Loading AI tools
Metro line of the Shanghai Metro From Wikipedia, the free encyclopedia
Line 4 is a loop line of the Shanghai Metro network. Its older rolling stock carry a bright purple colour belt to differentiate them from Line 3 trains which share a portion of its route, while the newer stock features a yellow and purple livery, which the exact line is labelled using sticker or screens saying "Line 3" or "Line 4". To determine the direction of travel, the line that travels counter-clockwise is called the Outer Loop (外环), while the other line is known as the Inner Loop (内环). Although it is a loop line, trains returning to the depot use Yishan Road as a terminal to let all passengers disembark. The first segment of the line between Damuqiao Road and Lancun Road (running in a "C"-shape) opened on December 31, 2005. The remainder of the line opened on December 29, 2007. The line is colored purple on system maps.
Line 4 | |||
---|---|---|---|
Overview | |||
Other name(s) | M4 (planned name); Pearl line phase II (Chinese: 明珠线二期); Loop line (Chinese: 环线) | ||
Native name | 上海地铁4号线 | ||
Status | Operational | ||
Owner | Shanghai Rail Transit Pearl Line (Phase II) Development Co., Ltd. (except shared track with line 3 portion) | ||
Locale | Huangpu, Xuhui, Changning, Putuo, Jing'an, Hongkou, Yangpu, and Pudong districts, Shanghai, China | ||
Termini | Continuous loop from/to Yishan Road (terminal for trains to depot) | ||
Stations | 26 (of which 9 shared with line 3) | ||
Service | |||
Type | Rapid transit | ||
System | Shanghai Metro | ||
Operator(s) | Shanghai No. 3 Metro Operation Co. Ltd. | ||
Depot(s) | Puhuitang Depot | ||
Rolling stock | 42 Class A 6-car trains | ||
Daily ridership | 976,000 (2019 Peak)[1] | ||
History | |||
Commenced | 2001 | ||
Opened | December 31, 2005 | ||
Last extension | September 21, 2007 | ||
Technical | |||
Line length | 33.7 km (20.9 mi) (of which 11.57 km (7.2 mi) shared with line 3) | ||
Number of tracks | 2 | ||
Character | Underground and elevated (shared track with line 3 portion) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | Overhead lines (1500 volts DC) | ||
Operating speed | 80 km/h (50 mph) Average speed: 32.7 km/h (20 mph) | ||
Signalling | ALSTOM/CASCO URBALISTM 200[2] (fixed block CBTC, current) CASCO Qiji TACS (2025 exp.)[3] | ||
|
Shanghai metro line 4 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Damuqiao Road — Hongqiao Road | 26 Dec 2000 | 31 Dec 2005 | 3.94 km (2.45 mi) | 5 | Pearl Line (second phase) | ¥12.6 billion |
Hongqiao Road — Baoshan Road | 11.52 km (7.16 mi) (tracks sharing) |
9 | Line 3 & 4 realignment project | |||
Baoshan Road — Lancun Road | 9.76 km (6.06 mi) | 8 | Pearl Line (second phase) | |||
Lancun Road — Damuqiao Road | 22 Oct 2005 | 29 Dec 2007 | 8.7 km (5.41 mi) | 4 | Loop line connector project | |
The line became China's first national "Worker Pioneer" metro line on the 11th October, 2009.
On August 20, 2001, on 20.10 at Luban Road construction site during excavating the foundation pit, earthmoving sudden landslide, killing four people died who were buried in the landslide.[4]
At 4 o'clock in the morning on July 1, 2003, the Pudongnan Road-Nanpu Bridge section of Line 4 suddenly saw water seepage during the construction of the connecting passage between the upper and lower tunnels. After that, a large amount of quicksand poured into the tunnel, causing internal and external pressure imbalance, which caused partial collapse of the tunnel. It has a funnel-shaped settlement. At 9 o'clock in the morning, the podium of a nearby building on South Zhongshan Road collapsed; beginning in the early morning of the July 2, the flood wall of Dongjiadu Waima Road section began to sink and crack due to the settlement. The embankment collapsed in a serious accident. The Linjiang Garden Building near the scene also experienced subsidence, the most serious settlement exceeded 7 millimeters (0.28 in) in an hour, and the cumulative settlement reached 15.6 millimeters (0.61 in). This incident affected the plan for the opening of the entire line of Line 4. In August 2004, the Dongjiadu section restoration project was started and it was restored with the opening of the second section in July 2007.[5] On November 5, 2004, the Shanghai Second Intermediate People's Court issued a judgement on the deputy project manager of the subcontractor for the construction of the intermediate air shaft and side channel freezing method. The court convicted him for the crime of a major liability accident which has a fixed-term imprisonment of two years and six months and a probation of three years. The project director representative has a fixed-term imprisonment of six-month with a probation period of two years. The general contractor's project manager for two years with a fixed-term imprisonment of one year and six months.[6]
