Leningrad Nuclear Power Plant

RBMK and VVER nuclear power plant in Sosnovy Bor, Leningrad Oblast, Russia From Wikipedia, the free encyclopedia

Leningrad Nuclear Power Plantmap

Leningrad Nuclear Power Plant (Russian: Ленинградская атомная электростанция; Ленинградская АЭС Leningradskaya atomnaya elektrostantsiya; Leningradskaya AES (pronunciation)) is a nuclear power plant located in the town of Sosnovy Bor in Russia's Leningrad Oblast, on the southern shore of the Gulf of Finland, some 70 kilometres (43 mi) to the west of the city centre of Saint Petersburg.

Quick Facts Country, Location ...
Leningrad Nuclear Power Plant
Thumb
Site of the Leningrad I RBMK Nuclear Power Plant
Thumb
CountryRussia
LocationSosnovy Bor, Leningrad Oblast
Coordinates59°51′09″N 29°02′55″E
StatusOperational
Construction began1 March 1970
Commission date1 November 1974
Decommission date21 December 2018 (Unit 1) 10 November 2020 (Unit 2)
OwnerRosenergoatom
OperatorRosenergoatom
Nuclear power station
Reactors8
Reactor typeRBMK-1000, VVER-1200
Reactor supplierAtomstroyexport
Power generation
Units operational2 × 925 MW, 2 × 1085 MW
Units under const.2 × 1085 MW
Units decommissioned2 × 925 MW
Nameplate capacity4050 MW
Capacity factor60.5%
Annual net output21,208 GW·h
External links
Websiterosenergoatom.ru/stations_projects/sayt-leningradskoy-aes/index.php?sphrase_id=31674
CommonsRelated media on Commons
Close

The Leningrad NPP was the first power station in the Soviet Union to operate the RBMK type of reactor. Despite its age, in 2012 and 2013 the Leningrad NPP took the third place in the annual contest for the Best Nuclear Power Plants of the Year.[1] The plant has four nuclear reactors of the RBMK-1000 type, Units 1 and 2 of which are first generation units similar to that of Kursk and Chernobyl units 1 and 2, while the units 3 and 4 are second generation similar to Chernobyl 3 and 4. Each unit has a separate reactor building but the turbine hall is shared between 2 reactors.[2] In 2008, construction started on Leningrad II with 2 VVER-1200 type reactors. They will eventually replace the RBMK units as they are shut down due to age.

Reactor data

Summarize
Perspective

From May 2012 to December 2013, Unit 1 was offline while repairs were made related to some deformed graphite moderator blocks.[3]

On 21 December 2018, the first unit of Leningrad NPP was shut down for decommissioning. Defuelling at unit 1 was completed in August 2021.[4]

On 10 November 2020, the second unit of Leningrad NPP was shut down for decommissioning. Defuelling at unit 2 was completed in December 2024.[5]

Leningrad units 3 and 4 remain operational, the 3rd unit got life extension until 2030.[6]

More information Unit, Reactor type ...
Unit[7] Reactor type Net capacity
(MW)
Gross capacity
(MW)
Construction
started
Grid
connection
Commercial
operation
Shutdown De­fuel­ed
Leningrad - 1 RBMK-1000 925 1000 1970-03-01 1973-12-21 1974-11-01 2018-12-21 (2023)
Leningrad - 2 RBMK-1000 925 1000 1970-06-01 1975-07-11 1976-02-11 2020-11-10
Leningrad - 3 RBMK-1000 925 1000 1973-12-01 1979-12-07 1980-06-29 (2030)
Leningrad - 4 RBMK-1000 925 1000 1975-02-01 1981-02-09 1981-08-29 (2026-12-26)
Leningrad II - 1 VVER-1200/491 (AES-2006) 1085 1187 2008-10-25 2018-03-09[8] 2018-10-29 (2078)
Leningrad II - 2 VVER-1200/491 (AES-2006) 1085 1199 2010-04-15[9] 2020-10-26[10] 2021-03-22[11] (2080)
Leningrad II - 3 VVER-1200/491 (AES-2006) 1085 1199 2024-03-14[12]  ?  ?  ?
Leningrad II - 4 VVER-1200/491 (AES-2006) 1085 1199 2025-03-20[13]  ?  ?  ?
Close

