A4 motorway (Romania)

Motorway in Romania From Wikipedia, the free encyclopedia

A4 motorway (Romania)

The A4 motorway (Romanian: Autostrada A4) is a motorway in Romania that serves as a bypass for the city of Constanța, between Ovidiu and the Port of Constanța, connecting with the A2 motorway via an interchange southwest of the city. It is 22 km long and is planned to be extended to approximately 60 kilometers, stretching further south to the Bulgarian border south of Mangalia, along the western Black Sea coast.[1] The motorway is part of an extension of the Pan-European Corridor IV, that will be connecting with the Bulgarian city of Varna.[2]

Quick Facts motorway, Route information ...
A4 motorway shield}}
A4 motorway
Autostrada A4 (România).jpg
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length21.8 km (13.5 mi)
60 km (37 mi) planned (approx.)
Existed2011–present
Major junctions
North endOvidiu
Major intersections A 2 near Constanța
South endVama Veche (border with Bulgaria)
Location
CountryRomania
Major citiesConstanța, Mangalia
Highway system
A 3 A 5
Close
The interchange between the A2 motorway and the A4 motorway

Description

Summarize
Perspective

The contract for the construction of the stretch of motorway between Ovidiu and Lazu was awarded in September 2008 to the joint venture between the Italian company Astaldi and the Spanish company FCC Construction, and was due to be completed until November 2011.[3]

A new bridge was built over the Danube – Black Sea Canal, downstream of the Agigea lock,[4] in order to allow access to the busier southern terminal of the Port of Constanța directly from the motorway.[5] Works began in July 2010, and were planned to be completed in 2014.[6]

The bypass was initially built with funds from the state budget, but in the end of 2014, the European Commission awarded funds for the construction from the Cohesion Fund.[7]

The northern end is planned to be extended with an expressway through Tulcea and ending in Brăila, including Brăila Bridge over Danube,[8] that would be designated the "DEx8".[9] As for the southern end, it is planned that tender procedures begin in 2023 for the segment between Agigea and 23 August (c. 29 km), also termed the "Techirghiol Alternative", that would bypass Eforie and its surrounding area. This particular project would involve a reconfiguration of the junction with A2 in order to provide access to the new motorway segment, as well as to nearby Cumpăna.[10]

Openings timeline

Exit list

Exits and buildings (Southbound)
Constanța bypass (22 km)
Motorway km 0 Ovidiu, Constanța Airport / Mamaia DN22 / DN2A opened July 2012
Service area km 3 Parking opened
Exit km 5 Poiana / Palazu Mare DC89 opened January 2022
Exit km 10 Valu lui Traian / Constanța City Centre DN3 opened September 2011
Interchange km 12 Cernavodă, Bucharest A 2 opened July 2011
Exit km 19 Constanța South / Eforie, Mangalia DN39 opened July 2011
Exit km 21 Port of Constanța opened July 2013