Hammersmith Bridge
Suspension bridge in London, England From Wikipedia, the free encyclopedia
Suspension bridge in London, England From Wikipedia, the free encyclopedia
Hammersmith Bridge is a suspension bridge that crosses the River Thames in west London. It links the southern part of Hammersmith in the London Borough of Hammersmith and Fulham, on the north side of the river, with Barnes in the London Borough of Richmond upon Thames, on the south side of the river. The current bridge, which is Grade II* listed and was designed by civil engineer Sir Joseph Bazalgette, is the second permanent bridge on the site,[3] and has been attacked three times by Irish republicans.
Hammersmith Bridge | |
---|---|
Coordinates | 51°29′18″N 0°13′49″W |
Carries | A306 road |
Crosses | River Thames |
Locale | London, England |
Maintained by | Hammersmith and Fulham London Borough Council |
Preceded by | Barnes Railway Bridge |
Followed by | Putney Bridge |
Characteristics | |
Design | Suspension bridge |
Material | Steel, wrought iron, cast iron, plywood |
Pier construction | Stone |
Total length | 700 ft (210 m) |
Width | 43 ft (13 m) |
Longest span | 400 ft (120 m)[1] |
No. of spans | 3 |
Piers in water | 2 |
Clearance below | 3.5 metres (11 ft) MHWS[2] |
No. of lanes | 2 (motor vehicles) |
History | |
Designer | William Tierney Clark (first bridge) Joseph Bazalgette (current bridge) |
Constructed by | Dixon, Appleby & Thorne (current bridge) |
Construction start | 1825 (first bridge) 1884 (current bridge) |
Construction end | 1827 (first bridge) 1887 (current bridge) |
Construction cost | £80,000 (first bridge) £82,117 (current bridge) |
Opened | 6 October 1827 (first bridge) 11 June 1887 (current bridge) |
Inaugurated | 6 October 1827 (first bridge) 11 June 1887 (current bridge) |
Rebuilt | 1884–1887 |
Closed | 10 April 2019 (motor vehicles) |
Statistics | |
Listed Building – Grade II* | |
Official name | Hammersmith Bridge |
Designated | 12 May 1970 |
Reference no. | 1079819 |
Location | |
The bridge was closed indefinitely to all motor traffic in April 2019 after cracks were discovered in the bridge's pedestals.[4] The closure was extended to pedestrians and cyclists between August 2020[5] and July 2021 when limited use resumed. In October 2022, Hammersmith and Fulham Council agreed to lodge a planning application to temporarily double-deck the bridge to speed up its restoration, with the council's construction and ongoing operation and maintenance costs set to be eventually funded by tolls.
Hammersmith Bridge Act 1824 | |
---|---|
Act of Parliament | |
Long title | An Act for building a Bridge over the River Thames, from the Hamlet of Hammersmith in the County of Middlesex, to the Parish of Barnes in the County of Surrey, and for making convenient Roads and Avenues to communicate with such Bridge. |
Citation | 5 Geo. 4. c.cxii |
Dates | |
Royal assent | 9 June 1824 |
Other legislation | |
Repealed by |
|
Status: Repealed |
A group of local people proposed a new bridge at Hammersmith rather than detouring to either Kew Bridge or Putney Bridge to cross the river.[6] The construction of the bridge was first sanctioned by an act of Parliament, the Hammersmith Bridge Act 1824 (5 Geo. 4. c.cxii), on 9 June 1824, which established the Hammersmith Bridge Company.[7] Work began on site the following year, and the bridge was opened on 6 October 1827.[8] Construction of the bridge cost some £80,000 (equivalent to £8.9 million in 2023).[9]
Hammersmith Bridge Act 1828 | |
---|---|
Act of Parliament | |
Long title | An Act for altering and amending an Act passed in the Fifth Year of His present Majesty, for building a Bridge over the River Thames at Hammersmith, and for making convenient Roads to communicate therewith. |
Citation | 9 Geo. 4. c. lii |
Dates | |
Royal assent | 23 May 1828 |
Other legislation | |
Repeals/revokes |
|
Repealed by | |
Status: Repealed | |
Text of statute as originally enacted |
It was the first suspension bridge over the River Thames and was designed by William Tierney Clark.[10][11] A further act of Parliament, the Hammersmith Bridge Act 1828 (9 Geo. 4. c. lii) was obtained in 1828. The acts also included powers to acquire land by compulsory purchase in order to build approach roads, and required the company to purchase the entire Barn Elms estate (the surplus land was subsequently sold).[7]
Hammersmith Bridge Road in Hammersmith was also constructed with the bridge, together with Upper Bridge Road (now Castelnau) and Lower Bridge Road (now Lonsdale Road) in Barnes. It was operated as a toll bridge, with the toll house located at the Hammersmith end of the bridge.
