High-elevation railway line in China From Wikipedia, the free encyclopedia

Sichuan–Tibet railway

The Sichuan–Tibet railway, Sichuan–Xizang railway or Chuanzang railway (simplified Chinese: 川藏铁路; traditional Chinese: 川藏鐵路; pinyin: Chuānzàng Tiělù) is a partially opened high-elevation and the National first-class trunk railway in China that will connect Chengdu, the capital of Sichuan province, and Lhasa, the capital of Tibet, when fully completed.[8] The line will be 1,629 km (1,012 mi) long,[4][5] and significantly cut travel time from Chengdu to Lhasa from 48 to 13 hours.[9]

More information Route map ...
Route map

(Up arrow toward Chengdu)
Chengdu West
(Right arrow toward Chengdu South)
Shuangliu North
Wenjiang
Yangma
Chongzhou
Longxing
Dayi
Wangsizhen
Qionglai
Xilai
Pujiang
(Up arrow Chengdu-Zigong HSR)
Tianfu
(Right arrow Chengdu-Zigong HSR)
Shou'an
(Up arrow Chengdu-Kunming railway)
(Down arrow Chengdu-Kunming railway)
Chaoyanghu
Mingshan
planned to Emeishan
Ya'an
Tianquan
Luding
Kangding
Xinduqiao
Yajiang
Litang
Maoyaba
Batang
Gongjo
Qamdo
Yunnan-Tibet railway
Bamda Airport
Gyari
Puzong
Bomê
Tongmai
Lunang
Nyingchi
Zhongshaba
Tingri
Xuega
Mainling
Zharao
Khangsar
Nailung
Orong
Benzhong
Xiajue
Jiage
Remi
Tunggar
Nang County
Chongkang
Redang
Linda
Gyaca
Zam
Bayü
Oiga
Bairain
Sangri
Mingze
Zêtang
Jiacun
Jinlu
Chaqi
Zhanang
Gazha
Jiedexiu
Gonggar
Changgo
Xêrong
Baidui
Lhasa South
Lhasa
Close
Sichuan–Tibet railway
Overview
Native name川藏铁路 / 川藏鐵路 (Chinese)
StatusUnder construction (2014-2030)
Locale
Termini
Service
TypeHigher-speed rail
History
Planned opening2030 (expected for full line)[1]
Opened28 December 2018[2] (Chengdu–Ya'an segment)
25 June 2021[3] (Nyingchi–Lhasa segment)
Technical
Line length1,629 km (1,012 mi)[4][5]
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationYes[6][7]
Operating speed160km/h

History

The first segment to enter operation was from Chengdu–Ya'an on 28 December 2018.[2] The second segment to enter operation, from Nyingchi–Lhasa, opened on 25 June 2021.[10][11][12] The final Ya'an–Nyingchi segment is expected to complete in 2030.[1][9] It is the first electrified railway in the Tibet Autonomous Region, and the first higher-speed rail on the plateau.[13] China high-speed railway service runs China Railway CR200J Fuxing series trainset on this line.[13][14]

Construction

Summarize
Perspective

According to Chinese media[who?], the Sichuan–Tibet railway is extremely difficult to construct. The railway has a elevation difference of 3,000 m (9,843 ft). The starting point in the Sichuan basin is at only 300 m (984 ft) altitude above sea level, while the terminus is located 3,000 m (9,843 ft) above sea level on the Tibetan Plateau. 90% of the railway runs at an altitude of more than 3,000 m (9,843 ft).

The Nyingchi segment alone runs through the Yarlung Tsangpo river valley 16 times, and required the construction of 47 tunnels and 121 bridges.[13] One of the most challenging segments was the Milin tunnel with 10 km (6.2 mi) length. Milin tunnel lies down to 1,200 m (3,937 ft) below the top of a mountain range, and has an average altitude of 3,100 m (10,171 ft) asl., due to being situated on the Tibetan Plateau.[9]

A 1,011 km (628 mi) long Ya'an–Nyingchi segment will have 72 tunnels with a total length of 851 km (529 mi) with multiple tunnels with a length of more than 30-kilometre (19 mi), of which the longest tunnel is the 42.5-kilometre-long (26.4 mi) Yigong Tunnel.[15][16]

The railway is tunneled through areas with high-temperature earth-crust.[17]

The total cost of the entire project is given with around 319.8 billion RMB.[18]

Segments

Summarize
Perspective

Chengdu–Ya'an segment

Thumb
Sichuan-Tibet Railway Extension from Ya'an railway station
Thumb
Ya'an railway station waiting lounge

The Chengdu to Ya'an segment is 140 km (87 mi) long and has a design speed of 200 km/h (124 mph). This section opened on 28 December 2018.[citation needed]

Ya'an–Nyingchi segment

The Ya'an to Nyingchi segment is 1,011 km (628 mi) and has a design speed of 120–200 km/h (75–124 mph).[9] It traverses a seismically active region with difficult terrain and a fragile ecology, and is the most difficult part of the railway to construct.[19] The segment's construction started on 8 November 2020[9] with construction expected to last until 2030.[1][9]

Nyingchi–Lhasa segment

The Nyingchi to Lhasa segment has completed construction and has begun operations. The 435.48-kilometre-long (270.59 mi)[12][20] segment has a design speed of 160 kilometres per hour (99 mph). Nyingchi segment includes 47 tunnels, 121 bridges and a 525 m (1,722 ft) long Zangmu Railway Bridge.[21]

Construction began on 19 December 2014.[4] Tracklaying completed in December 2020.[22] This section opened on 25 June 2021.[11][12]

On 25 June 2021, the segment began operations, with the first train leaving Lhasa for Nyingchi at 10.30 am. The railway reduces the travel time from Lhasa to Nyingchi from 5 hours to 3.5 hours and Shannan to Nyingchi from 6 hours to more than 2 hours compared to roads.[23] Aside from passenger service, it’s also capable of transporting 10 million tonnes of freight annually.[24]

Rolling stock

160 km/h (99 mph) services use the China Railway CR200J trainsets.[14] The CR200J Plateau variant will serve the railway, a type of bi-mode locomotive specifically designed for plateau operations.[25] 31 sets of train in a 12-car configuration are in service. A combination of diffusion and distributed oxygen systems are installed to help alleviate altitude sickness for passengers on the trip.[13]

Benefits

The railway will greatly reduce travel times and increase connectivity between Lhasa and the eastern cities of the country. Prior to the Sichuan-Tibet railway, one must travel via Golmud and Lanzhou to make this journey by rail. The line is a serious engineering challenge, and serves the purpose of integrating local communities, as well as the interior and coastal regions of China. The railway is also expected to have major positive impact on tourism in the western parts of the country.[26]