Loading AI tools
Commuter rail service in Greece From Wikipedia, the free encyclopedia
The Proastiakos (Greek: Προαστιακός; "suburban") is Greece's Commuter rail service, run by Hellenic Train, on rail infrastructure owned by the Hellenic Railways Organisation (OSE) (lines) and GAIAOSE (buildings and Trains). These services connect a participating city's central railway station to important locations such as a city's port or airport, as well as its suburbs and occasionally nearby towns and cities.
This article needs additional citations for verification. (July 2015) |
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Locale | Athens, Thessaloniki, Patras | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current operator(s) | Hellenic Train | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 10.1 million (2020) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
As of September 2020, there are three Proastiakos networks serving the country's three largest cities: Athens, Thessaloniki, and Patras, providing them with commuter rail links towards their suburbs and also with regional services to other cities and towns. In 2016, the three systems carried 10.1 million passengers.[1]
As of 8 January 2017, the lines between the central stations of Athens and Halkida have been electrified, allowing EMU train service. The lines have been changed, making Athens's central station the main layover station. Those lines are Athens – ATH, Athens – Kiato, Athens – Chalcis.
In Thessaloniki, there are two Proastiakos services. The first connects the city's New Railway Station with the cities of Katerini and Larissa, and the second links the city with Edessa.
In July 2010, a new commuter rail service was launched in Patras, connecting the city with Rio.
Proastiakos of Athens consists of 6 routes:[2]
The concept of regular and frequent suburban and commuter rail services was introduced in Greece in the 1990s. It became possible due to extra capacity becoming available through improvements to the existing lines and the construction of new ones. In the past, suburban services ran on very infrequent timetables and were not very popular.
The construction of a new rail line between central Athens, its eastern suburbs, and the new Athens International Airport was decided in 1992–1993. During the construction of Attiki Odos motorway in the late 1990s, space was left between the main carriageways for the railway line. After two years of construction, the line to Athens International Airport opened in 2004. The first suburban services between Athens and the Airport were inaugurated using Stadler GTW and Siemens Desiro DMU trains.
On 27 September 2005, the new standard gauge rail line reached Corinth, terminating at a new station, located at Examilia. This line today is served by "Proastiakos" suburban services, while initially "Proastiakos" trains stopped at Nea Peramos, Megara, Kinetta, and Agioi Theodoroi. On 18 July 2006, three new stations were added: Ano Liosia, Aspropyrgos, and Magoula. On 4 June 2007, the line was extended from Athens Central Station to the port of Piraeus with 3 intermediate stations at Lefka, Rentis, and Rouf. This extension linked the airport with the port of Piraeus. On 9 July 2007, Proastiakos services reached the new station at Kiato.
TrainOSE also runs "Proastiakos" commuter rail services between the cities of Thessaloniki and Larissa, on the modernised and electrified main line. The service initially operated from Thessaloniki to Litochoro in 2007 and was extended to Larissa in 2008.
In 2009 the brand name "Proastiakos" was also used for a short-lived regional service of four trains in each direction per day, connecting the cities of Xanthi, Komotini, and Alexandroupolis in the region of Western Thrace.
In 2010, TrainOSE created the Proastiakos Patras service which runs on the old Athens-Patras line from Agios Andreas to Agios Vassileos.
The Athens Suburban Railway consists of five routes: Piraeus–Airport via Athens, Piraeus–Kiato via Athens, Athens–Chalcis via Oinoi, Ano Liosia–Airport via Koropi, and Aigio–Athens/Airport via Kiato.[3] Trains run from 4:30 am to midnight daily, and there are 53 stations in total.[3]
On 18 January 2012, services were "temporarily" suspended on routes from Piraeus - Ano Liossia.[4] According to a TrainOSE spokesperson, the interruption is due to technical problems; however no information on the progress of any work was given,[4] services were rerouted via SKA.