The bridge had a clear water-way of 688 feet 8 inches (209.91 m). Its suspension towers were 48 feet (15 m) above the level of the roadway, where they were 22 feet (6.7 m) thick. The roadway was slightly curved upwards, 16 feet (4.9 m) above high water, and the extreme length from the back of the piers on shore was 822 feet 8 inches (250.75 m), supporting 688 feet (210 m) of roadway. There were eight chains, composed of wrought-iron bars, each five inches deep and one thick. Four of these had six bars in each chain; and four had only three, making thirty-six bars, which form a dip in the centre of about 29 feet (8.8 m).[12] From these, vertical rods were suspended, which supported the roadway, formed of strong timbers covered with granite. The width of the carriageway was 20 feet (6.1 m), with two footways of 5 feet (1.5 m). The chains passed over the suspension towers, and were secured to the piers on each shore. The suspension towers were built of stone, and designed as archways of the Tuscan order. The approaches were provided with octagonal lodges, or toll-houses, with appropriate lamps and parapet walls, terminating with stone pillars, surmounted with ornamental caps.
In order to increase profits, the company built a floating steamboat pier to the downstream side of the suspension pier closest to Barnes.[7]
By the 1870s, the bridge was no longer strong enough to support the weight of heavy traffic and the owners were alarmed in 1870 when 11,000 to 12,000 people crowded onto the bridge to watch the University Boat Race,[3] which passes underneath just before the halfway point of its 4+1⁄4-mile (7 km) course.
The Metropolitan Board of Works purchased the bridge from the Hammersmith Bridge Company in 1880 under the Metropolis Toll Bridges Act 1877 (40 & 41 Vict. c. xcix),[7] and transferred the approach roads to the local authorities (Fulham District Board of Works and the Parish of Barnes). The tolls were removed from the bridge on 26 June 1880.[7]
There were no immediate plans to replace the bridge, which remained sound, until a boat collided with it in 1882 causing damage, and leading to an Act of Parliament[which?] in 1883 authorising the construction of a replacement.[13] In 1884 a temporary bridge was put up to allow a more limited cross-river traffic while a replacement was constructed.[3]
The current Hammersmith Bridge was designed by Sir Joseph Bazalgette and rests on the same pier foundations constructed for Tierney Clark's original structure. The new bridge was built by Dixon, Appleby & Thorne and was opened by the Prince of Wales on 11 June 1887.[14] With much of the supporting structure built of wrought iron, it is 700 feet (210 m) long and 43 feet (13 m) wide and cost £82,117 to build (equivalent to £11.5 million in 2023).[9]
With the abolition of the Metropolitan Board of Works on 21 March 1889, ownership of Hammersmith Bridge passed to the new London County Council.[15]
Near midnight on 27 December 1919, Lieutenant Charles Campbell Wood, a South African serving as an airman in the Royal Air Force, dived from the upstream footway of the bridge into the Thames to rescue a drowning woman. Although Wood saved her life, he later died from tetanus as a consequence of his injuries. His act of bravery is commemorated by a plaque on the handrail, which reads:
Lieutenant Charles Campbell Wood RAF
of Bloemfontein, South Africa dived from this spot into
the Thames at midnight 27 Dec. 1919 and saved a woman's life.
He died from the injuries received following the rescue.
The first attempt by Irish republicans to destroy Hammersmith Bridge occurred on Wednesday 29 March 1939, when it was attacked by the IRA (of 1922–1969) as part of their S-Plan.[16][17] Maurice Childs, a women's hairdresser from nearby Chiswick, was walking home across the bridge at one o'clock in the morning when he noticed smoke and sparks coming from a suitcase that was lying on the walkway.[16] He opened it to find a bomb and quickly threw the bag into the river. The resulting explosion sent up a 60-foot (18 m) column of water. Moments later, a second device exploded causing some girders on the west side of the bridge to collapse and windows in nearby houses to shatter. Childs was later awarded an MBE for his quick-thinking. Eddie Connell and William Browne were subsequently jailed for 20 and 10 years respectively for their involvement in the attack.[17]
On 1 April 1965, the bridge was transferred to the Greater London Council (GLC) when it took over from London County Council.[15]
In 1986 the GLC was abolished. The Local Government Act 1985 transferred non-trunk road bridges in their entirety to one of the two London boroughs that each bridge lay within – the choice of borough to be decided between the two councils, or failing agreement, by the Secretary of State for Transport. In addition to the bridge, the London borough taking responsibility also gained 100 yards of approach road from the other borough. For Hammersmith Bridge, on 31 March 1986 the London Borough of Hammersmith and Fulham took responsibility.[15]
On 26 April 1996, the Provisional IRA attempted to destroy the bridge after installing two large Semtex devices on the south bank of the Thames. Though the detonators were activated, the bomb, the largest Semtex bomb ever found in Britain at the time,[17] failed to ignite.[11][15]
At 4:30 am on 1 June 2000, the bridge was damaged by a Real IRA bomb planted underneath the Barnes span.[15] Following two years of closure for repairs the bridge was reopened with further weight restrictions in place.[18]
Hammersmith Bridge has long suffered structural problems and has been closed for lengthy periods on several occasions, due to the weight and volume of road traffic now common in inner London, which the bridge was not originally designed to support.
