Map Graph

BARD Offshore 1

BARD Offshore 1 is a 400 megawatt (MW) North Sea offshore wind farm with 80 BARD 5.0 turbines. Since the owner could not buy such 5MW offshore wind turbines in sufficient numbers in 2006, Dr. Bekker set up its own production of turbines. This should serve as the legacy for his children. The systems were developed by aerodyn Energiesysteme GmbH. A plant for rotor blades and nacelle assembly was built in Emden and a plant for the offshore foundations in Cuxhaven. Two turbine prototypes were set up at the Rysumer Nacken in 2007, and another prototype in Hooksiel in 2008. Construction was finished in July 2013 and the wind farm was officially inaugurated in August 2013. The wind farm is located 100 kilometres (60 mi) northwest of the isle Borkum in 40-metre (130 ft) deep water.

Read article
File:Bard_Offshore_2011.JPGFile:Map_of_the_offshore_wind_power_farms_in_the_German_Bight.png
Top Questions
AI generated

List the top facts about BARD Offshore 1

Summarize this article

What is the single most intriguing fact about BARD Offshore 1?

Are there any controversies surrounding BARD Offshore 1?

More questions