Railway electrification in Great Britain
Electrification of railway lines / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Railway electrification in Great Britain?
Summarize this article for a 10 year old
Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails. The two most common systems are 25 kV AC using overhead lines, and the 750 V DC third rail system used in Southeast England and on Merseyrail. As of October 2023, 6,065 kilometres (3,769 mi) (38%) of the British rail network was electrified.[1]
According to Network Rail, as at 2003, 64% of the electrified network used the 25 kV AC overhead system, and 36% used the 660/750 V DC third-rail system.[2]
The electrified network is set to expand over the coming years, as 25 kV electrification is extended to currently unelectrified lines such as the Midland Main Line, as well as lines in the North of England as part of the Northern Hub.[3]