Remove ads
Highway in the United States From Wikipedia, the free encyclopedia
U.S. Route 21 or U.S. Highway 21 (US 21) is a north–south United States Numbered Highway, spanning 393 miles (632 km) from Hunting Island State Park, South Carolina, to Wytheville, Virginia. The route traverses three states, South Carolina, North Carolina, and Virginia. It connects southeastern cities, including Columbia, South Carolina, and Charlotte, North Carolina.
Route information | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Maintained by SCDOT, NCDOT, and VDOT | |||||||||||||
Length | 393 mi[1] (632 km) | ||||||||||||
Existed | November 11, 1926[2]–present | ||||||||||||
Tourist routes |
| ||||||||||||
Major junctions | |||||||||||||
South end | Hunting Island State Park, SC | ||||||||||||
| |||||||||||||
North end | I-81 / US 52 in Wytheville, VA | ||||||||||||
Location | |||||||||||||
Country | United States | ||||||||||||
States | South Carolina, North Carolina, Virginia | ||||||||||||
Counties | SC: Beaufort, Hampton, Colleton, Bamberg, Orangeburg, Calhoun, Lexington, Richland, Fairfield, Chester, York NC: Mecklenburg, Iredell, Yadkin, Surry, Wilkes, Alleghany VA: Grayson, Wythe | ||||||||||||
Highway system | |||||||||||||
|
US 21 starts at Hunting Island State Park, bypasses Beaufort, South Carolina, and then heads north across the low country, paralleling Interstate 77 (I-77) through urban and rural areas before entering North Carolina. In North Carolina, US 21 frequently merges with and splits from I-77. The route enters Virginia, passing through hilly terrain before ending at the intersection of Interstate 81 (I-81) / U.S. Route 52 (US 52) in Wytheville.
Despite the "1" indicating that it is a major north–south highway, US 21 only travels through three states and is no longer a cross-country route, as many sections have been replaced by I-77 in Ohio and West Virginia. Historically, US 21 was longer before the Interstate Highway System was established. US 21 originally ran from Cleveland, Ohio, to Yemassee, South Carolina, it was later extended to Beaufort and Hunting Island State Park. Over time, its length was reduced, making it the second-shortest major north–south route after U.S. Route 91 (US 91).
US 21 serves as an alternative to the more heavily trafficked interstates in the area, particularly I-77, I-26, and Interstate 95 (I-95).
US 21 travels 233.2 miles (375.3 km) through the state. Beginning at Hunting Island State Park, US 21 travels west toward Beaufort, where it widens to four lanes. The route bypasses Beaufort to the south, going through Port Royal, Shell Point, and Burton. In the Beaufort area, US 21 passes by the entrances to Parris Island and Marine Corps Air Station Beaufort, the major Marine Corps installations in the area. North of Beaufort, US 21 continues as a four-lane divided highway and intersects with US 17. The route travels in a wrong-way concurrency with US 17 south for seven miles (11 km) before turning north toward Yemassee, where it becomes a rural two-lane road and intersects with US 17 Alternate. North of Yemassee, US 21 splits off and crosses I-95 at exit 42.
The two-lane route continues through rural portions of the state. US 21 goes through Smoaks and Branchville and bypasses Orangeburg. North of Orangeburg, US 21 runs roughly parallel to I-26 until Gaston where it conjoins US 321 and becomes an urban highway. US 21 passes through Cayce, West Columbia, and Columbia.
North of Columbia, US 21 splits from US 321, reverting to a rural two-lane road parallel to I-77. In York County, US 21 enters urban areas again, connecting Rock Hill and Fort Mill. Near the North Carolina state line, US 21 merges with I-77 near Carowinds, then enters North Carolina.
US 21 begins as a concurrency with I-77 in Charlotte, which it repeats three times within the state. Its first break with I-77 is along Statesville Avenue, then proceeding through Huntersville and Cornelius, however, because of its close proximity to I-77 and North Carolina Highway 115 (NC 115), it has no interchange with I-485 by itself. The second break with I-77 occurs at Mooresville, where US 21 travels through the city and then northwest into Statesville. After Statesville, US 21 travels northeast to Harmony and Brooks Crossroads, before merging back with I-77 near Jonesville. However, Jonesville and Elkin connect with US 21 Bus. through centers of both towns, as an alternate route paralleling I-77. North of Elkin, US 21 splits with I-77 for the last time and goes north to Sparta, passing the Blue Ridge Parkway after a major, curvy section. North of Sparta, at Twin Oaks, US 221 overlaps with US 21 before entering Virginia. US 21 travels 124.5 miles (200.4 km) through the western Piedmont of North Carolina, either combined with I-77 or as a two-lane rural road; from the South Carolina state line to Elkin, travelers can easily skip a majority of US 21 via I-77.
