Map Graph

Olive Mount cutting

Railway cutting on the Liverpool-Manchester line in England

Olive Mount cutting, which was opened in 1830, is a 2-mile (3.2 km) sandstone railway cutting on the line to Manchester, 4 miles (6.4 km) from Liverpool. The cutting is 80 feet (24 m) deep and is situated between Wavertree Technology Park and Broad Green railway stations. The railway's engineer, George Stephenson, had hoped to avoid the problem of creating the cutting for the Liverpool and Manchester Railway by routing the line further north. However, that plan was objected to by the Earl of Derby and the Earl of Sefton.

Read article
File:Olive_Mount_railway_cutting,_Liverpool_(1).JPGFile:Excavation_of_Olive_Mount,_from_Bury's_Liverpool_and_Manchester_Railway,_1831_-_artfinder_76057.jpg
Top Questions
AI generated

List the top facts about Olive Mount cutting

Summarize this article

What is the single most intriguing fact about Olive Mount cutting?

Are there any controversies surrounding Olive Mount cutting?

More questions