,[6] and was finished on 17 April 2008.[7]
During the early hours of 4 January 2009, one of the twenty wind turbines was damaged. The story received coverage on the BBC News.[8] Ecotricity, after its preliminary examination and before forensic results, stated that UFOs were "at the bottom of its probability list for the cause", and they were considering that the turbine may have suffered from a lightning strike, collision, metal fatigue, or design, material or maintenance failure.[9]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.