Loading AI tools
Highway in Nevada, United States From Wikipedia, the free encyclopedia
Interstate 15 (I-15) is an Interstate Highway in the U.S. state of Nevada that begins in Primm, continues through Las Vegas and it crosses the border with Arizona in Mesquite. Within the state, the freeway runs entirely in Clark County. The highway was built along the corridor of the older U.S. Route 91 (US 91) and Arrowhead Trail, eventually replacing both of these roads.
Las Vegas Freeway | ||||
Route information | ||||
Maintained by NDOT | ||||
Length | 123.762 mi[1] (199.176 km) | |||
Existed | June 29, 1956–present | |||
NHS | Entire route | |||
Major junctions | ||||
South end | I-15 at California state line | |||
North end | I-15 at Arizona state line | |||
Location | ||||
Country | United States | |||
State | Nevada | |||
Counties | Clark | |||
Highway system | ||||
| ||||
|
The entire route of I-15 is designated the Las Vegas Freeway.[1]
Motorists in California begin a long descent through Ivanpah Valley and Ivanpah Dry Lake. I-15 crosses the Nevada state line at the first exit, Primm. Once I-15 leaves Primm, the route travels north through the desert with few services. The highway then enters the Las Vegas urban area upon passing the State Route 146 (SR 146, Saint Rose Parkway) interchange.
From Silverado Ranch Boulevard to US 95, the freeway has HOV lanes that are currently enforced by both Metro and NHP, 24 hours a day and 7 days a week and is the only state within the nation to do so.[2][3]
The Interstate meets I-215 at the Southern Beltway Interchange, which provides access to Henderson and Harry Reid International Airport. Originally, this interchange was termed Son of Spaghetti Bowl by the Las Vegas Review-Journal when it was built.[citation needed]
I-15 travels along the west side of the Las Vegas Strip corridor and just west of downtown Las Vegas just before its junction with I-11 and US 95 (the "Spaghetti Bowl" interchange). Then, the Interstate enters North Las Vegas and continues to run roughly parallel to Las Vegas Boulevard (old US 91) as it leaves the Las Vegas urban limits near the northern junction with the Clark County 215 beltway.[4]
Once I-15 leaves North Las Vegas, the freeway travels northeast and crosses the Muddy River at Glendale and then climbs up onto the Mormon Mesa. At Mesquite, the freeway then crosses the Arizona state line and cuts through the extreme northwestern corner of Arizona through the Virgin River Gorge before entering Utah.
The general location of the I-15 corridor through Nevada can be traced as far back as the early 1900s. Regular automobile travel through southern Nevada was established by 1914 along the Arrowhead Trail, a road connecting Los Angeles and Salt Lake City.[5] In 1919, the Nevada Legislature amended its newly adopted highway law to add SR 6, which was described as "Commencing at the Arizona line near Mesquite and running southwesterly over what is now known as the Arrow Head [sic] trail through Las Vegas to Jean, Nevada."[6] Two years later, the route was revised to pass through Las Vegas and head "via Jean or Goodsprings to a junction with the California state highway system."[7]
US 91 was later proposed as part of the original 1925 U.S. Highway System plan. As originally proposed, US 91 would have followed SR 6 southwest from Mesquite to downtown Las Vegas, where it would then turn southeast along SR 5 to California via Searchlight.[citation needed] The revised 1926 plan had proposed US 91 follow SR 6 through Las Vegas and Jean to the California state line.[citation needed] Nevada's 1927 official highway map reflects the routing of the final 1926 plan; however, a few maps from the era indicate the original proposal.[8][9]
US 91 / SR 6 began at Primm and followed the Los Angeles Highway toward Las Vegas. Within the city limits, it ran along Fifth Street (now Las Vegas Boulevard) through downtown and into North Las Vegas, where it departed from 5th at Main Street. Exiting the Las Vegas area to the northeast, US 91 became the Salt Lake Highway and then headed toward Apex and Glendale. The highway then curved east-northeast before following present-day SR 170 through Riverside and Bunkerville into Mesquite. US 91 was routed through that city on Mesquite Boulevard, Sandhill Boulevard and Fairview Avenue before crossing the Arizona state line. By 1929, the alignment of US 91 / SR 6 was graded throughout much of the state, a distance of 129.5 miles (208.4 km).[10]
The route eventually gained two other highway overlaps. US 466 was christened in 1934, and was routed concurrently along US 91 from California to downtown Las Vegas before heading southeast to Hoover Dam (the route was deleted in 1971).[11] Also, in 1936, US 93 was extended from its 1932 southern terminus at Glendale, over US 91 to downtown Las Vegas on its way to Hoover Dam.[12]
A new alignment of US 91 was completed in 1955. This bypassed both Bunkerville and Mesquite to the northwest, along what would become the future path of I-15.[13] The original alignment through Bunkerville is now SR 170.
