Wien Matzleinsdorfer Platz railway station
Railway station in Vienna, Austria / From Wikipedia, the free encyclopedia
Wien Matzleinsdorfer Platz is a commuter rail station in Favoriten, Vienna. The station is served by S-Bahn trains and regional trains that use the trunk line.
This article needs additional citations for verification. (February 2022) |
Quick Facts General information, Location ...
Wien Matzleinsdorfer Platz | ||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
S-Bahn and Regional rail station | ||||||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||||||
Location | 1050 Vienna Austria | |||||||||||||||||||||||||||||
Coordinates | 48°10′50″N 16°21′32″E | |||||||||||||||||||||||||||||
Owned by | ÖBB | |||||||||||||||||||||||||||||
Operated by | ÖBB | |||||||||||||||||||||||||||||
Line(s) | Verbindungsbahn | |||||||||||||||||||||||||||||
Platforms | 1 Island platform | |||||||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||
Structure type | Elevated | |||||||||||||||||||||||||||||
Parking | No | |||||||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||
Station code | MP | |||||||||||||||||||||||||||||
Fare zone | Core Zone (100) | |||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||
Opened | 1969 (1969) | |||||||||||||||||||||||||||||
Electrified | 15 kV 16,7 Hz | |||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
|
Close
The station was opened in 1969 above Matzleinsdorfer Platz. Connections are available to tram and bus services. Vienna's first moving sidewalk was opened here to connect the station to the nearby underground tram station. The station closed temporarily on the 27th March 2021 as part of the extension of the U2 underground line. The renovation works are expected to be completed in April 2022.[1]