Sungei Kadut MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Sungei Kadut MRT stationmap

Sungei Kadut MRT station is a future Mass Rapid Transit interchange station on the North South (NSL) and Downtown (DTL) lines, located in Sungei Kadut, Singapore. The station was first announced as a provisional station on the NSL Woodlands Extension in the 1990s. In 2019, the Land Transport Authority (LTA) confirmed plans for its construction as part of the Land Transport Master Plan (LTMP) 2040. The station is expected to be completed in 2035.

Quick Facts General information, Coordinates ...
Sungei Kadut
 NS6  DE2 


双溪加株
சுங்கை காடூட்
Future Mass Rapid Transit (MRT) interchange and terminus
Sungei Kadut MRT station site
General information
Coordinates1°24′48″N 103°44′56″E
Owned byLand Transport Authority
Operated bySBS Transit DTL Pte Ltd (ComfortDelGro Corporation) (Downtown line)
SMRT Trains Ltd (SMRT Corporation) (North South line)
Line(s)
PlatformsSide (North South line)
Construction
Structure typeUnderground (Downtown line)
Elevated (North South line)
Platform levels2
AccessibleYes
History
Opening2035; 10 years' time (2035)
Previous namesKadut
Services
Preceding station Mass Rapid Transit Following station
Yew Tee
towards Jurong East
North–South Line
Future service
Kranji
Terminus Downtown Line
Future service
DE1
towards Sungei Bedok
Location
Singapore MRT/LRT system map
Sungei Kadut
Sungei Kadut station in Singapore
Close

History

Thumb
The future station will be built where the train is.

When the Woodlands Extension was announced in the 1990s, Sungei Kadut (then named Kadut under station code N19) was one of the stations part of the extension, but was made as a provisional station. The station was to be built only when the Sungei Kadut Industrial Estate was being redeveloped.[1][2]

In the Land Transport Master Plan 2040, the Land Transport Authority (LTA) announced that Sungei Kadut station will be built as an infill station built between Kranji and Yew Tee stations, serving upcoming industrial developments in the area by JTC Corporation and the 18 hectares (0.18 km2) Agri-Food Innovation Park. In addition, the station is planned to interchange with the Downtown line (DTL), which would extend from its current terminus at Bukit Panjang station.[3][4] Sungei Kadut will be the third purpose-built station connecting both elevated and underground rail services, after Sengkang and Punggol.[5]

A 1.5 kilometres (0.93 mi) viaduct is planned to connect the NSL to the Gali Batu Depot.[6] Construction of the station is planned to commence at the end of 2025 with an expected operational date of 2035.[7]

References

Wikiwand - on

Seamless Wikipedia browsing. On steroids.