The Gateway Expressway is a controlled-access toll road in Pinellas County, Florida completed in April 2024 at a cost of $598 million. The project consists of two branches: an elevated highway to be designated State Road 690 (SR 690) above 118th Avenue North between Interstate 275 (I-275) and U.S. Highway 19 (US 19) and a raised highway in the median of SR 686 from 118th Avenue North to the Bayside Bridge. Construction was approved in February 2014, began in November 2017, and completed on April 26, 2024.[1]
Quick Facts Route information, Status ...
State Road 686A, State Road 690 | ||||
Route information | ||||
Maintained by Florida's Turnpike Enterprise | ||||
Status | Open | |||
Existed | 2024–present | |||
History |
| |||
Major junctions | ||||
East end | I-275 in St. Petersburg | |||
West end | US 19 in Pinellas Park SR 686 at Bayside Bridge | |||
Location | ||||
Country | United States | |||
State | Florida | |||
Counties | Pinellas | |||