Glacier Wind Farm
Wind farm in Montana, USA / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Glacier Wind Farm?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
The Glacier Wind Farm spans southwest Glacier County and southeast Toole County in northern Montana. With a total generating capacity of 210 megawatts (MW), it became the largest wind farm in the state when the second construction phase came online at the end of 2009. A portion of the electricity is purchased by San Diego Gas and Electric.[1]
Quick Facts Official name, Country ...
Glacier Wind Farm | |
---|---|
![]() | |
Official name | Glacier Wind Farm |
Country | United States |
Location | Glacier and Toole County near Ethridge, Montana |
Coordinates | 48°30′28″N 112°05′27″W |
Status | Operational |
Construction began | July 2007 |
Commission date | Oct 2008 (phase I), Oct 2009 (phase II) |
Construction cost | $500 million |
Owner(s) | NaturEner |
Operator(s) | NaturEner |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 140 turbines |
Make and model | Acciona AW77 1.5 MW |
Nameplate capacity | 210 MW |
Capacity factor | 29.5% (average 2010-2019) |
Annual net output | 542 GW·h |
Close