Bangabandhu Railway Bridge
Bridge in Sirajganj, & Tangail Bangladesh From Wikipedia, the free encyclopedia
Bridge in Sirajganj, & Tangail Bangladesh From Wikipedia, the free encyclopedia
Bangabandhu Railway Bridge also known as Jamuna Railway Bridge is an under-construction dual-gauge, double-track railway bridge on Jamuna River. This bridge connects Sirajganj with Tangail by railway network.[1] After construction this bridge will be the longest solo railway bridge in Bangladesh. As of October 2020, 44 trains per day pass through the existing Bangabandhu Bridge. As the bridge does not allow trains to run at full speed with the speed limit set to 20 km/h and being a single-track railway takes longer to cross the bridge, trains are prone to schedule disruptions. Also, heavy goods trains cannot run on the bridge due to weight restrictions. At the Bangabandhu Railway Bridge, the average time to reach the destination of the trains running between the capital Dhaka and the northern and western regions of the country will be reduced by 2 hours. Besides, the facility of transporting goods by rail from neighboring countries will increase. Apart from this, this bridge will also be useful for easy transportation of passengers and goods on internal routes. Apart from this, the bridge is an important link between SAARC, BIMSTEC, SASEC, and other regional and sub-regional railway routes and trans-Asian railway network. When the bridge is built, the railway tracks of the Bangabandhu Bridge will be removed.[2]
This article's lead section may be too long. (October 2023) |
Bangabandhu Railway Bridge বঙ্গবন্ধু রেল সেতু | |
---|---|
Coordinates | 24.4026°N 89.7681°E |
Carries | Dual-Gauge Rail-line |
Crosses | Jamuna River |
Locale | Sirajganj, & Tangail Bangladesh |
Official name | Bangabandhu Railway Bridge |
Other name(s) | Jamuna Railway Bridge |
Owner | Bangladesh Railway |
Characteristics | |
Total length | 4.8 kilometres (3 mi) |
Location | |
First, on 6 December 2016, the Executive Committee of the National Economic Council (ECNEC) approved the construction project of the bridge.[3] For this, the Bangladesh government undertook the project at a cost of Tk 9,734 crore, of which Japan's development cooperation organization Japan International Cooperation Agency (JICA) will provide Tk 7,724 crore. The project is scheduled to be implemented by December 2023.
However, in the next revised project, the deadline has been extended by two years to December 2025. At the same time, the project cost has been increased from Tk 9,734 crore to Tk 16,781 crore. JICA will provide loan assistance of 72% of the construction cost. Bangladesh Railway will implement the project. This project has been carried out by the Obayashi-Toa-JFE (OTJ) Joint Venture and IHI-SMCC Joint Venture for the eastern and western parts, respectively. Additionally, the project involves constructing a 7.6 km double-line railway approach embankment, 30.73 km of dual-gauge track, 16 viaducts, and renovating the Bangabandhu Bridge East and West stations and yards. After completion, the bridge will increase the number of trains that can pass between the capital and the northwest by 88, significantly improving rail connectivity in the region. This bridge can accommodate broad-gauge trains traveling at 120 km/h and meter-gauge trains moving at 100 km/h.
According to latest reports, this project is about 94% complete. Jamuna Railway Bridge is scheduled to be inaugurated by December 2024.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.