Loading AI tools
Metro station in Chongqing, China From Wikipedia, the free encyclopedia
Liyuchi is a metro station of Line 9 and Line 10 of Chongqing Rail Transit in Jiangbei District of Chongqing Municipality, China.[1][2]
Liyuchi 鲤鱼池 | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||
Location | Chongqing China | ||||||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | ||||||||||||||||||
Line(s) | Line 9 Line 10 | ||||||||||||||||||
Platforms | 4 (2 island platforms) | ||||||||||||||||||
Connections | |||||||||||||||||||
Construction | |||||||||||||||||||
Structure type | Underground | ||||||||||||||||||
Accessible | 2 accessible elevators | ||||||||||||||||||
Other information | |||||||||||||||||||
Station code | 9/13, 10/09 | ||||||||||||||||||
History | |||||||||||||||||||
Opened | 28 December 2017 (Line 10) 25 January 2022 Line 9) | ||||||||||||||||||
Services | |||||||||||||||||||
|
It serves the area surrounding East Jianxin Road.
The station opened with Line 10 and its 2 platforms on 28 December 2017 and was expanded on 25 January 2022 with Line 9 in addition to 2 more platforms.
An island platform is in use for Line 9 trains travelling in both directions. This section of the station is located on the east of the Line 10 platform.
To Line 9 Gaotanyan | ← | 9/13 | ← | ||
---|---|---|---|---|---|
Island Platform, doors open on the left | |||||
→ | 9/13 | → | To Line 9 Huashigou |
An island platform is used for Line 10 trains travelling in both directions. As stations beyond here toward Lanhualu are part of Phase II of the metro line, which is still under construction, all South-bound Line 10 trains terminate here. The station will act as a reversing station using its single transition line for trains to switch direction until Phase 2 is completed. Before November 2022, only one side of the platform was in use as the terminus for south-bound trains.
Since November 2022, to cooperate with the debugging of Phase 2, the reserved platform has been put into use for trains towards Wangjiazhuang. However, at the beginning of the debugging, some trains still terminate here. But when the period is over, no trains will terminate here.
To Line 10 Houbao (No boarding) |
←→ | 10/09 | ←→ | ↘ | |
---|---|---|---|---|---|
Island platform, doors open on the left | ↓ | ||||
→ | 10/09 | → | To Line 10 Wangjiazhuang |
To Line 10 Houbao | ← | 10/09 | ← | ||
---|---|---|---|---|---|
Island platform, doors open on the left | |||||
→ | 10/09 | → | To Line 10 Wangjiazhuang |
There are a total of 8 entrances/exits for the plan of station, still 4 exits reserved for its future construction.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.