Dam in Nayarit, Mexico From Wikipedia, the free encyclopedia
The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build.[1] It is 640 m (2,100 ft) long and is 178 m (584 ft) high. The reservoir holds approximately 5,000,000,000 m3 (1.8×1011 cu ft) of water, and the generators are capable of producing 750 MW of electricity. The dam is operated by the Comisión Federal de Electricidad, a state-owned Mexican electric company. Throughout the construction of the El Cajón Dam, the following is estimated:
El Cajón Dam | |
---|---|
Location | Nayarit, Mexico |
Coordinates | 21°25′41″N 104°27′07″W |
Purpose | Power |
Construction began | 2003 |
Opening date | June 2007 |
Construction cost | US$800 million[1] |
Dam and spillways | |
Type of dam | Concrete-face rock-fill |
Impounds | Río Grande de Santiago |
Height | 178 m (584 ft) |
Length | 640 m (2,100 ft) |
Spillway type | Gate-controlled chute |
Spillway capacity | 14,864 m3/s (524,917 cu ft/s) |
Reservoir | |
Creates | El Cajón Reservoir |
Total capacity | 5,000,000,000 m3 (4,100,000 acre⋅ft) |
Power Station | |
Operator(s) | CFE |
Commission date | 2007 |
Type | Conventional |
Turbines | 2 x 375 MW Francis-type[2] |
Installed capacity | 750 MW |
Annual generation | 1,228 GWh |
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.