At Hailun Road unbalanced subsidence was discovered. From January 22 to January 28, 2012, it was closed for an overhaul.[7][8]
Shanghai metro line 4 service routes | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
Routes | Station name | 3 | Connections | Distance | Location | Open- ing |
Plat- form[9] | ||||
M | P | English | Chinese | km | min | ||||||
— ↑ Loop line towards Shanghai Indoor Stadium (Outer Loop) ↑ — | 1.14 | 1.14 | 3 | ||||||||
● | ● | Yishan Road | 宜山路 | 3 [i] 9 | 0.00 | 0.00 | 0 | Xuhui | 31 Dec 2005[10] |
Underground Island | |
● | Hongqiao Road | 虹桥路 | ● | 10 | 1.37 | 1.37 | 3 | Changning | Elevated Side | ||
● | West Yan'an Road | 延安西路 | ● | Yan'an BRT | 1.41 | 2.78 | 5 | ||||
● | Zhongshan Park | 中山公园 | ● | 2 | 0.96 | 3.74 | 7 | Elevated Island | |||
● | Jinshajiang Road | 金沙江路 | ● | 13 | 1.66 | 5.40 | 10 | Putuo | Elevated Side | ||
● | Caoyang Road | 曹杨路 | ● | 11 14 [ii] | 0.90 | 6.30 | 12 | ||||
● | Zhenping Road | 镇坪路 | ● | 7 | 1.40 | 7.70 | 14 | ||||
● | Zhongtan Road | 中潭路 | ● | 1.44 | 9.14 | 17 | |||||
● | Shanghai Railway Station | 上海火车站 | ● | 1 [iii] SHH | 1.72 | 10.86 | 19 | Jing'an | At-grade Island | ||
● | Baoshan Road | 宝山路 | ● | 2.03 | 12.89 | 23 | Elevated Side | ||||
● | Hailun Road | 海伦路 | 10 | 1.51 | 14.40 | 26 | Hongkou | Underground Island | |||
● | ◐ | Linping Road | 临平路 | 1.07 | 15.47 | 28 | Underground Island & Side | ||||
● | ● | Dalian Road | 大连路 | 12 | 1.40 | 16.87 | 30 | Yangpu | Underground Island | ||
● | ● | Yangshupu Road | 杨树浦路 | 0.72 | 17.59 | 32 | |||||
● | ● | Pudong Avenue | 浦东大道 | 14 | 1.44 | 19.03 | 35 | Pudong | |||
● | ● | Century Avenue | 世纪大道 | 2 6 9 | 1.43 | 20.46 | 37 | ||||
● | ● | Xiangcheng Road[iv] | 向城路 | 0.85 | 21.31 | 39 | |||||
● | ● | Lancun Road | 蓝村路 | 6 | 1.34 | 22.65 | 41 | ||||
● | ● | Tangqiao | 塘桥 | 1.21 | 23.86 | 44 | 29 Dec 2007[11] | ||||
● | ● | Nanpu Bridge | 南浦大桥 | 2.13 | 25.99 | 47 | Huangpu | Underground Split | |||
● | ● | South Xizang Road | 西藏南路 | 8 | 1.22 | 27.21 | 49 | Underground Island | |||
● | ● | Luban Road | 鲁班路 | 1.47 | 28.68 | 51 | |||||
● | ● | Damuqiao Road | 大木桥路 | 12 | 1.19 | 29.87 | 53 | Xuhui | 31 Dec 2005[10] | ||
● | ● | Dong'an Road | 东安路 | 7 | 0.62 | 30.49 | 55 | ||||
● | ● | Shanghai Stadium | 上海体育场 | 1.51 | 32.00 | 57 | |||||
● | ● | Shanghai Indoor Stadium | 上海体育馆 | 1 | 0.67 | 32.67 | 59 | ||||
— ↓ Loop line towards Yishan Road (Inner Loop) ↓ — | 1.14 | 33.81 | 62 | ||||||||
| |||||||||||
There are abandoned plans to end the shared tracks with line 3. Plans include a new underground track for line 4 on the northwestern past.
Shanghai Metro Line 4 headway[12] | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Time | Inner Loop (running clockwise) | Outer Loop (running counterclockwise) | |||||||||
Monday - Friday (Working Days) | |||||||||||
AM peak | 7:00–9:00 |
|
| ||||||||
Off-peak | 9:00–17:00 | About 7 min | |||||||||
PM peak | 17:00–19:30 | About 5 min | |||||||||
Other hours |
| About 5 - 12 min | |||||||||
Saturday and Sunday (Weekends) | |||||||||||
Peak | 7:00–21:00 | About 6 min and 30 sec | |||||||||
Other hours |
| About 5 - 12 min | |||||||||
Lines 3 and 4 has been operating over capacity due to large passenger flows for a number of years. With the continuous extensions of operating time, the problems of aging equipment and increasing passenger demand will further increase the operating pressure of the two lines. In June 2021 it was announced that Shanghai Metro has started to update of the signal system of lines 3 and 4 and finish before December 31, 2024.[13] These are the last lines in the system that are equipped with fixed block Alstom URBALISTM 200 system, not equipped with CBTC systems capable of headways as low as 90 seconds. CASCO successfully won the bid for the renewal and transformation of the signaling for lines 3 and 4 using its self-developed Qiji TACS system.[14]
The line operates with 6-car Class A trains.[i]
Shanghai Metro Line 4 rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufacturing | Class | No of car | Assembly[ii] | Rolling stock | Number | Notes |
168 | Siemens (0401,0402) CRRC Zhuzhou Locomotive Co., Ltd. (0403–0428) | 2004-2007 | A | 6 | Tc+Mp+M+M+Mp+Tc | 04A01 | 0401-0428 (040011-041681) | [15] Original name: AC05. In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4. |
162 | SATCO[iii] (0430–0455) CNR Changchun Railway Vehicles Co., Ltd. (0429) | 2014-2017 | A | 6 | Tc+Mp+M+M+Mp+Tc | 04A02 | 0429-0455 (041691-043301) | 13 trains (042171-042941, trainset 0437-0449) have been assigned to line 3. |
| ||||||||
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.