After a few miles crossing the state line, US 21 reaches the town of Independence, where it splits with US 221 and continues north. The route goes through the Mount Rogers National Recreation Area before entering the city of Wytheville. After a short concurrency with US 11 in downtown Wytheville, it goes north and ends at the intersection of I-81/US 52. US 21 travels 35 miles (56 km) through western Virginia, mostly as a two-lane rural mountain road.
US 21 in the pre-Interstate era was a north–south highway connecting the area around Lake Erie and the coastal South. One of the few true north–south routes to cross the middle Appalachian Mountains, it became an important corridor for motor traffic between northeastern Ohio, western Pennsylvania, (with US 19) and western New York with central North Carolina, central and southeastern South Carolina, and (by connecting with other highways) coastal Georgia and most of Florida. Many referred to the stretch of US 21 from the Great Lakes Region to Florida as "The Lakes-to-Florida Highway".
US 21 originally (in 1926) connected Cleveland, Ohio, and Yemassee, South Carolina. In 1935 it was extended to Beaufort, South Carolina, and again in 1953 to its current southern terminus at the Atlantic Coast at Hunting Island State Park, between the city of Beaufort and Fripp Island.[3][unreliable source]
In the Interstate Highway era, much of US 21 became an obvious corridor for a long-distance expressway. The West Virginia Turnpike between Charleston, West Virginia, and Princeton, West Virginia, was the first segment of a planned series of toll highways along or near US 21 from Cleveland to Charlotte, North Carolina. All the other toll highways were shelved in favor of freeways built with Interstate funding; these freeways and the West Virginia Turnpike became I-77, which completely supplanted old US 21 as a long-distance through route. I-77 was later extended to Columbia, South Carolina, also within a few miles of US 21.
Between Cleveland and Charleston, all but a relatively short segment of US 21 was completely deleted in favor of I-77, the relics being as follows:
Between Charleston and its current northern terminus at Wytheville, Virginia, almost all of US 21 ran concurrently with either US 60, US 19, or US 52, which remained as US 21 was deleted. The short segment of US 21 in southern West Virginia not coinciding with another U.S. Highway became an extension of West Virginia Route 16.
In North Carolina, US 21 originally entered the state along today's NC 51 into Pineville, then followed Old Pineville Road into Charlotte. In the mid-1930s, US 21 moved over to South Boulevard from Old Pineville Road. In 1969, US 21 was rerouted following today's I-77 alignment, the old route was replaced by an extension of US 521. From 1975–1987, US 21 moved north in segments onto I-77 to its current alignment ending at exit 16A (Sunset Road). Further north, US 21 originally followed Old Statesville Road, replaced in 1956 by NC 115. In 1966, US 21 was bypassed around Jonesville and Elkin, replaced with US 21 Bus.[4][unreliable source]
US 21 in Beaufort, South Carolina, was rerouted around the city over former SC 280 as well as a portion of SC 802. The new routing went into effect on February 26, 2012.[5]
State | County | Location | mi[6][7][8] | km | Exit | Destinations | Notes | |
---|---|---|---|---|---|---|---|---|
South Carolina | Beaufort | Hunting Island State Park | 0.00 | 0.00 | Sea Island Parkway / Campground Road | Southern terminus; road continues as Sea Island Parkway | ||
