Chirk railway station

Railway station in Wrexham, Wales From Wikipedia, the free encyclopedia

Chirk railway stationmap

Chirk railway station (Welsh: Y Waun) serves the town of Chirk, Wrexham County Borough, Wales. The station is on the Shrewsbury to Chester Line that is part of the former Great Western Railway mainline route from London Paddington to Birkenhead Woodside. The original 19th-century (grade 2 listed) Chirk / Y Waun station building was demolished in 1987, without consultation, by the local council.[3]

Quick Facts ChirkWelsh: Y Waun, General information ...
Chirk

Welsh: Y Waun
Thumb
General information
LocationChirk, Wrexham
Wales
Coordinates52.933°N 3.066°W / 52.933; -3.066
Grid referenceSJ284378
Managed byTransport for Wales
Line(s)Shrewsbury–Chester
Platforms2
Other information
Station codeCRK
ClassificationDfT category F2
History
Original companyShrewsbury, Oswestry and Chester Junction Railway
Pre-groupingGreat Western Railway
Key dates
12 October 1848Station opens[1]
13 July 1964Closed to goods
1 March 1974Unstaffed[2]
Passengers
2019/20 78,030
2020/21 14,788
2021/22 57,766
2022/23 73,002
2023/24 83,562
Notes
Passenger statistics from the Office of Rail and Road
Close

Chirk was also the eastern terminus and transfer point for the Glyn Valley Tramway.

Historical services

According to the Official Handbook of Stations the following classes of traffic were being handled at this station in 1956: G, P, F, L, H, C and there was a 15 cwt crane.[4] At one time there was also a private siding into the Cadbury's factory from where cocoa liquor was sent to the chocolate factory at Bournville.

The railway itself superseded the Llangollen Canal, which runs parallel to the railway through Chirk, for the transportation of coal and other goods.

Facilities

The station is unstaffed (and has been since 1974) but has a ticket vending machine where passengers may buy or collect pre-booked tickets before boarding. Stone waiting shelters are provided on both platforms, along with a fully accessible ramped footbridge linking them – this was installed in 2015 as part of a £2 million Welsh Assembly-funded station improvement project.[5] Train running information is provided via the CIS displays, automated announcements and timetable posters.[6]

Current services

Summarize
Perspective
Passenger

Trains run on two routes operated by Transport for Wales:

Some early morning & late evening trains run only between Shrewsbury and either Wrexham General or Chester only, whilst there is a single late evening service northbound to Manchester Piccadilly on weekdays only. Sundays see a two-hourly service to Chester & Birmingham International with a limited number of services to Holyhead & Cardiff.[7]

Freight

To the north of Chirk station on the Up (southbound) side of the line is a private siding into the Kronospan chipboard factory. The siding receives a trainload of softwood from Kingmoor Yard, Cumbria five days a week (Monday to Friday), and additionally, between the months of April and October, up to three trains a week of softwood from Ribblehead, North Yorkshire. Since 2007 these timber trains have been operated to the Chirk Kronospan factory by Colas Rail Ltd.

More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
Gobowen   Transport for Wales
Shrewsbury to Chester Line
  Ruabon
  Historical railways  
Trehowell Halt   Great Western Railway
Shrewsbury to Chester Line
  Whitehurst Halt
Close

References

Further reading

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.