Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[1]

Quick Facts Overview, Native name ...
Line 5
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
LocaleChongqing, China
Termini
Stations31
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length48.7 km (30.3 miles)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Avenue
Chunxuan Avenue
Central Park West
     Line 10
Lujiagou
Ganyue Avenue
Yuhegou
The EXPO Garden Center
     Line 3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
     Loop line      Line 6
Dalongshan
     Line 6
Dashiba
Zhongshutuo
Hongyancun Bridge
across Jialing River
Hongyancun
     Line 9
Xietaizi
     Line 1
Shiqiaopu
     Line 1
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Bus interchange Chongqing West railway station      Loop line
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Jin'aoshan
Huayan Center
Zhongliangshan depot
Jiangtiao line
Tiaodeng
     Line 18
Shilinsi
DC 1.5 kV
AC 25 kV
Zhongliang Mts.
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu Depot
Jiangjin High-speed Railway
Shengquansi
Jijiang Rail Transit Bridge
across Yangtze River
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.
Close

History

Phase 1

Phase 1 of the line (from The EXPO Garden Center station to Tiaodeng station) began construction on 3 December 2013.[2]

The north section from The EXPO Garden Center to Dalongshan started operation on 28 December 2017, and it extended to Dashiba on 24 December 2018. The south section from Shiqiaopu to Tiaodeng started operation on 20 January 2021. Due to difficults on bridge building, the central section from Dashiba to Shiqiaopu is opened several years later, on 30 November 2023.[3]

Northern extension

The northern extension of this line began construction on 25 January 2019. The extension is 8.95 km (5.56 mi) in length with 7 new stations.[4] The extension opened on 27 February 2023.[5]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
The EXPO Garden Center Dalongshan 28 December 2017 16.42 km (10.20 mi)[6] 9 Phase 1 (North Section)
Dalongshan Dashiba 24 December 2018 1
Shiqiaopu Tiaodeng 20 January 2021 18.34 km (11.40 mi)[7] 12 Phase 1 (South Section)
The EXPO Garden Center Yuegangbeilu 27 February 2023[5][8] 8.95 km (5.56 mi)[4] 6 Northern Extension
Dashiba Shiqiaopu 30 November 2023[3] 4.95 km (3.08 mi) 3 Phase 1 (Central Section)
Close

Route map

Thumb

Thumb
Interior of a Line 5 train

Stations

Line 5

More information Service routes, Station № ...
Service
routes
Station
Station name Connections Distance
km
Location
E Local English Chinese
5
1
Yuegangbeilu 悦港北路 0 Yubei
5
2
Yuegang Ave. 悦港大道 0.94 0.94
5
3
Chunxuan Ave. 椿萱大道 1.22 2.16
5
4
Central Park West 中央公园西      Line 10 1.28 3.44
5
5
Lujiagou 鲁家沟 1.27 4.71
5
6
Ganyue Ave. 甘悦大道 0.92 5.63
5
7
Yuhegou 玉河沟 0.96 6.59
5
8
The EXPO Garden Center 园博中心 2.35 8.94
5
9
Danhe 丹鹤 1.37 10.31
5
1
Huxiajie 湖霞街 1.47 11.78
5
11
Chongguang 重光  15  1.49 13.27
5
12
Hemulu 和睦路 2.41 15.68
5
13
Renhe 人和 1.40 17.08
5
14
Xingfu Square 幸福广场 1.94 19.02
5
15
Ranjiaba 冉家坝      Line 6      Loop line 2.55 21.57
5
16
Dalongshan 大龙山      Line 6 1.01 22.58
5
17
Dashiba 大石坝  4  2.47 25.05 Jiangbei
5
18
Zhongshutuo 忠恕沱 0.86 25.91
5
19
Hongyancun 红岩村      Line 9 1.28 27.19 Yuzhong
5
2
Xietaizi 歇台子      Line 1      Line 18 1.66 28.85 Jiulongpo
5
21
Shiqiaopu 石桥铺      Line 1  27  1.56 30.41
5
22
Shixinlu 石新路 1.11 31.52
5
23
Bashan 巴山 1.02 32.54
5
24
Fengxilu 凤西路 1.81 34.35 Shapingba
Through-service to/from Tangjiatuo via Loop line
5
25
Chongqing West 重庆西站      Loop line Chongqing West railway station CXW 2.75 37.10 Shapingba
5
26
Huayan Temple 华岩寺 0.97 38.07 Jiulongpo
5
27
Huachenglu 华成路 2.02 40.09
5
28
Banshan 半山 0.86 40.95
5
29
Zhongliangshan 中梁山 1.58 42.53
5
3
Jinjianlu 金建路 1.91 44.44
5
31
Huayan Center 华岩中心 1.50 45.94
5
32
Tiaodeng 跳磴      Line 18 2.38 48.32 Dadukou
Through-service to/from Shengquansi via Jiangtiao line
Close

Jiangtiao line

Jiangtiao line (Chinese: 江跳线)[9] had been formerly known as the extension of Line 5. The section from Tiaodeng to Shengquansi (28.22 km (17.54 mi) in length[9]) opened in August 2022.[10] The section from Shengquansi to Dingshan (4.524 km (2.811 mi) in length[11]) is currently under construction.


References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.