The following table lists the routes and the stations for the Athens Suburban Railway since 15 May 2022:[3]
Prefix | Route number | Route | Stations | Length | Time | Ref. |
---|---|---|---|---|---|---|
12xx | A1 | Piraeus–Athens–Athens Airport | 19 | 48.23 km | 1:03 | [5][6][7]: 2, 23 |
13xx, 23xx | A4 | Piraeus–Athens–Kiato | 20 | 120.70 km | 1:40 | [8][7]: 2, 8, 11 |
15xx, 25xx, 35xx | A3 | Athens–Chalcis | 17 | 82.80 km | 1:18 | [9][7]: 2 |
22xx | A2 | Ano Liosia–Paiania–Kantza–Athens Airport | 12 | 33.18 km | 0:34 | [5][6][7]: 8, 23 |
42xx | A2 | Ano Liosia–Paiania–Kantza | 10 | 18.60 km | 0:23 | |
3xx | Kiato–Aigio | 9 | 70.38 km | 0:52 | [7]: 9 |
The suburban railway connects with the other urban railways of Athens at the following stations:
The Suburban railway in Thessaloniki consists of three routes: one from Thessaloniki to Larissa, one from Thessaloniki to Florina.[citation needed] and one to Serres. Services run from approximately 5:00 am to midnight daily[10][11] Thessaloniki Suburban Railway consists of three lines:
Trains run from approximately 6:00 am to 22:00 pm daily on a fairly irregular basis, roughly once an hour. Both lines, however, somewhat complement each other between Thessaloniki and Platy.[12][13] On 17 July 2014 services were cut back from eight to six services a day from Thessaloniki To Edessa.[13]
Route | Opening | Route | Length | Electric | Top Speed | Stations |
---|---|---|---|---|---|---|
7 September 2007 (Litochoro–Thessaloniki) 7 September 2008 (Larissa–Litochoro) |
Thessaloniki–Larissa | 165.2 km (102.7 mi) | Yes | 160 km/h (99 mph) | 12 | |
25 January 2008 (Thessaloniki–Edessa) 10 August 2013 (Edessa–Florina) |
Thessaloniki–Florina | 111.7 km (69.4 mi) | No | 120 km/h (75 mph) | 17 | |
Π3 | 3 February 2020 (Thessaloniki– Serres) | Thessaloniki–Serres | 158.9 km (98.7 mi) | No | 20 |
Services towards Larissa also connect to the following long-distance and regional rail services:
Services towards Serres also connect to the following long-distance and regional rail services:
Suburban railway of Patras consists of two routes. The first route from Agios Andreas station to the eastern suburb of Agios Vasileios began service on July 9, 2010. The route sees high passenger numbers as it serves the University of Patras and densely populated neighbourhoods and suburbs that are poorly served by other means of transport. For that reason, a bus shuttle service runs from Kastellokampos to the General University Hospital of Patras and the University of Patras campus.[14] Trains run hourly from 6:23 in the morning until 23:23 in the evening, on both directions, every day.[14] It serves 8 stations:
Due to upgrade works on the Athens - Patras line, the section between Agios Vasileios and Rio has been closed, so trains now terminate at Rio station. However, a bus replacement service from Kastellokampos serves both Aktaion and Agios Vasileios.
The following table lists the routes and the stations for Patras Suburban services are:
Route | First section opened | Latest section opened | Latest station opened | Route | Length (km, mi) | Stations |
---|---|---|---|---|---|---|
P1 | 9 July 2010 | Kato Achaia – Agios Andreas | 12.5 km (7.8 mi.) | 10 | ||
Route | First section opened | Latest section opened | Latest station opened | Route | Length (km, mi) | Stations |
P2 | 4 July 2020 | Agios Andreas – Rio | 7 |
On February 29, 2020, passenger services began on the second route, extending from Agios Andreas all the way to Kato Achaia. The extension runs on part of the old single meter-gauge Patras-Pyrgos line.
In the early phase of operation, trains run from Kato Achaia to Patras Central Station. They will be departing from Patras Central Station every 2 hours from 6:37 to 14:37 and then from Kato Achaia Station every 2 hours from 7:41 to 15:41.[15]
For the first three days of operation (29/02-02/03) the early morning services of 6:37 and 7:41 will not be run, although a back and forth journey at 16:37 to Kato Achaia and at 17:41 to Patras Central Station is going to be run.[15] This special schedule is organised in order to help visitors move around the city and its suburbs during the Patras Carnival going on that weekend.
Although regular passenger service will not see trains running in the evening, it is expected that from May onwards, when the tourist and summer season begins, trains will run hourly back and forth in order to accommodate the increased passenger flows towards the popular summer spots in Western Achaia.
The extension is 22 km long and has 11 stops. These are:
(*)A bus shuttle service will run from Tsoukaleika to the Patras Industrial Area, serving people who work there.
The total journey time from end to end is around 30 minutes with a top speed of 75 km/h, although the line has the capacity to run at 90 km/h.
Fares
The price for a standard ticket is €1,40(€1 reduced ticket). However, the fare is expected to change after March 2, as a new fare and zone policy[15] will take effect as follows:
Zone A: Rion - Agios Andreas
Zone B: Patras Central/Agios Andreas - Tsoukaleika
Zone C: Tsoukaleika - Kato Achaia
The bus shuttle/replacement services are included in the same ticket. This means passengers do not have to pay more than the standard (or reduced) fare of €1,40 (or €1) to use both the train and the bus.
