The station Nürnberg Nordost (translates from German as Nuremberg North East), colloquial form Nordostbahnhof, is a railway station in Nuremberg, Germany. It is a terminal station, providing a link to Gräfenberg, as the line to Gräfenberg has no connection to Nürnberg Hauptbahnhof, the city's main station.
Bf | |||||||||||
General information | |||||||||||
Location | Am Nordostbahnhof 5 90491 Nürnberg Bavaria Germany | ||||||||||
Elevation | 321 m (1,053 ft) | ||||||||||
Owned by | DB Netz | ||||||||||
Operated by | DB Station&Service | ||||||||||
Line(s) | |||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 3 | ||||||||||
Train operators | DB Regio Bayern | ||||||||||
Other information | |||||||||||
Station code | 4594 | ||||||||||
DS100 code | NNRO[1] | ||||||||||
IBNR | 8004469 | ||||||||||
Category | 6[2] | ||||||||||
Fare zone | VGN: 100 and 200[3] | ||||||||||
Website | www.bahnhof.de | ||||||||||
History | |||||||||||
Opened | 1 July 1899 | ||||||||||
Services | |||||||||||
| |||||||||||
|
The station has an interchange with the line of the Nuremberg U-Bahn.
History
The station was built by the Royal Bavarian State Railways and opened on 1 July 1899 together with the Nuremberg Ring Railway section Nuremberg East-Nuremberg North. In the beginning it was only used for freight traffic, for which various loading tracks and a goods shed were built. Passenger traffic began with the opening of the Gräfenbergbahn on 1 February 1908, from which between 1911 and 1912 occasional journeys via the Nuremberg Ring Railway and the Nuremberg–Cheb railway to Nürnberg Hauptbahnhof were extended. With the exception of these connections, the station has since been operated as an island station for passenger transport, which was connected to Hauptbahnhof by tram until 1996 and by underground since then. In the 1990s, the loading of goods was abandoned, the tracks were gradually dismantled and the station building demolished. The last reconstruction took place with the refurbishment of the Gräfenbergbahn between July and September 1999. In addition to the construction of a new island platform and direct access to the Nordostbahnhof underground station, the overpass over the Äußere Bayreuther Straße (B 2) was renewed and a 208 m long siding was built.
Gallery
- Location map of Nordostbahnhof
- View from track 3 direction Gräfenberg
- Track 1 with buffer
- View from track 3 towards Leipziger Platz
- Nuremberg Ring Railway bridge over Bayreuther Straße
References
Wikiwand in your browser!
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.