Qianwan station (Chinese: 前湾站; pinyin: Qiánwān Zhàn) is an interchange station for Line 5 and Line 9 of the Shenzhen Metro. It opened on 28 September 2019 with Line 5,[1] whilst Line 9 opened on 8 December 2019.[2][3]
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Nanshan District, Shenzhen, Guangdong China | |||||||||||||||
Operated by | SZMC (Shenzhen Metro Group) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 28 September 2019 (Line 5) 8 December 2019 (Line 9) | |||||||||||||||
Services | ||||||||||||||||
|
Station layout
G | - | Exit |
B1F Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
B2F Platforms |
Platform | ← Line 9 termination platform |
Island platform, Doors open on the left | ||
Platform | → Line 9 towards Wenjin (Menghai) → | |
B3F Platforms |
Platform | ← Line 5 towards Chiwan (Qianwan Park) |
Island platform, doors will open on the left | ||
Platform | → Line 5 towards Huangbeiling (Guiwan) → |
Remove ads
Exits
Exit | Destination |
---|---|
Exit B | Tinghai Boulevard, Guiwan Park |
Exit D | Qiajhai 1st Road, Qianhai Legal Tower, Qianhai Kerry, Haiti Park, Hengchang Technology Building |
References
External links
Wikiwand in your browser!
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.
Remove ads