Loading AI tools
Late 2023 cargo spacecraft mission to ISS From Wikipedia, the free encyclopedia
NG-19 was the nineteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eighteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission launched on 2 August 2023 at 00:31:14 UTC.[1] This was the eighth launch of Cygnus under the CRS-2 contract.[2][3]
Names | CRS NG-19 |
---|---|
Mission type | ISS resupply |
Operator | Northrop Grumman |
COSPAR ID | 2023-110A |
SATCAT no. | 57488 |
Website | NG-19 |
Mission duration | 160 days, 17 hours, 50 minutes |
Spacecraft properties | |
Spacecraft | S.S. Laurel Clark |
Spacecraft type | Enhanced Cygnus |
Manufacturer |
|
Launch mass | 8,050 kg (17,750 lb) |
Payload mass | 3,785 kg (8,344 lb) |
Start of mission | |
Launch date | 2 August 2023, 00:31:14 UTC (8:31:14 pm EDT)[1] |
Rocket | Antares 230+ |
Launch site | MARS, Pad 0A |
End of mission | |
Disposal | Deorbited |
Decay date | 9 January 2024, 18:22 UTC |
Orbital parameters | |
Reference system | Geocentric orbit |
Regime | Low Earth orbit |
Inclination | 51.66° |
Berthing at ISS | |
Berthing port | Unity nadir |
RMS capture | 4 August 2023, 09:52 UTC |
Berthing date | 4 August 2023, 12:28 UTC |
Unberthing date | 22 December 2023, 10:00 UTC |
RMS release | 22 December 2023, 13:06 UTC |
Time berthed | 139 days, 21 hours, 32 minutes |
Cargo | |
Mass | 3,785 kg (8,344 lb) |
Pressurised | 3,749 kg (8,265 lb) |
Unpressurised | 36 kg (79 lb) |
Cygnus NG-19 mission patch |
Orbital ATK (now Northrop Grumman Innovation Systems) and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation Services (COTS) program, Orbital ATK designed, acquired, built, and assembled these components: Antares, a medium-class launch vehicle; Cygnus, an advanced spacecraft using a Pressurized Cargo Module (PCM) provided by industrial partner Thales Alenia Space and a Service Module based on the Orbital GEOStar satellite bus.[4]
This flight used the last remaining Antares 200 series LV, which was constructed in Ukraine and uses Russian motors. The next three Cygnus missions will use Falcon 9, and subsequent mission will use the next-generation Antares 300 series that does not depend on Ukrainian or Russian parts.[5]
Cygnus NG-19 was the eighth Cygnus mission under the Commercial Resupply Services-2 contract. Northrop Grumman Innovation Systems confirmed on 23 February 2021 that Thales Alenia Space of Turin, Italy, will fabricate two additional Pressurized Cargo Modules (PCMs) for a pair of forthcoming Commercial Resupply Services-2 missions. Current plans are for the two additional Cygnus spacecraft to be designated NG-18 and NG-19.[6]
Production and integration of Cygnus spacecraft are performed in Dulles, Virginia. The Cygnus service module is mated with the pressurized cargo module at the launch site, and mission operations are conducted from control centers in Dulles, Virginia and Houston, Texas.[4]
This was the fourteenth flight of the Enhanced-sized Cygnus PCM.[3][7]
The Cygnus spacecraft was loaded with a total of 3,785 kilograms (8,344 lb) of cargo and supplies before its launch, including 3,749 kilograms (8,265 lb) of pressurized and 36 kilograms (79 lb) of unpressurized cargo.
The cargo manifest is broken down as follows:[8][9]
The new experiments arriving at the orbiting laboratory will inspire future scientists and explorers, and provide valuable insight for researchers.
NASA Scientific Research studies: [10]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.