The Walterdale Bridge is a through arch bridge across the North Saskatchewan River in Edmonton, Alberta, Canada. It replaced the previous Walterdale Bridge in 2017. The new bridge has three lanes for northbound vehicular traffic and improved pedestrian and cyclist crossings.
Walterdale Bridge | |
---|---|
Coordinates | 53°31′43″N 113°30′07″W |
Carries | 105 Street northbound, pedestrian walkways |
Crosses | North Saskatchewan River |
Locale | Edmonton, Alberta, Canada |
Official name | Walterdale Bridge |
Named for | John Walter |
Maintained by | City of Edmonton |
Characteristics | |
Total length | 230 m (750 ft)[1] |
Longest span | 206 m (676 ft)[2] |
History | |
Opened | September 29, 2017 |
Statistics | |
Daily traffic | 29,885 (2023)[3] |
Location | |
(Previous) Walterdale Bridge | |
---|---|
Coordinates | 53°31′43″N 113°30′07″W |
Carries | 105 Street northbound, pedestrian walkway |
Crosses | North Saskatchewan River |
Locale | Edmonton, Alberta, Canada |
Official name | Walterdale Bridge (1967–2017) |
Other name(s) |
|
Named for | John Walter |
Maintained by | City of Edmonton |
Characteristics | |
Design | Steel truss with steel grating deck |
Total length | 214.2 m (703 ft) |
History | |
Opened | 1913 |
Closed | 2017 |
Replaced by | New Walterdale Bridge |
Location | |
The previous Walterdale Bridge (formerly called the 105 Street Bridge, renamed in 1967)[4] was a steel grating-decked truss bridge. It was built in 1913 by the Dominion Bridge Company and was named after John Walter, an early settler who ran a ferry at this approximate location.[5] The neighbourhood Walterdale at this location was also named after John Walter.[6]
Demolition of the 1913 bridge began in October 2017 after the decking, sidewalks, and utilities had been removed, and was completed by the end of that year.[7]
Planning for the replacement of the 1913 Walterdale Bridge began over a decade before construction on the new bridge started. In 2001, an Edmonton City Council committee rejected a $190-million proposal for a tunnel under Saskatchewan Drive to directly connect the new bridge to Gateway Boulevard.[8] Planners considered both a four-lane one-way bridge and a five-lane bridge with a single southbound lane to connect the area to Kinsmen park.[8]
Construction began on a replacement bridge in early 2013 and was scheduled to be completed in late 2015; however, it did not open (two lanes only) until September 18, 2017. The contractor faced over $10 million in penalties for the delay. The new bridge has three lanes for northbound vehicular traffic and improved pedestrian and cyclist crossings. Roadway and trail links north and south of the bridge were partially complete, and the pedestrian access and all lanes opened on September 29, 2017.[9]
The new bridge is east of the original bridge site, and is supported by concrete thrust blocks on the banks of the river, eliminating the need for piers. The arches are 56 m (184 ft) tall.[10]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.