Lady's Island | 14.50 | 23.34 | US 21 Bus. north (Sea Island Parkway west) / SC 802 east (Sams Point Road) | Southern terminus of US 21 Bus.; western terminus of SC 802 | ||||
Port Royal | 17.35 | 27.92 | SC 281 north (Ribaut Road north) | Southern terminus of SC 281 | ||||
19.87 | 31.98 | Parris Island M.C.R.D. | Interchange | |||||
21.10 | 33.96 | SC 128 west (Savannah Highway) – Bluffton, Hardeeville, Hilton Head Island | Eastern terminus of SC 128 | |||||
Beaufort | 24.24 | 39.01 | SC 170 (Robert Smalls Parkway) – Beaufort | |||||
Burton | 25.44 | 40.94 | US 21 Bus. south – Beaufort | Northern terminus of US 21 Bus. | ||||
26.86 | 43.23 | SC 116 west – Laurel Bay | Eastern terminus of SC 116 | |||||
Gardens Corner | 37.40 | 60.19 | US 17 north – Charleston | Interchange; eastern end of US 17 concurrency | ||||
Pocotaligo | 44.00 | 70.81 | US 17 Alt. begins / US 17 south to I-95 – Ridgeland, Savannah | Western end of US 17 concurrency; southern end of US 17 Alt. concurrency; southern terminus of US 17 Alt. | ||||
Hampton | Yemassee | 47.77 | 76.88 | SC 68 west (Connely Street) / Flowers Street south (US 17 Conn. south) to I-95 – Hampton, Allendale | Eastern terminus of SC 68; northern terminus of US 17 Conn. | |||
Colleton | | 49.39 | 79.49 | US 17 Alt. north (Hendersonville Highway) – Walterboro | Northern end of US 17 Alt. concurrency | |||
| 52.04 | 83.75 | I-95 – Florence, Savannah | I-95 exit 42 | ||||
| 62.00 | 99.78 | SC 63 (Sniders Highway) – Varnville, Walterboro | |||||
Bells Crossroads | 68.41 | 110.10 | SC 64 (Bells Highway) – Ehrhardt, Walterboro | |||||
Smoaks | 77.10 | 124.08 | SC 217 (Lodge Highway) – Lodge | |||||
Bamberg | Whetstone Crossroads | 83.20 | 133.90 | SC 61 (Edisto River Road) – Bamberg | ||||
Orangeburg | Branchville | 88.65 | 142.67 | US 78 west (Edward Street) – Bamberg | Southern end of US 78 concurrency | |||
88.85 | 142.99 | US 78 east (Dorange Road) – Charleston | Northern end of US 78 concurrency | |||||
89.26 | 143.65 | SC 210 north – Bowman | Southern terminus of SC 210 | |||||
Orangeburg | 104.16 | 167.63 | US 21 Bus. north (Rowesville Road) / Stonewall Jackson Boulevard (US 601 Truck north / SC 4 west) | Southern end of US 601 Truck concurrency; southern terminus of US 21 Bus.; eastern terminus of SC 4 | ||||
104.23 | 167.74 | US 178 east (Charleston Highway east) / US 178 Bus. west (Charleston Highway west) – Charleston | Southern end of US 178 concurrency; eastern terminus of US 178 Bus. | |||||
105.55 | 169.87 | US 301 (Five Chop Road) – Santee, Bamberg | ||||||
105.65 | 170.03 | SC 33 (Russel Street) – Cameron | ||||||
107.50 | 173.00 | US 601 (Magnolia Street) / US 601 Truck ends – St. Matthews, Bamberg | Northern end of US 601 Truck concurrency; northern terminus of US 601 Truck | |||||
108.59 | 174.76 | US 178 west (Chestnut Street) / Columbia Road south (US 21 Conn. south) – North | Northern end of US 178 concurrency; northern terminus of US 21 Conn.; US 21 turns right off of Chestnut Street and onto Columbia Road. | |||||
Calhoun | | 120.48 | 193.89 | SC 172 – North | ||||
| 120.58 | 194.05 | SC 6 east to I-26 | Southern end of SC 6 concurrency | ||||
| 122.15 | 196.58 | SC 6 north (Center Hill Road) – Swansea | Northern end of SC 6 concurrency | ||||
Lexington | | 127.48 | 205.16 | I-26 – Columbia, Charleston | I-26 exit 129 | |||
Calhoun | Sandy Run | 130.23 | 209.58 | US 176 east (Old State Road) – St. Matthews | Southern end of US 176 concurrency | |||
Lexington | | 137.13 | 220.69 | I-26 – Columbia, Charleston | I-26 exit 119 | |||
