![cover image](https://wikiwandv2-19431.kxcdn.com/_next/image?url=https://upload.wikimedia.org/wikipedia/commons/thumb/2/2c/CC31_Cantonment_MRT_construction_site_20220815_134723.jpg/640px-CC31_Cantonment_MRT_construction_site_20220815_134723.jpg&w=640&q=50)
Cantonment MRT station
Mass Rapid Transit station in Singapore / From Wikipedia, the free encyclopedia
This article is about the MRT station in Singapore. For the station bearing the similar name in Kuala Lumpur, Malaysia, see Kentonmen MRT station.
Cantonment MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line (CCL), situated in Bukit Merah planning area, Singapore, along Everton Road near the junction of Spottiswoode Park Road. This station is part of Stage 6 of the Circle line which will "close the circle" between the HarbourFront and Marina Bay stations.
Quick Facts CC31 Cantonment广东民கெண்டொன்மன், General information ...
CC31
Cantonment 广东民 கெண்டொன்மன் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
![]() Construction site of Cantonment station in August 2022 | |||||||||||
General information | |||||||||||
Location | 100 Everton Road Singapore 089395 | ||||||||||
Coordinates | 1°16′22″N 103°50′12″E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2026; 2 years' time (2026) | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Old Railway Station, Spottiswoode Park[1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Close
The station is built underneath and will be integrated with the historic Tanjong Pagar railway station, which ceased operations on 1 July 2011.[2] Cantonment station will provide MRT access to the future Greater Southern Waterfront development. The station was to be opened in 2025 along with the other CCL6 stations, but was delayed to 2026 due to the COVID-19 pandemic.[3]