The Sheoraphuli–Bishnupur branch line is a railway line connecting Sheoraphuli on the Howrah–Bardhaman main line and Bishnupur. The 39-kilometre long (24 mi) railway line traverses Hooghly in the Indian state of West Bengal. Sheoraphuli is 23 kilometres (14 mi) from Howrah. It is part of the Kolkata Suburban Railway system.

Quick Facts Sheoraphuli–Bishnupur branch line, Overview ...

Sheoraphuli–Bishnupur branch line
Kamarkundu railway station lies on Sheoraphuli–Tarakeswar branch line
Overview
StatusOperational
OwnerIndian Railways
LocaleWest Bengal
Termini
Stations9
Service
TypeHeavy rail
SystemElectrified
Operator(s)Eastern Railway
History
Opened1885; 140 years ago (1885)
Technical
Line length39 km (24 mi)
Track gauge5 ft 6 in (1,676 mm) broad gauge
Operating speedup to 100 km/h (62 mph)
Route map

km
119
Bishnupur
111
Birshamunda Halt
102
Gokulnagar Joypur
96
Maynapur
section
under construction
89
Baragopinathpur
80
Jayarambati
76
Kamarpukur
70
Goghat
Kalipur Bridge over
Dwarakeswar River
Ghatal
Irphala
Right arrow
to Bowaichandi on
Bankura–Masagram line
(
under
construction
)
60
Arambagh P.C.Sen
51
Mayapur
45
Takipur Halt
Furfura Sharif
Jangipara
Champadanga
40
Talpur Halt
35
Tarakeswar
Right arrow
to Dhaniakhali on
Howrah–Bardhaman chord
(
under
construction
)
33
Loknath
28
Bahirkhanda
25
Kaikala
22
Haripal
20
Maliya
17
Nalikul
13
Kamarkundu
11
Singur
7
Nasibpur
5
Diara
SH-13 (PalsitDankuni Road)
Baidyabati Canal
0
Sheoraphuli
km
Sources:

[1] [2] [3] [4]

Close

History

The broad gauge Sheoraphuli–Tarakeswar branch line was opened by the Tarkessur Railway Company on 1 January 1885 and was worked by East Indian Railway Company.[5][6] The Tarkessur company was taken over by the East Indian Railway in 1915.[7]

The Howrah–Bardhaman chord, which crosses this branch line at Kamarkundu, was opened in 1917.[6] In Railway budget 2010–11, restoration of 51-kilometre long (32 mi) long Tarakeswar to Magra section as 5 ft 6 in (1,676 mm) Broad Gauge railway line was proposed. The work is sanctioned in 2010–11. at a cost of 365.17 Cr. Also Tarakeswar– Furfura Sharif 21.8-kilometre long (13.5 mi) New Line project work was sanctioned in year 2012–13 at a cost of Rs. 162.37 Cr. Final location survey completed. Alignment plan for 20.1-kilometre long (12.5 mi) approved. Land plan under finalisation. Formation and Bridge work completed in Railway land. 219 hectares of land will be required. Formation and bridge work completed in Railway land. Work could not be started due to non availability of land. However the work has been kept in abeyance by Railway board.[8]

Electrification

Thumb
Bishnupur tarakeshwar railway map

The Sheoraphuli–Tarakeswar branch line was first electrified with 3,000 V DC system in 1957. Subsequently, when the Railways decided to adopt the AC system, the branch line was converted to 25 kV AC system in 1967.[9] EMU coaches were introduced on electrification.

Tarakeswar–Bishnupur extension

Thumb
Sheoraphuli–Bishnupur branch line map

The 102-kilometre long (63 mi) Tarakeswar–Bishnupur project was sanctioned in 1999–2000, but not much work was done for the next decade. After Mamata Banerjee again became railway minister in 2009, work was speeded up.[10] Eastern Railway gave out details of the project in 2003. The proposed fully electrified line was divided into three parts: Tarakeswar–Arambagh 25.6-kilometre long (15.9 mi), Arambagh–Kodabari 19.6-kilometre long (12.2 mi), and Kodabari–Bishnupur 56.8-kilometre long (35.3 mi).[11]

Train services were opened in the Tarakeswar–Talpur section on 25 April 2010.[12] The Talpur–Arambagh sector was opened on 4 June 2012, without electrification and auto signaling.[13]

At the time of inaugurating the line, the Chief Minister had said that the Arambag railway station was to be named after former West Bengal chief minister Prafulla Chandra Sen and the Mayapur railway station was to be named after Raja Rammohan Ray.[14]

Without the overhead electrification the railways had no option but to run diesel-electric multiple unit (DEMU) trains initially.[13] Mukul Roy, railway minister, inaugurated the electrified line to Tarakeswar on 16 September 2012. EMU services have since been introduced.[15]

The completion of the Bishnupur–Gokulnagar sector was announced in the railway budget for 2009–10.[8]

In June 2016, Tarakeshwar–Goghat section was commissioned for EMU trains with the introduction of three pairs of Howrah–Goghat locals.

In March 2024, construction work between Maynapur & Kamarpukur has started.[16]

Stations

More information Sheoraphuli–Bishnupur line, # ...
Sheoraphuli–Bishnupur line
# Station Name Station Code Connections
1BishnupurVSU
2 Birsha Munda Halt BSMH
3 Gokulnagar-Joypur GNJP
4MaynapurMAYPNone
5 Baragopinathpur BRGNP
6 Jayrambati
7 Kamarpukur
8GoghatGOGTNone
9ArambaghAMBGNone
10TarakeswarTAK
11HaripalHPLNone
12KamarkunduKQUNone
13SheoraphuliSHE
Close

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.