![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/f/fd/HumberCollegeStation_March2023.jpg/640px-HumberCollegeStation_March2023.jpg&w=640&q=50)
Humber College station
Below-grade LRT station under construction in Canada / From Wikipedia, the free encyclopedia
Humber College is a below-grade light rail transit (LRT) station that is under construction on Line 6 Finch West, a new line that is part of the Toronto subway system. The station will be located at the southwest corner of Highway 27 and Humber College Boulevard on the Humber College North Campus in Etobicoke, Toronto. The station will be the western terminus of Line 6,[4][2] which is expected to open in late 2024.[3] A walkway will connect the LRT station to the nearby Humber College Bus Terminal.[5][6]
Quick Facts General information, Location ...
![]() Station under construction in March 2024 | |||||||||||
General information | |||||||||||
Location | Highway 27 & Humber College Boulevard Toronto, Ontario Canada | ||||||||||
Coordinates | 43.7299°N 79.6017°W / 43.7299; -79.6017 | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks |
| ||||||||||
Connections | ![]() | ||||||||||
Construction | |||||||||||
Structure type | Below-grade[2] | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | Q4 2024[3] | ||||||||||
Services | |||||||||||
| |||||||||||
Close