Power Station with 3.6GW Installed Capacity Began Construction in Fengning. State Grid Corporation of China. 3 June 2013 [19 July 2014]. (原始内容存档于2013-06-27)
(原始内容存档于2018-06-13). Steve Kidd. How serious are the delays in China's nuclear programme?. Nuclear Engineering International. 2015-02-23 [2015-03-08]. (原始内容存档于2015-04-02)
Tower is unveiled. Civil + Structural Engineer. [2014-04-28]. (原始内容存档于2014-04-29). Trucks roll to begin Freedom Tower construction. Daily News (New York)