| 138.98 | 223.67 | US 321 south – Gaston, Swansea | Southern end of US 321 concurrency | ||||
Cayce | 141.48 | 227.69 | I-77 north – Charlotte | I-77 exit 1 | ||||
141.87 | 228.32 | I-26 – Charleston, Spartanburg | I-26 exit 115 | |||||
142.97 | 230.09 | SC 2 north (Frink Road) | Southern terminus of SC 2 | |||||
West Columbia | 144.45 | 232.47 | SC 302 south (Airport Boulevard) – Aiken, Columbia Airport | Northern terminus of SC 302 | ||||
Cayce | 146.23 | 235.33 | SC 2 (State Street) | |||||
Richland | Columbia | 147.22 | 236.93 | SC 48 Truck east (Blossom Street / US 21 Conn. east / US 76 Conn. east) to US 76 east / US 378 east | Western terminus of US 21 Conn., US 76 Conn., and SC 48 Truck; US 21, US 176, and US 321 turn left off of Blossom Street and onto Huger Street. | |||
147.86 | 237.96 | US 1 / US 378 (Gervais Street) – South Carolina State Museum, Confederate Relic Room, EdVenture, Columbia SC Visitors Center, Convention Center, Colonial Life Arena | ||||||
148.16 | 238.44 | SC 12 east (Hampton Street) – Fort Jackson | One-way couplet | |||||
148.26 | 238.60 | SC 12 west (Taylor Street) – Lexington | ||||||
148.76 | 239.41 | I-126 west / US 76 west to I-20 – Greenville, Spartanburg | Southern end of I-126/US 76 concurrency; Rep. T. Moffatt Burriss Sr. Interchange | |||||
149.08 | 239.92 | I-126 ends | Northern end of I-126 concurrency | |||||
149.38 | 240.40 | SC 48 east (Assembly Street) – Columbia Museum of Art | Western terminus of SC 48 | |||||
149.46 | 240.53 | US 76 east (Elmwood Avenue) | Northern end of US 76 concurrency | |||||
149.97 | 241.35 | US 176 west (River Drive) | Northern end of US 176 concurrency | |||||
150.66 | 242.46 | SC 16 (Sunset Drive) | ||||||
151.23 | 243.38 | SC 215 north (Monticello Road) | Southern terminus of SC 215 | |||||
152.22 | 244.97 | US 321 north (Fairfield Street) – Winnsboro | Northern end of US 321 concurrency | |||||
154.76 | 249.06 | I-20 – Florence, Augusta | I-20 exit 71 | |||||
Blythewood | 162.17 | 260.99 | I-77 – Columbia, Charlotte | I-77 exit 24 | ||||
163.46 | 263.06 | SC 555 (Farrow Road) – Columbia | ||||||
Fairfield | | 171.40 | 275.84 | Coleman Highway west (US 21 Conn. north) – Winnsboro | Southern terminus of US 21 Conn.; eastern terminus of Coleman Highway | |||
Ridgeway | 172.09 | 276.95 | SC 34 east (Palmer Street) – Lugoff, Camden | Southern end of SC 34 concurrency | ||||
172.31 | 277.31 | SC 34 west (Church Street) – Winnsboro Mills | Northern end of SC 34 concurrency | |||||
| 189.11 | 304.34 | SC 200 – Winnsboro | Southern end of SC 200 concurrency | ||||
Chester | Great Falls | 192.07 | 309.11 | SC 99 north (Chester Avenue) – Richburg | Southern terminus of SC 99 | |||
193.29 | 311.07 | SC 97 north – Chester | Southern end of SC 97 concurrency | |||||
193.43 | 311.30 | SC 97 south / SC 200 north – Lancaster | Northern end of SC 97 and SC 200 concurrencies | |||||
Fort Lawn | 200.93 | 323.37 | SC 9 (Chester Avenue) – Richburg, Lancaster | |||||
| 206.23 | 331.90 | SC 223 (Wylies Mill Road) – Richburg | |||||
York | | 213.55 | 343.68 | SC 5 south – Lancaster | Interchange; southern end of SC 5 concurrency; to Andrew Jackson State Park | |||
Lesslie | 215.67 | 347.09 | Lesslie | Interchange via connector road | ||||
Rock Hill | 217.26 | 349.65 | Lesslie, Red River | Interchange | ||||
218.02 | 350.87 | I-77 – Columbia, Charlotte | I-77 exit 77 | |||||
218.72 | 352.00 | SC 5 / SC 121 (Main Street) | Access to Piedmont Medical Center; northern end of SC 5 concurrency; southern end of SC 121 concurrency | |||||
220.20 | 354.38 | SC 122 (Dave Lyle Boulevard) to I-77 | Interchange | |||||
