Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.

Quick Facts Overview, Status ...
Line 5
 5 
Train of Line 5 departing The Grand Canal station
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations40 (39 in service)
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)MTR Corporation (Hangzhou)[2]
Depot(s)Wuchang Depot
Guniangqiao Stabling Yard
Rolling stockPM126
Daily ridership535,000 (working days in the first half of 2021)[3]
History
Opened24 June 2019; 5 years ago (2019-06-24)[4]
Technical
Line length56.21 km (34.93 mi)[5]
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead 1,500 V DC
Operating speed80 km/h (50 mph)
Route map

1
East Nanhu
2
Jinxing
3
Lvting Road
 3   16 
4
Gexiang
5
Chuangjing Road
 19 
6
Liangmu Road
7
Cangqian Campus Hangzhou Normal University
8
Yongfu
Wuchang Depot
9
Wuchang
district
Yuhang
Xihu
10
Jiangcun
11
Zijingang Campus Zhejiang University
12
Sanba
 2 
Left arrow Chaoyang  Liangzhu Right arrow
district
Xihu
Gongshu
13
Pingshui Street
14
Hemu
 10 
15
The Grand Canal
16
East Gongchen Bridge
Line 3 interconnection
17
Shanxian
 3 
18
Xiwen Street
19
Dongxinyuan
20
Hangyang
21
Datieguan
 1 
22
Baoshan Bridge
23
North Jianguo Road
 2 
Left arrow Liangzhu  Chaoyang Right arrow
24
Wan'an Bridge
Hangzhou railway station China Railway High-speed HZHMoyetang  7 
25
Chengzhan
 1 
26
Jiangcheng Road
 7 
27
Houchaomen
Nanxingqiao
28
Nanxingqiao
 4 
29
Changhe
 6 
30
Jucai Road
31
Jianghui Road
32
Binkang Road
 1 
33
Bo'ao Road
34
Jinji Road
Line 2 interconnection
35
People's Square  2 
Left arrow Chaoyang  Liangzhu Right arrow
36
North Yucai Road
Left arrow Xiaoshan West
37
Middle Tonghui Road
Left arrow Bailutang  Yingning Right arrow
38
South Railway Station
39
Shuangqiao
40
Guniangqiao
 1 
Guniangqiao Stabling Yard
Down arrow Fangquan
Close

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Liangmu Road — Shanxian 24 June 2019; 5 years ago (2019-06-24) 17.76 kilometres (11.04 mi) 12 Phase 1 (initial section)
Shanxian — Guniangqiao 23 April 2020; 4 years ago (2020-04-23) 36.16 kilometres (22.47 mi) 21 Phase 1 (final section)
Jinxing — Liangmu Road 23 April 2020; 4 years ago (2020-04-23) 4 Phase 2
South Railway Station[6] 30 June 2020; 4 years ago (2020-06-30) Infill station 1
Baoshan Bridge 1 April 2022; 2 years ago (2022-04-01)[7] 1
Close

Stations

Line 5 runs from Jinxing and Guniangqiao. The western terminus, Guniangqiao, is an interchange with Shaoxing Metro Line 1. In the future, there will be an expansion to Yuxiong Academy School and Fangquan, changing Shaoxing Metro Line 1 stations in the main line to Line 5.

Thumb
Legend

  - Operational
  - Under construction

More information Station name, Connections ...
Station name Connections Distance
km
Location
English Chinese
East Nanhu[1] 南湖东 0.42 Yuhang
Jinxing 金星 2.03 2.45
Lvting Road 绿汀路  3   16  2.59 5.04
Gexiang 葛巷 1.75 6.79
Chuangjing Road 创景路  19  0.87 7.66
Liangmu Road 良睦路 1.31 8.97
Cangqian Campus Hangzhou Normal University 杭师大仓前 1.01 9.98
Yongfu 永福 0.93 10.91
Wuchang 五常 1.91 12.82
Jiangcun 蒋村 2.27 15.09 Xihu
Zijingang Campus Zhejiang University 浙大紫金港 0.79 15.88
Sanba 三坝  2  2.28 18.16
Pingshui Street 萍水街 1.47 19.63 Gongshu
Hemu 和睦  10  1.08 20.71
The Grand Canal 大运河 1.68 22.39
East Gongchen Bridge 拱宸桥东 1.62 24.01
Shanxian 善贤  3  1.16 25.17
Xiwen Street 西文街 1.01 26.18
Dongxinyuan 东新园 1.15 27.33
Hangyang 杭氧 1.63 28.96
Datieguan 打铁关  1  1.00 29.86
Baoshan Bridge 宝善桥 1.63 31.49
North Jianguo Road 建国北路  2  0.81 32.30
Wan'an Bridge 万安桥 1.13 33.43 Shangcheng
Chengzhan 城站  1 
China Railway China Railway High-speed HZH
1.08 34.51
Jiangcheng Road 江城路  7  0.75 35.26
Houchaomen 候潮门 1.43 36.69
Nanxingqiao 南星桥  4  1.23 37.92
Changhe 长河  6  2.72 40.64 Binjiang
Jucai Road 聚才路 1.74 42.38
Jianghui Road 江晖路 1.23 43.61
Binkang Road 滨康路  1  1.93 45.54
Bo'ao Road 博奥路 1.26 46.80 Xiaoshan
Jinji Road 金鸡路 0.92 47.72
People's Square 人民广场  2  1.23 48.95
North Yucai Road 育才北路 1.10 50.05
Middle Tonghui Road 通惠中路 0.72 50.77
South Railway Station 火车南站 China Railway China Railway High-speed HZN
 Shaoxing TNT 
1.86 52.63
Shuangqiao 双桥 1.14 53.77
Guniangqiao 姑娘桥  1  (Shaoxing Metro) 2.26 56.03
Close

Description

Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and runs between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (now Keqiao section of Line 1 of the neighboring Shaoxing Metro).[8] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[9] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[10]

Rolling stock

The Line 5 uses higher capacity six car Class AH trains which are 20 cm wider than the Class B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[11]

More information Stock, Class ...
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM126 AH 2018-2020 CRRC Nanjing Puzhen 366 (61 sets) 05 001 - 05 061 (050011-050616) Tc+Mp+M+M+Mp+Tc Wuchang Depot
Guniangqiao Yard
 5 
PMAAD 2024-2025 54 (9 sets) 05 062 - 05 070 (050621-050706) Awaiting delivery.
Close

See also

References

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.