Lakvijaya Power Station
From Wikipedia, the free encyclopedia
From Wikipedia, the free encyclopedia
The Lakvijaya Power Station (Sinhala: ලක් විජය බලාගාරය, romanized: Lak Vijaya Balāgāraya) (also known as the Norochcholai Power Station (Sinhala: නොරොච්චෝලෙ ගල් අඟුරු බලාගාරය, romanized: Noroccōle Gal An̆guru Balāgāraya; Tamil: நுரைச்சோலை அனல்மின் நிலையம், romanized: Nuraiccōlai Aṉalmiṉ Nilaiyam), after its location) is the largest power station in Sri Lanka.
Lakvijaya Power Station | |
---|---|
Official name |
|
Country | Sri Lanka |
Location | Puttalam |
Coordinates | 8°01′06″N 79°43′22″E |
Status | Operational |
Construction began |
|
Commission date |
|
Construction cost |
|
Owner | Government of Sri Lanka |
Operator | Ceylon Electricity Board |
Employees | About 1000 |
Thermal power station | |
Primary fuel | |
Site area |
|
Chimneys |
|
Cooling source | |
Power generation | |
Units operational | 3 × 300 MW |
Make and model | Unknown (3) |
Nameplate capacity | 900 MW |
Annual net output | 2200 GWh |
External links | |
Website | www |
Commons | Related media on Commons |
The power station is in Norocholai, Puttalam, on the southern end of the Kalpitiya Peninsula. Construction of the facility began on 11 May 2006, with the first unit commissioning on 22 March 2011.[1] The first 300-megawatt phase was completed and ceremonially commissioned by President Mahinda Rajapaksa on 22 March 2011 at 18:27 local time, with the presence of Minister of Energy Champika Ranawaka, deputy Minister of Energy Premalal Jayasekara.[2][3]
According to the Ceylon Electricity Board, the US$455 million first phase generates nearly 1.7 TWh of electricity annually — a significant amount when compared to Sri Lanka's total production of 11.5 TWh in 2011.[4] The plant is connected to the grid via 115 km (71 mi) 220-kilovolt transmission line to Veyangoda. Power station exhausts are emitted through a 150 m (492 ft) tall chimney, one of the country's tallest man-made structures.[1]
During its pre-development stages, protests were launched by residents living at the project site, claiming that they were deceived by the government.[5]
Since its creation the power plant has faced several breakdowns.[6] It has been alleged by the Power and Renewable Energy Deputy Minister, Ajith P. Perera, that the power plant was built with substandard and outdated material and is below international standards, and that the government is unable to claim any damages as the Rajapaksa government agreed to use the materials specified in the agreement which are sub-standard.[7]
In the plant, the electricity is produced using a steam turbine which is capable of producing 300MW. Coal is used as the fuel to produce steam that will then be used to rotate the turbine at a speed of 3000 rpm. The coal is imported from Indonesia. The coal in India is cheaper as compared with Indonesia, but Indonesian coal is used since the Indian coal contains more sulfur. Despite this, the vessels that carry coal come from a Russian port.[15]
At first the coal is brought from Indonesia via ships (65 tons per ship). The ships are anchored around 5 km from shore. This coal is brought in to the plant by using barges (long flat-bottomed boats) and then by conveyors.
The coal should be maintained around 10% moisture content immediately before it is used. It needs to be ground as powder before it is burnt. There are five "mills" that pulverize (grind) the coal. Four ball mills work at a time while another one is in standby.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.