222.36 | 357.85 | SC 322 west (Cherry Road west) / SC 121 ends | Northern end of SC 121 concurrency; northern terminus of SC 121; eastern terminus of SC 322 | |||||
222.80 | 358.56 | I-77 – Columbia, Charlotte | I-77 exit 82 | |||||
223.00 | 358.88 | SC 161 north (Celanese Road) to I-77 north – Charlotte, York | Southern terminus of SC 161 | |||||
Fort Mill | 224.37 | 361.09 | US 21 Bus. north (Spratt Street) – Fort Mill | Southern terminus of US 21 Bus. | ||||
226.42 | 364.39 | SC 160 – Tega Cay | ||||||
229.20 | 368.86 | SC 460 (Springfield Parkway) – Tega Cay, Fort Mill | ||||||
230.35 | 370.71 | US 21 Bus. south (Old Nation Road) | Northern terminus of US 21 Bus. | |||||
231.14 | 371.98 | SC 51 north (Pineville–Rock Hill Road) – Pineville | Southern terminus of SC 51 (northern segment) | |||||
231.89 | 373.19 | I-77 south – Columbia | Southern end of I-77 concurrency; I-77 exit 90 | |||||
232.52 0.00 | 374.20 0.00 | South Carolina–North Carolina line | ||||||
North Carolina | Mecklenburg | Charlotte | 0.9 | 1.4 | 1A | Westinghouse Boulevard | Exit numbers follow I-77 | |
1.8 | 2.9 | 1B | I-485 – Huntersville, Pineville | Formerly exit 2 (southbound) before August 2010; I-485 exit 67 | ||||
2.8 | 4.5 | 3 | Arrowood Road | Formerly exit 2 (northbound) before August 2010 | ||||
3.7 | 6.0 | 4 | Nations Ford Road | |||||
4.8 | 7.7 | 5 | Tyvola Road | Single-point urban interchange | ||||
6.0 | 9.7 | 6A | Woodlawn Road south (Charlotte Route 4 east) – Queens University | To Pfeiffer University | ||||
6.2 | 10.0 | 6B | To NC 49 (S. Tryon Street) / Billy Graham Parkway (Charlotte Route 4 west) | To Billy Graham Library and Charlotte Douglas International Airport; southbound signed as NC 49 south (S. Tryon St. south) only | ||||
7.3 | 11.7 | 7 | To NC 49 / Clanton Road | |||||
8.3 | 13.4 | 8 | To NC 160 / Remount Road | Northbound exit and southbound entrance | ||||
9.0 | 14.5 | 9A | NC 160 (West Boulevard) | Southbound exit and northbound entrance; access from collector-distributor lanes | ||||
9.4 | 15.1 | 9B | I-277 north / US 74 east (John Belk Freeway) | Access from collector-distributor lanes; I-277 exits 1B-C | ||||
9.5 | 15.3 | 9C | US 74 west (Wilkinson Boulevard) to US 29 / NC 27 | US 29 and NC 27 signed northbound only; access from collector-distributor lanes; US 74 exits 1B-C | ||||
9.9 | 15.9 | 10A | US 29 / NC 27 (Morehead Street) | Southbound exit and northbound entrance | ||||
10.4 | 16.7 | 10 | Trade Street / Fifth Street | Signed southbound as exits 10B (Trade Street east) and 10C (Fifth Street/Trade Street west) | ||||
11.0 | 17.7 | 11A | I-277 south / NC 16 south (Brookshire Freeway east) – Downtown Charlotte | I-277 exits 5A-B | ||||
11.2 | 18.0 | 11B | NC 16 north (Brookshire Freeway west) | Left exit northbound; NC 16 exits 5A-B | ||||
— | I-77 north (Express lanes) | Southern terminus of HOV3+/toll lanes | ||||||
— | I-277 south | Express lanes only, southbound exit and northbound entrance | ||||||
12.4 | 20.0 | 12 | Lasalle Street / Atando Avenue | |||||
13.3 | 21.4 | 13 | I-85 – Greensboro, Spartanburg | Signed as exits 13A (north) and 13B (south); hybrid interchange; I-85 exit 38 | ||||
— | I-85 north | Express lanes only; northbound exit and southbound entrance | ||||||
15.8 | 25.4 | I-77 north – Statesville | Northern end of I-77 concurrency; I-77 exit 16 | |||||
16.3 | 26.2 | NC 115 north (Old Statesville Road) | Southern terminus of NC 115 | |||||
18.9 | 30.4 | NC 24 (W.T. Harris Boulevard) | To Northlake Mall | |||||
Huntersville | Alexandriana Road to I-485 | |||||||
