Remove ads
Railway station in Bridgend, Wales From Wikipedia, the free encyclopedia
Bridgend railway station (Welsh: Gorsaf Pen-y-bont) is a main line station serving the town of Bridgend, south Wales. It is located approximately halfway between Cardiff Central and Swansea stations, at the point where the Maesteg Line diverges from the South Wales Main Line; it is also the western terminus of the Vale of Glamorgan Line from Cardiff. It is 190 miles 45 chains (306.7 km) measured from the zero point at London Paddington, via Stroud.[2]
This article needs additional citations for verification. (August 2011) |
General information | |||||
---|---|---|---|---|---|
Location | Bridgend, Bridgend county borough Wales | ||||
Coordinates | 51°30′25″N 3°34′30″W | ||||
Grid reference | SS907798 | ||||
Managed by | Transport for Wales Rail | ||||
Platforms | 4 | ||||
Other information | |||||
Station code | BGN | ||||
Classification | DfT category C2 | ||||
Key dates | |||||
19 June 1850 | Station opened | ||||
Passengers | |||||
2019/20 | 1.508 million | ||||
Interchange | 59,262 | ||||
2020/21 | 0.322 million | ||||
Interchange | 8,839 | ||||
2021/22 | 0.937 million | ||||
Interchange | 27,812 | ||||
2022/23 | 1.133 million | ||||
Interchange | 33,063 | ||||
2023/24 | 1.278 million | ||||
Interchange | 59,079 | ||||
Listed Building – Grade II | |||||
Feature | Bridgend Railway Station (W.Platform Building) | ||||
Designated | 29 September 1986 | ||||
Reference no. | 11306[1] | ||||
|
It is the fifth-busiest station in Wales, after Cardiff Central, Newport, Swansea and Cardiff Queen Street.
The station was opened on 18 June 1850, and both the main platform building and the 1877 pedestrian bridge are Grade II listed.[3] The station was designed by Isambard Kingdom Brunel.[citation needed]
In 1945, German Field Marshal Gerd von Rundstedt arrived at the station when he was transferred to the Island Farm prisoner of war camp.
Services on both branch lines from the station were withdrawn for a time in the 1960s & early 1970s (trains on the Vale of Glamorgan line fell victim to the Beeching cuts in June 1964, whilst Maesteg trains were withdrawn in July 1970), but because the lines remained in-situ due to coal traffic for the Aberthaw Power Station, each one has since been reopened to passenger services.
Platform 3 was a full length platform running east-to-west until the 1970s when it was removed following the closure of the Maesteg line to passenger traffic. The cafe/waiting area of platform 2 now occupies land where the track used to sit.
Platform 1A was opened in June 2005 by Andrew Davies to act as the terminus for the newly re-opened Vale of Glamorgan Line, with trains now running through to and from Aberdare.
A second, and fully accessible footbridge, was built in 2012 at a cost of £2.4m[4] and the main station ticket hall and entrance was refurbished in 2018 at a cost of £1.5million.[5]
The station is fully staffed throughout the week, with the ticket office on platform 1 open from early morning until mid-evening. A self-service ticket machine is also provided for use and for the collection of pre-paid tickets. There is a waiting room and photo booth in the main building on platform 1, whist the amenities on platform 2 include toilets and a coffee shop. Train running details are offered via CIS displays, automatic announcements and timetable posters. Step-free access is available to all platforms via lifts in the accessible footbridge at the northern end.[6]
Passenger services are operated by Great Western Railway to and from London Paddington and Swansea, with some services extended to Carmarthen; and by Transport for Wales to destinations across Wales.
To the west, Transport for Wales trains run along the South Wales Main Line and West Wales Line to Swansea and then to Carmarthen, Pembroke Dock, Milford Haven or Fishguard Harbour.
Mainline services to Swansea and London run hourly (with extra services at peak hours), whilst the regional trains to Manchester Piccadilly via Shrewsbury and local trains to Maesteg and over the Vale of Glamorgan Line also run hourly; the Swanline local stopping trains to/from Swansea run every two hours.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Pencoed | Transport for Wales Maesteg line |
Wildmill | ||
Llantwit Major | Transport for Wales Vale line |
Terminus | ||
Cardiff Central | Transport for Wales Swanline |
Pyle | ||
Pencoed | Transport for Wales South Wales Main Line |
Port Talbot Parkway | ||
Cardiff Central | Great Western Railway London – Swansea |
Port Talbot Parkway | ||
Historical railways | ||||
Southerndown Road Line open; station closed |
Barry Railway Vale of Glamorgan Railway |
Terminus |
Platforms 1 and 2 are full length platforms used for all long distance services on the South Wales Main Line.
Platform 1A was opened in 2005 and is a bay platform which acts as the terminus for the Vale of Glamorgan Line.
Platform 3 was briefly recommissioned in the early 2000s as an overflow bay platform facing west (it was previously the through outer face of an island platform until removal in the mid-1970s), and was used for services from Maesteg, although has since fallen into non-use.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.