Rutshuru Hydroelectric Power Station
Dam in Rutshuru, North Kivu / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Rutshuru Hydroelectric Power Station?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Rutshuru Hydroelectric Power Station, also referred to as Rutshuru Hydropower Station, (French: Centrale hydroélectrique de Rutshuru) is a 13.8-megawatt (18,500 hp) hydroelectric power station under construction in the Democratic Republic of the Congo.[1] The plant was finished on December 16, 2015.[2]
Quick Facts Country, Location ...
Rutshuru Power Station | |
---|---|
Country | Democratic Republic of the Congo |
Location | Rutshuru, North Kivu |
Coordinates | 01°13′33″S 29°27′36″E |
Status | Operational |
Dam and spillways | |
Impounds | Rutshuru River |
Reservoir | |
Normal elevation | 1,600 m (5,200 ft) |
Commission date | December 16, 2015 |
Type | Run-of-the-river |
Turbines | 2 |
Installed capacity | 13.8 MW (18,500 hp) |
Close