Long Range Strike Bomber
US Air Force program in support of Northrop Grumman B-21 Raider development / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Long Range Strike Bomber?
Summarize this article for a 10 year old
The Long Range Strike Bomber (LRS-B) is a development and acquisition program to develop a long-range strategic bomber for the United States Air Force,[1] intended to be a heavy-payload stealth aircraft capable of delivering thermonuclear weapons.[2] Initial capability is planned for the mid-2020s. A request for proposal to develop the aircraft was issued in July 2014. The Air Force plans to procure at least 100[3] of the LRS-B aircraft at a cost of an estimated $550 million each (2010 dollars), with potentially as many as 200 units being considered to enter service eventually.[4][5][6] A development contract was awarded to Northrop Grumman for its B-21 Raider in October 2015. Due to the sensitive nature much about the project is highly classified and little information is available to the public. As of late 2019, it was known that construction of the aircraft had commenced,[7][8] and on December 2, 2022, it was unveiled to the public.[9]
Long Range Strike Bomber | |
---|---|
General information | |
Project for | Strategic stealth bomber |
Issued by | United States Air Force |
Proposals | • Boeing/Lockheed Martin • Northrop Grumman |
History | |
Concluded | 27 October 2015 (contract awarded for development) |
Outcome | Northrop Grumman selected to produce its entry as B-21 Raider |
Predecessors | Next-Generation Bomber |
Variations | 2037 bomber controversy |