Tunnel hole-through
When the two sections of a tunnel under construction meetTunnel hole-through, also called breakthrough, is the time, during the construction of a tunnel built from both ends, when the ends meet, and the accuracy of the survey work becomes evident. Many tunnels report breakthroughs with an error of only a few inches, for example:the 1858 Blue Ridge Tunnel – 6 inches (150 mm) the 1944 Blue Ridge Tunnel replacement – 4 feet (1.2 m) - 1944 the Lötschberg Base Tunnel – 10 cm the Holland Tunnel - 1 cm