Loading AI tools
Road in Hungary From Wikipedia, the free encyclopedia
The M85 expressway (Hungarian: M85-ös autóút) is a Hungarian expressway connecting Győr to Sopron. It will eventually connect M1 motorway to the Austrian border.
You can help expand this article with text translated from the corresponding article in Hungarian. (April 2018) Click [show] for important translation instructions.
|
M85 expressway | |
---|---|
M85-ös autóút | |
Route information | |
Part of E65 | |
Length | 83 km (52 mi) 95 km (59 mi) planned |
Existed | 2008–present |
Major junctions | |
From | M1 near Győr |
| |
To | Sopron A 3 border with Austria |
Location | |
Country | Hungary |
Counties | Győr-Moson-Sopron |
Major cities | Győr, Csorna, Sopron |
Highway system | |
|
Section | Length | Opened | Notes |
---|---|---|---|
Győr nyugat (M1) – Enese | 8.0 km (4.97 mi) | 16 June 2015[1] | Built between 2013 – 2015. |
Enese bypass | 7.0 km (4.35 mi) | 21 December 2011 | Built between 2009 – 2011. |
Enese – Kóny | 3.0 km (1.86 mi) | 16 June 2015[1] | Built between 2013 – 2015. |
Kóny – Csorna | 6.0 km (3.73 mi) | 9 September 2015[2] | Built between 2013 – 2015. |
Csorna bypass I. | 5.0 km (3.11 mi) | 9 September 2015[2] | Segment I. (East), built between 2013 – 2015. Common route with M86 expressway. This section was extended 2x3 lane. |
Csorna bypass II. (M86 junction - Csorny nyugat) | 4.5 km (2.80 mi) | 15 December 2017[3] | Segment II. (West), built between 2015 – 2017. |
Csorna nyugat – Sopron kelet | 51.0 km (31.69 mi) | 16 December 2020 | Built between 2017 – 2020. |
Sopron kelet – Balf | 2.5 km (1.55 mi) | 9 June 2021 | Built between 2017 – 2021. |
Balf – Sopron észak | 6.4 km (3.98 mi) | 10 December 2021 | Built between 2018 – 2021. |
Sopron észak to the border | 4.6 km (2.86 mi) | Planned in 2024 | Under construction, with Sopron Tunnel |
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. (November 2021) |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Győr-Moson-Sopron |
0 | Main road 1 – Győr / M1 / E60 / E75 – Mosonmagyaróvár, towards to Vienna (A), Bratislava (SK) / Main road 85 – Ikrény / |
The eastern terminus of the expressway.
Kilometrage starting point Roundabout and interchange junction | ||
8 | Rábapatona | ||||
10 | Lébény, Bezi / Enese, Tét | ||||
16 | Kóny / Rábcakapi | Connecting to petrol station and Truck parking. | |||
21 | Main road 85 – Csorna | ||||
23 | 85 / E65 – Mosonmagyaróvár
M85 – Sopron / |
The northern terminus of the common road with M85-M86 expressways, and E65 route.
The eastern part of Csorna bypass. The northern terminus of 2x3 lane road. | |||
over the Győr–Sopron railway line | |||||
25 | over the Pápa–Csorna railway line | ||||
27 | M85 – Sopron, Kapuvár
M86 / E65 Szombathely, towards to Marbor (SLO) |
The southern terminus of the common road with M85-M86 expressways, and E65 route.
The southern part of Csorna bypass. The southern terminus of 2x3 lane road. | |||
over the Hegyeshalom–Szombathely railway line | |||||
32 | Jobaháza, Farád / Csorna nyugat | nyugat means West | |||
40 | Babóti pihenőhely | parking, WC, and water (petrol station in the future)
pihenőhely means Rest area | |||
44 | Beled, Hövej / Kapuvár | ||||
53 | Fertőd, Fertőendréd | Connecting to Main road 85. | |||
55 | Széchenyi pihenőhely | parking, WC, and water | |||
60 | Kőszeg, Lövő / Fertőszentmiklós | ||||
68 | under the Győr–Sopron railway line | ||||
72 | Main road 84 – Nagycenk / Sárvár | Connection to Sopron, and the Lake Balaton. | |||
78 | Hutbájd pihenőhely | parking, WC, and water
Tengelysúlymérő állomás means weigh in motion (traffic control) | |||
79 | over the Győr–Sopron railway line | ||||
Ikva híd | híd means Bridge | ||||
82 | Main road 84 – Kópháza (border) / Sopron Centrum
|
||||
85 | Sopron-Balf / Sopron-Pihenőkereszt | ||||
89 | Sopron észak / Fertőrákos | észak means North | |||
90 | Soproni alagút | Length: 780 m
alagút means Tunnel | |||
93 | Main road 84 – Sopron nyugat / Ágfalva | nyugat means West
Western under construction section | |||
94 | Scarbantia pihenőhely | Planned | |||
95 | Soporn (H) – Klingenbach (AT) border crossing A 3 – Eisenstadt towards to Vienna |
Planned | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc.. This activity is provided by these highway engineers.
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica);
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette | Available section |
---|---|
Győr-Moson-Soporn | full length (0 km – 83 km) |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.