25.7 | 41.4 | NC 73 (Sam Furr Road) – Concord | ||||||
Cornelius | 28.8 | 46.3 | I-77 south – Charlotte | Southern end of I-77 concurrency; I-77 exit 28 | ||||
Davidson | 30.2 | 48.6 | 30 | Griffith Street – Davidson | Exit numbers follow I-77 | |||
Lake Norman | Lake Norman Causeway | |||||||
Iredell | Mooresville | 32.1 | 51.7 | 31 | Langtree Road | |||
33.7 | 54.2 | I-77 north – Statesville | Northern end of I-77 concurrency; I-77 exit 33 | |||||
36.4 | 58.6 | NC 150 (Plaza Drive) | Interchange | |||||
39.1 | 62.9 | NC 115 south (Statesville Highway) | Southern end of NC 115 concurrency | |||||
| 43.3 | 69.7 | I-77 – Charlotte, Statesville | I-77 exit 42 | ||||
Statesville | 51.2 | 82.4 | US 70 (Garner Bagnal Boulevard) – Conover, Salisbury | |||||
51.9 | 83.5 | US 64 west (Front Street) / NC 115 north (Center Street) | Northern end of NC 115 concurrency; southern end of US 64 concurrency | |||||
52.3 | 84.2 | NC 90 west (Water Street) | Eastern terminus of NC 90 | |||||
53.2 | 85.6 | US 64 east (Davie Avenue) – Mocksville | Northern end of US 64 concurrency | |||||
54.1 | 87.1 | I-40 – Hickory, Winston-Salem | I-40 exit 151 | |||||
| 57.2 | 92.1 | I-77 – Statesville, Elkin | I-77 exit 54 | ||||
Harmony | 66.9 | 107.7 | NC 901 (Memorial Highway) – Union Grove | |||||
Yadkin | Brooks Crossroads | 79.2 | 127.5 | US 421 – Wilkesboro, Yadkinville, Winston-Salem | ||||
| 85.4 | 137.4 | I-77 south / US 21 Bus. north – Statesville, Jonesville | Southern end of I-77 concurrency; I-77 exit 79; southern terminus of US 21 Bus. | ||||
Jonesville | 88.5 | 142.4 | 82 | NC 67 – Jonesville, Boonville, Elkin | Exit number follows I-77 | |||
Yadkin River | Sgt. Gregory Keith Martin Memorial Bridges | |||||||
Surry | Elkin | 90.3 | 145.3 | I-77 north – Wytheville | Northern end of I-77 concurrency; southbound exit and northbound entrance; I-77 exit 83 | |||
91.3 | 146.9 | NC 268 Byp. to I-77 north – Elkin | Interchange; to Elkin Municipal Airport; I-77 exit 85 | |||||
92.8 | 149.3 | US 21 Bus. south – Elkin | Northern terminus of US 21 Bus. | |||||
Wilkes |
No major junctions | |||||||
Alleghany | | 111.2 | 179.0 | Blue Ridge Parkway | Interchange via connector roads | |||
Sparta | 118.2 | 190.2 | NC 18 (Whitehead Street) – Laurel Springs | |||||
Twin Oaks | 121.1 | 194.9 | US 221 south – Jefferson | Southern end of US 221 concurrency | ||||
124.3 0.00 | 200.0 0.00 | North Carolina–Virginia line | ||||||
Virginia | Grayson | Independence | 3.86 | 6.21 | US 221 north / US 58 (Main Street) – Mouth of Wilson, Galax | Northern end of US 221 concurrency | ||
Elk Creek | 14.77 | 23.77 | SR 658 (Comers Rock Road) – Comers Rock | |||||
| 15.67 | 25.22 | SR 805 (Spring Valley Road) to SR 94 – Fries | |||||
Wythe | Speedwell | 21.26 | 34.21 | SR 619 (Saint Peters Road) / SR 749 (Cedar Springs Road) – Cedar Springs, Rural Retreat | ||||
| 26.03 | 41.89 | SR 690 (Crockett Road, Cripple Creek Road) – Crockett, Cripple Creek | |||||
| 31.13 | 50.10 | SR 696 (Barrett Mill Road) – Big Survey Wildlife Management Area | |||||
Wytheville | 33.63 | 54.12 | US 11 south (Lee Highway) | Southern end of US 11 concurrency | ||||
33.94 | 54.62 | US 11 north (Main Street) | Northern end of US 11 concurrency | |||||
34.99 | 56.31 | I-81 / US 52 to I-77 – Bristol, Roanoke | Northern terminus; I-81 exit 70; road continues west as US 52 (4th Street north) | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
There are currently four business loops, four connectors, and one truck route along its route.
Auxiliary routes of US 21:
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.