Loading AI tools
From Wikipedia, the free encyclopedia
This is a list of operational hydroelectric power stations in Canada with a current nameplate capacity of at least 100 MW.
The Sir Adam Beck I Hydroelectric Generating Station in Ontario was the first hydroelectric power station in Canada to have a capacity of at least 100 MW upon completion in 1922. Since then numerous other hydroelectric power stations have surpassed the 100 MW threshold. All but two of Canada's provinces or territories are home to at least one hydroelectric power station, those without being Prince Edward Island and Nunavut.
This is a list of the hydroelectric power stations under construction with an expected nameplate capacity of at least 100 MW.
Name | Province | Location | Capacity (MW) | Owner | Type | Year | Ref |
---|---|---|---|---|---|---|---|
Keeyask | Manitoba | 56°20′47″N 95°12′17″W | 695 | Manitoba Hydro | Reservoir | 2021 | [38] |
Site C dam | British Columbia | 56°11′41″N 120°54′51″W | 580 | BC Hydro | Run-of-the-river | 2024 | [39] |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.