Line M101 (Beijing Subway)
Proposed metro line in Beijing, China / From Wikipedia, the free encyclopedia
Line M101 of the Beijing Subway (Chinese: 北京地铁M101线; pinyin: Běijīng Dìtiě M101 Xiàn) is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. It is fully underground. It is scheduled to open in 2027.[3][4] The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.[3][2]
Quick Facts Overview, Status ...
Line M101 | |
---|---|
Overview | |
Status | Under construction |
Locale | Tongzhou district Beijing |
Termini |
|
Stations | 14 |
Service | |
Type | Rapid Transit |
System | Beijing Subway |
Operator(s) | Beijing MTR Corp. Ltd.[1] |
Depot(s) | Fuhaocun[2] |
Rolling stock | 3 car Type A, reservations for 3+3 car Type A in the future[3] |
History | |
Planned opening | 2027; 3 years' time (2027) (planned) |
Technical | |
Line length | 18.1 km (11.2 mi)[2][3] |
Character | Underground |
Operating speed | 100 km/h (62 mph) |
Close