![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/4/46/CC5_Nicoll_Highway_MRT_Platforms_20210423_122552.jpg/640px-CC5_Nicoll_Highway_MRT_Platforms_20210423_122552.jpg&w=640&q=50)
Nicoll Highway MRT station
Mass Rapid Transit station in Singapore / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Nicoll Highway MRT station?
Summarize this article for a 10 year old
Nicoll Highway MRT station is an underground Mass Rapid Transit (MRT) station on the Circle Line (CCL) in Singapore. Located in the Downtown Core underneath Republic Avenue near the Kallang River, the station serves commercial and residential developments along Nicoll Highway, such as the Golden Mile Complex and The Concourse. The station is operated by SMRT Trains.
CC5
Nicoll Highway 尼诰大道 நிக்கல் நெடுஞ்சாலை | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
![]() Platform level of Nicoll Highway MRT station | |||||||||||
General information | |||||||||||
Location | 20 Republic Avenue Singapore 038970[1] | ||||||||||
Coordinates | 01°17′59″N 103°51′49″E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Depth | 21.5 m (71 ft)[2] | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes (Golden Mile Complex) | ||||||||||
Bicycle facilities | Yes[3] | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 17 April 2010; 14 years ago (2010-04-17) | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Kampong Glam, Sultan Gate[4] | ||||||||||
Services | |||||||||||
| |||||||||||
|
First announced as part of the Marina MRT line (MRL) in 1999, the station was incorporated into Stage 1 of the CCL in 2001. During the construction, the tunnels linking to the original station site caved in along with the highway on 20 April 2004, killing four people. Following an investigation, which found human error and organisational failures as causes of the collapse, the station was relocated. Alongside the other stations on Stages 1 and 2 of the CCL, the station opened on 17 April 2010.
Designed by Ong & Ong, the station is 21.5 m (71 ft) deep and has a black and grey scheme. One of the two station entrances is linked to an overhead bridge. Nicoll Highway station features a public artwork Re-claiming the Peripherals by Khiew Huey Chian, consisting of four reliefs depicting wild plants.