2014年,車站由紐約市公共運輸局員工翻新(而不是由外部承包商)。由電腦輔助的控制塔安裝在南端,IRT法拉盛線自動化(英语:SignalingoftheNewYorkCitySubway#Automation)的一部分。 First Train Runs On Elevated Line to Astoria
in the median strip ofthe planned North Central Freeway, but after that road was cancelled, the route ofthe replacement subway tunnel became controversial