The DEx12 expressway (Romanian: Drumul expres DEx12), also known as the Pitești–Craiova Expressway (Romanian: Drumul expres Pitești–Craiova), is a partially built expressway in the south-western part of Romania, previously labelled as A12, when it was considered as a future motorway.[1] It will connect the cities of Pitești (branching off the A1 motorway), Slatina and Craiova (where it is planned to merge with the also planned A6 motorway), being 121 km long, with an estimated total cost of 1.66 billion euro.[2]
DEx12 expressway | ||||
---|---|---|---|---|
Drumul expres DX12 | ||||
Route information | ||||
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | ||||
Length | 71.6 km (44.5 mi) 49.5 km (30.8 mi) under construction 121.1 km (75.2 mi) planned | |||
Existed | 2022–present | |||
Major junctions | ||||
From | A 1 near Pitești | |||
To | A 6 near Craiova (planned) | |||
Location | ||||
Country | Romania | |||
Counties | Argeș, Olt, Dolj | |||
Highway system | ||||
|
As of 23 December 2023, the Balș - Colonești segment is in service, totaling 71.6 km (44.5 mi).
History
While planned as a motorway, the construction was tendered as a concession contract in March 2013,[3] that should have been awarded until December 2013.[2] It was also yet to be decided whether it would be built as a motorway or an expressway.[4]
In April 2017, it was suggested for the first time that this road will be an express road and not a motorway.[5] Despite receiving criticism in the media for this switch,[6] the road was tendered in November 2017.[7]
It is split into four sections. The contracts for the sections 1 and 2 were awarded in October 2018 to the Italian company Tirrena Scavi and the Romanian company Spedition UMB, respectively,[8] while those for the sections 3 and 4 had been signed in September 2020 with the Romanian joint-venture SA&PE Construct-Spedition UMB-Tehnostrade, without waiting for the decisions of the Bucharest Court of Appeal, the bids being challenged by several other participants.[9] Initially, the first tenders for the sections 3 and 4, launched during 2017,[10] had been canceled in August 2018 due to other participants challenging them,[11] being launched again during 2019.[12]
Works on section 3 were allowed to begin in May 2021,[13] but the contract for section 4 was terminated by the Bucharest Court of Appeal, who obliged the CNAIR to review the bids of the Chinese company China Railway, of the Turkish company Nurol, and of the Italian company Rizzani, all who challenged the winning bid for the said section.[14] In August 2021, the contract for section 4 was signed again with the same Romanian joint-venture with which the first contract was signed.[15]
Among companies asking for the expressway works to begin as soon as possible was the automaker Ford, who has a car plant in Craiova. Due to this, the expressway is sometimes referred to as the Autostrada Ford (Ford motorway).[16] In May 2021, the CNAIR submitted a request for the financing of a feasibility study and technical project for what could be a new connecting road between National Road 6 near the Ford Craiova plant and the DEx12 expressway.[17]
In March 2022, construction works for section 4 began.[18] However, on the 21st December, the contract for section 1, with Tirrena Scavi, was cancelled. The progress for the execution of the section currently sits at 58.26%.[19]
Openings timeline
Exit list
Exits and buildings (eastbound) | |||||
Balș (OT) – Colonești (OT) 71 km | |||||
km 0 | Craiova North | Under Construction | |||
km 1 | Craiova / Ghercești | DJ643F | Under Construction | ||
km 14 | Parking | Under Construction | |||
km 21 | Balș West | In Service | |||
km 27 | Balș East | DJ644 | In Service | ||
km 29 | Parking | In Service | |||
km 35 | Slatina West / Găneasa / | In Service | |||
km 41 | Parking | In Service | |||
km 50 | Slatina South | DJ546 | In Service | ||
km 55 | Parking | In Service | |||
km 57 | Slatina East | In Service | |||
km 67 | Parking | In Service | |||
km 74 | Negreni / Scornicești | In Service | |||
km 83 | Parking | In Service | |||
km 88 | Colonești | In Service | |||
km 99 | Parking | Under Construction | |||
km 108 | Podul Broșteni / Costești / Albota | Under Construction | |||
km 113 | Suseni | DJ659 | Under Construction | ||
km 115 | Parking | Under Construction | |||
km 121 | Pitești South | Under Construction | |||
See also
References
External links
Wikiwand in your browser!
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.