The bridge was refurbished in 1973 with replacement steel trusses, improvements to the mid-span hangers and new deck expansion joints. New deck timbers were installed and surfacing was changed from wooden blocks to coated plywood panels. These panels were subsequently replaced in 1987.
In 1984, the Barnes-side tower bearings failed under a heavy load and had to be replaced.
In February 1997, the bridge was closed to all traffic except buses, bicycles, motorcycles, emergency vehicles and pedestrians to allow further essential repair works. Structural elements of the bridge had been found to be corroded or worn, in particular cross girders and deck surfacing, as well as some areas of masonry.[19]
The bridge re-opened in July 1998 to all road users, subject to a 7.5-tonne (7.4-long-ton; 8.3-short-ton) weight restriction and with a priority measure in place for buses. Local bus flow was controlled by traffic lights, and routes (such as the number 72) were required to convert from double-decker buses to smaller single-deckers to reduce the load on the bridge.
As part of the renovations following the 2000 bomb attack, the bridge received a complete new paint job restoring it to the original colour scheme of 1887, and new lighting was installed.
The bridge was declared a Grade II* listed structure in 2008, providing protection to preserve its special character from unsympathetic development.[20]
The bridge was temporarily closed to traffic to allow repairs in early 2014.[21] Further repairs and strengthening works were delayed in November 2016 in a wrangle over funding between Hammersmith and Fulham Council and Transport for London. LBHF leader Steven Cowan said: "There's no way that this council is going to spend anything like that money, the majority of this issue is the responsibility of TfL and we will work with them to make sure the bridge is fit for public purpose".[22]
With funding for a major refurbishment still not resolved, on 10 April 2019, Hammersmith and Fulham Council announced that the bridge would be closed indefinitely to motor vehicular traffic due to safety concerns. Pedestrians and cyclists could continue to use the bridge.[23][24][15] It was later (24 May 2019) reported that the closure was due to cracks in the bridge's pedestals, the footings which support the structure.[25]
On 10 October 2019, Planning in London magazine published the results of its competition for a quick fix to Hammersmith Bridge's closure. The winning entry, by marine civil engineers Beckett Rankine, consisted of a prefabricated temporary road and foot bridge downstream of Hammersmith bridge and connecting in to Queen Caroline Street on the Hammersmith side. Beckett Rankine claimed that the bridge's cost could be recouped by charging a toll on vehicles.[26][27]
The bridge's closure was extended to pedestrians and cyclists on 13 August 2020 after the structural issues worsened due to a heatwave.[15] River traffic and pedestrian routes under the bridge were also stopped.[5][28][29] The New York Times reported an estimate of £141 million (US$187 million) to fully repair the bridge and £46 million (US$65 million) to stabilise it adequately for use by cyclists and pedestrians. Neither the council nor the transportation authority had the funds to proceed. Deficits incurred due to the COVID-19 pandemic made it unlikely that the bridge would be repaired in the near future.[28]
On 9 September 2020, the Secretary of State for Transport, Grant Shapps appointed a Department for Transport task force to investigate the bridge's condition, and work towards reopening the bridge for cyclists and pedestrians, and later enabling the return of motor traffic.[30][15] In October 2020, it was announced that Hammersmith Bridge would not re-open to vehicles until at least 2027.[31] In November 2020, engineers proposed a temporary double-decked steel structure fitted within the existing bridge crossing to allow elements of the damaged bridge to be removed for repair. The scheme, designed by Foster and Partners with bridge engineers COWI, was backed by the local council and presented to Shapps.[32]
The Fosters scheme, costed at around £100 million, would potentially allow the bridge to reopen for pedestrians and cyclists in the summer of 2021, with cars and vans able to cross two months later, and full restoration completed in 2023. The proposals were discussed on 19 March 2021 at a meeting of the government's Hammersmith Bridge taskforce, and plans for the work to be funded through a £3 toll scheme were accepted.[33][34]
In December 2020, reports from AECOM and University of Cambridge professor Norman Fleck suggested that the full closure may have been overly cautious, and that, after minimal work, the bridge could be reopened to cyclists and pedestrians.[35]
On 14 February 2021, local residents illuminated the bridge scarlet with a Valentine's Day message reading Broken Hearts. Broken Promises. Broken Lives. Broken Bridge, to highlight the ongoing delays to its repair.[36]
On 1 June 2021, Transport for London, Hammersmith and Fulham Borough Council and central government came to a cost-sharing agreement that would reopen the bridge in the near future.[37] The following month, Stephen Cowan, leader of the Council, announced that the bridge would partially re-open to pedestrians and cyclists from 17 July 2021,[38] but local MP Sarah Olney said there was still a lot of work to be done to the bridge.[39]