Incidents and accidents

Summarize
Perspective

The first accident at the plant occurred shortly after the first unit came online. On 7 January 1975, a concrete tank containing radioactive gases from Unit 1 exploded; there were no reported accident victims or radiation releases.[14][15]

Less than a month later, on 6 February 1975, the secondary cooling circuit of Unit 1 ruptured, releasing contaminated water into the environment. Three people were killed, and the accident was not reported in the media.[14][15]

On 28 November 1975, a fuel channel in Unit 1 suffered a loss of coolant, resulting in the degradation (partial meltdown) of a nuclear fuel assembly that led to a significant release of radiation lasting for one month. The exposed inhabitants of the Baltic region were not notified of the danger. The accident was not reported in the media. The Ministry of Medium Machine Building blamed the accident on poor construction, rather than on the inherent instability of the reactor design, in an attempt to cover up the accident.[16] The commission investigating the incident made several recommendations to improve safety of RBMK reactors, but they were not implemented.[16] Practically the same accident occurred in Unit 1 of the Chernobyl Power Station in 1982.[14][15][17]

In July 1976 and again in September 1979, due to a poor safety culture, a fire broke out in a concrete vault containing radioactive waste. Water used in extinguishing the fires was contaminated, leaked into the environment, and entered the water table. This was not reported in the media.[17][15]

On 28 December 1990, during refurbishment of Unit 1, it was noticed that the space between the fuel channels and the graphite stack (contaminated during the 1975 accident) had widened. The contaminated graphite was spilled, and the radiation levels in the space under the reactor increased. Radiation was detected 6 km away from the unit, but this was not reported in the media.[17][15]

On 3 December 1991, due to faulty equipment and lack safety rule compliance, 10 new fuel rods were dropped and damaged. The staff tried to conceal the accident from the plant's management.[15]

In March 1992, an accident at the plant leaked radioactive gases and iodine into the air through a ruptured fuel channel. This was the first accident at the station that was announced in the media.[18]

On 27 August 2009, the third unit was stopped when a hole was found in the discharge header of a pump.[19] According to the automated radiation control system, the radiation situation at the plant and in its 30-kilometre (19 mi) monitoring zone was normal.[19] The plant's management refuted rumors of an accident and stated that the third unit was stopped for a "short-term unscheduled maintenance", with a restart scheduled for 31 August 2009.[20]

On 19 December 2015, unit 2 was stopped (scrammed) due to a broken steam pipe. No radioactively contaminated material was released.[21]

Electricity generation

Production of Leningrad Units 1–4, 1974-2017 (TWh/year)

Leningrad II Nuclear Power Plant

Summarize
Perspective
Quick Facts Country, Location ...
Leningrad II Nuclear Power Plant
Thumb
Leningrad II under construction
Thumb
CountryRussia
LocationSosnovy Bor, Leningrad Oblast
Coordinates59°49′52″N 29°03′35″E
StatusOperational
Construction began25 October 2008
Commission date22 March 2021
OwnerRosenergoatom
OperatorRosenergoatom
Nuclear power station
Reactors2 (2 in construction)
Reactor typeVVER-1200/V491 (AES-2006)
Reactor supplierAtomstroyexport
Power generation
Units operational2 × 1085 MW
Units under const.2 × 1085 MW
Nameplate capacity2170 MW
External links
Websiterosenergoatom.ru/stations_projects/sayt-leningradskoy-aes/index.php?sphrase_id=31674
CommonsRelated media on Commons
Close

In December 2019, Leningrad II-1 was integrated into the district heating system of Sosnovy Bor and the local industrial park, replacing the heating capacity of the closed RBMK-1000 units. The thermal output is 3200 MW.[22]

On 25 October 2008, Saint Petersburg Atomenergoproekt began concreting the foundation plate of the reactor building of the Leningrad Nuclear Power Plant II, Unit 1. The cost of the project was estimated at almost 70 billion Russian rubles (about $3 billion US dollars at the time).[23][24] A construction licence was issued on 22 July 2009.[25]