Shortly after services started on the line, major changes were made. Bad line enclosure prohibited high speeds (less than 50km/h) on the section from Patras Central to Midilogli station, which in turn made connections between the two lines slow and inefficient. These two factors and poor advertising of the new service did not produce big passenger numbers. The outbreak of the COVID-19 pandemic and the subsequent lockdown imposed made things worse for that line, and shortly after, services were suspended indefinitely.
On July 9, 2020, Proastiakos Patras celebrated its 10th birthday. Five days earlier, on 4th July, after the lockdown was lifted, services on the South sector recommenced,[16] albeit on a shorter route. In order to maximize connection efficiency with the North sector (Rion-Agios Andreas), the route was altered to service the section between Agios Andreas and Kaminia. Alissos and Kato Achagia stations remain inactive to this day. However, works on safeguarding the line have been since going on, with new fences surrounding the line on key parts where it is otherwise problematic. When works are finished, it is expected that trains will reach speeds of 50km/h between Agios Andreas and Midilogli, the section on where such speeds were previously prohibited. This increase in speed should allow trains to reach the original terminus in Kato Achagia in less than 30 minutes, reinstating the original extension with a more than reliable, fast, and efficient connection with Patras and the North sector of the system.
The new service from Agios Andreas to Kaminia saw trains initially run hourly from 6:30 till 15:00. On October 10, the timetables changed and trains are since running hourly again, from 6:30 till 18:00.[17]
The fare system has changed, too, as the previously mentioned 3-zone fare policy was suspended indefinitely. Both lines are a single fare zone. The standard fare is €1,40, and the reduced fare is €1.00.[18]
Proastiakos uses rolling stock owned by GAIAOSE and maintained by Hellenic Train. Currently[when?] multiple units are used almost exclusively. Siemens Desiro 5-car electric multiple units (EMU) are used for Piraeus - Athens - Airport, Piraeus - Athens - Kiato, Athens – Chalkis and Thessaloniki - Larisa services, while Stadler GTW-2/6 and MAN-2000 diesel two-car multiple units (DMU-2) are used for the Patras-Rio and Patras-Kato Achagia services. As these DMUs have limited passenger carrying capacity, two or three DMUs are coupled together, when rolling stock availability allows it.
In late 2020 however, TrainOSE announced plans to purchase new rolling stock which will consist of double decker EMU's, preferably from the Italian market. [19]
Standard tickets (€1,40), valid on all urban buses and trains, are also valid on Proastiakos trains between Piraeus, SKA, Koropi and Magoula. Higher fares apply for travel to the Airport, between Magoula and Kiato; and between Thessaloniki and Larisa. A one-way ticket from Piraeus or central Athens to the Airport costs €8 (7.9 on line) and a return ticket €16 (15.5 on line).
Tickets must be validated on special ticket validation machines on the platform, before boarding the train. Return tickets must be re-validated before boarding a return train. There are no ticket validation machines on the trains.
Addition of new routes and stations to Proastiakos services depends on the progress of a number of OSE infrastructure projects in Attica. The most important projects are:
As of April 2011, the introduction of new and more frequent services is mainly hindered by limited line capacity between Rouf and SKA, and limited availability of diesel rolling stock for the non-electrified line.
A number of new stations and halts are under construction on this line and they shall be served by Proastiakos trains:
The extension to Lavrio will mostly follow the alignment of the old Athens to Lavrio metric gauge line, which closed to passengers in 1957 and to goods in 1962. Most of the old alignment is still intact, and several bridges, all station buildings as well as the tracks themselves on many locations, are still in situ, but will need to be replaced as they were designed for a single metric gauge line, while the new one will be standard gauge and double-track for most of its length. The new line will branch off the airport line just beyond Koropi station, where existing infrastructure for a possible extension is already in place.
New stations will be built at:
or near the same site as their predecessors, the buildings of which, most of them listed structures, will hopefully be preserved. The line will be electrified upon inauguration. [20]
Future services to Rafina will be on new lines, currently[when?] securing funds. The line to Rafina shall branch off after Pallini station and will partly run on the central reservation of the Hymittus Ring Road. The stations will be:
The existing line to Kiato has been extended to Aigio. The extension to Patras is under construction. A branch line to Loutraki is under construction.
These stations are on the existing mainline and are served by regional and mainline trains. They shall be served by Proastiakos suburban trains in the future, when electrification and adequate line capacity are available between Athens and SKA.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.