A £6 million, 46-week stabilisation plan designed by consultants Mott MacDonald was approved by Hammersmith and Fulham Council in August 2021. This initial pedestrian stabilisation plan is the first phase of works on the bridge. A second phase, involving extensive strengthening and full restoration, will allow the bridge to eventually reopen to motor vehicles.[40]
In February 2022, highways contractor FM Conway and subcontractors Freyssinet and Taziker Industrial started work on a planned 10-month first phase of the restoration. The council approved the full £8.9 million investment in expectation that DfT and TfL will subsequently reimburse the council for their one-third shares.[41] Completion of this work was put back to February 2023 following delays in procuring steel due to the Russian invasion of Ukraine.[42]
In May 2022, Hammersmith and Fulham Council alerted contractors to the £130 million phase 2 contract ahead of formal procurement later in the year. It was considering delivery options including a design, build, finance and maintain model, a design-and-build contract,[43] or other "concession-style models", which could involve motor vehicles paying a toll to use the crossing. A council spokesman said: "The government has decreed that Hammersmith and Fulham must pay an unprecedentedly high 33% of the total cost. The only way that can be met is with a toll and this has been agreed by all parties."[44]
In July 2022, the chains were wrapped in foil and cooled with air-conditioning to 13°C during a heatwave to prevent further cracking.[45][46]
In October 2022, Hammersmith and Fulham Council agreed to lodge a planning application to temporarily double-deck the bridge to speed up its restoration (as recommended by Foster/COWI). Consultation would be required with stakeholders including Historic England, the Environment Agency, Port of London Authority, Richmond Council and the Marine Management Organisation, while preparations would also require gas main diversions.[42] The council intended to appoint a private sector contractor to design, renovate, finance and maintain the bridge, with the council's construction and ongoing operation and maintenance costs funded by tolls.[42]
In February 2024, Hammersmith & Fulham Council announced the temporary reopening to cyclists of the central vehicle lane for a 10-week period from 13 February 2024.[47] This decision was due to a pause in construction works necessary for repairing a 130 m (430 ft) steel gantry damaged in a collision with a boat, MV Emerald of London, carrying West Ham United football fans to a match against Fulham in December 2023.[48]
The final stage of the stabilisation works is the replacement of the bridge's bearings on the four corner pedestals, following which Hammersmith & Fulham Council will "review e-mobility options to shuttle residents across the bridge, notably the elderly or disabled".[47]
On 18 January 2024, the BBC reported the cost of repairing the bridge had increased to £250 million (US$316 million).[49] A day later, London Mayor Sadiq Khan told the Evening Standard that "I do want that bridge fit for purpose for vehicles" but neither Hammersmith & Fulham Council nor TfL had the money to do so.[50] The Evening Standard noted that TfL's 2024 Business Plan did not include funding for the bridge.[50] While the bridge remains closed to motor vehicles, alternative transport options have been proposed.
In May 2023, the BBC reported climate charity Possible's proposal for a fleet of 10 autonomous pods to operate on the bridge and ferry people with mobility difficulties, alongside a two-way protected cycle lane and the existing pedestrian footways at a cost of £10 million (US$13 million).[51]
In 2021, a plan to launch a community pedicab service, proposed by Barnes Community Association using vehicles owned and operated by CityShuttle, was abandoned due to issues raised by TfL relating to the licensing status of pedicabs.[52]
However, The Pedicabs (London) Bill will make TfL responsible for regulating pedicabs[53] and in a House of Commons debate in November 2023 Richmond Park MP Sarah Olney welcomed the bill and proposed rickshaws "as an interim transport solution across Hammersmith bridge".[54] During debate of the bill on 11 December 2023, Baroness Stowell backed introducing pedicabs to the bridge: "The problems associated with the closure of Hammersmith Bridge, which have gone on for years, are very serious for local residents. Let us turn a negative into a positive: pedicabs offer an opportunity for local residents to hire one to cross the bridge, which would be really useful."[55]
At both the Hammersmith and Barnes ends of the bridge, there is a heraldic composition made up of seven coats of arms. These were formerly painted in their "correct" heraldic colours but have now been painted in the standard colour scheme. In the centre is the royal coat of arms of Queen Victoria which is surrounded by six others, representing the area of the Metropolitan Board of Works, from top clockwise:[56]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.