The passage of the Federal Aid Highway Act of 1956 quickly brought upgrades to the US 91 corridor. The first section of the newly designated I-15 opened by 1960. This stretch extended from the California state line to just north of Sloan.[14] In 1963, the new freeway reached the south end of the Las Vegas Valley at Blue Diamond Road, and more than 20 miles (32 km) south of Glendale was also finished.[15] By 1967, I-15 had been constructed along the entire length of US 91 except through parts of Las Vegas and near Mesquite.[16]
The final sections of I-15 to be completed were in North Las Vegas and near the Arizona state line.[17] Both of these sections were completed in 1974. The US 91 designation, which had remained on its original alignment during the construction of the Interstate, was made redundant by the new freeway and was removed in 1974.[18]
Between Las Vegas and the California state line, the Nevada Department of Transportation (NDOT) added call boxes at one-mile (1.6 km) intervals in the mid-2000s, for motorists with vehicle problems and without cell phone service. This was done as part of a larger project that expanded this portion of the freeway to three travel lanes in each direction to coordinate with a similar effort in California.
In August 2011, I-15 in southern Las Vegas was substantially expanded. This involved adding between 30 and 85% more capacity and involved the use of the Big Stan drill rig.[19]
Due to heavy traffic, there are plans by the California Department of Transportation (Caltrans) and NDOT to widen I-15 in both directions from both US 395 in Hesperia and I-40 in Barstow to I-215 in Enterprise.[20][21][22]
In 2020, Brightline signed a 50-year lease for use of the I-15 right-of-way between Victor Valley and the Las Vegas Valley for use in their Brightline West high-speed rail service.[23][24]
The entire route is in Clark County.
Location | mi[25][26] | km | Exit | Destinations | Notes | |
---|---|---|---|---|---|---|
Primm | 0.00 | 0.00 | — | I-15 south – San Bernardino, Los Angeles | Continuation into California; former US 91 south/US 466 west | |
0.39 | 0.63 | 1 | Primm (Primm Boulevard) | |||
Jean | 12.63 | 20.33 | 12 | SR 161 west (Goodsprings Road) – Jean, Goodsprings | ||
Enterprise | 25.52 | 41.07 | 25 | Sloan (Via Inspirada) | Proposed interchange upgrade; former SR 739 east; Via Inspirada was formerly Sloan Road[27] | |
27.84 | 44.80 | 27 | SR 146 east (Saint Rose Parkway) / Southern Highlands Parkway – Henderson, Lake Mead | |||
29.37 | 47.27 | 29 | Starr Avenue | |||
30.39 | 48.91 | 30 | Cactus Avenue | |||
31.36 | 50.47 | 31 | Silverado Ranch Boulevard | Southern end of I-15 HOV lanes | ||
33.55 | 53.99 | 33 | SR 160 (Blue Diamond Road) – Pahrump | |||
34.85 | 56.09 | 34 | I-215 east / CC 215 west / Las Vegas Boulevard – McCarran Airport, Henderson | Northbound exit is part of exit 33; southbound exit to CC 215 west is part of exit 36; future I-215 west; I-215 exit 12 | ||
Paradise | 36.39 | 58.56 | 36 | Russell Road | Signed as exit 35 northbound; northbound also includes exit to Frank Sinatra Drive; former SR 594 | |
37.40 | 60.19 | 37 | Tropicana Avenue (SR 593) | Signed as exit 36 northbound; northbound also includes exit to Frank Sinatra Drive | ||
37.90 | 60.99 | ♦ | Harmon Avenue | The Harmon Half Interchange, a northbound-only left HOV exit created by the Tropicana Avenue road project in 2024. | ||
38.35 | 61.72 | 38 | Flamingo Road (SR 592 west) | Signed as exits 38A (west) and 38B (east) southbound | ||
39.16 | 63.02 | 39 | Spring Mountain Road | Former SR 591 | ||
Las Vegas | 40.55 | 65.26 | 40 | Sahara Avenue | Former SR 589 | |
41.47 | 66.74 | ♦ | Neon Gateway (Western Avenue) | HOV interchange | ||
41.75 | 67.19 | 41 | SR 159 (Charleston Boulevard) | Northbound ramps also include access to Alta Drive, Bonneville Avenue and Grand Central Parkway; serves University Medical Center of Southern Nevada and Valley Hospital Medical Center | ||
42.89 | 69.02 | 42 | I-11 / US 93 south / US 95 / Martin L. King Boulevard – Downtown Las Vegas, Phoenix, Reno | Spaghetti Bowl Interchange; Northern end of I-15 HOV lanes; southern end of US 93 concurrency; HOV access to US 95 north; signed as exits 42A (north) and 42B (south) northbound; I-11/US 95 exit 76 future exit 37; former I-515 south | ||
43.47– 43.60 | 69.96– 70.17 | 43 | D Street, City Parkway, Washington Avenue (SR 578 east) | Signed as exit 44 southbound | ||
North Las Vegas | 44.72 | 71.97 | 45 | Lake Mead Boulevard (SR 147 east) | Serves North Vista Hospital | |
46.43 | 74.72 | 46 | Cheyenne Avenue (SR 574) | |||
48.41 | 77.91 | 48 | Craig Road (SR 573) | |||
50.13 | 80.68 | 50 | Lamb Boulevard (SR 610 south) | |||
52.00 | 83.69 | 52 | CC 215 west / Tropical Parkway | Signed as exits 52A (CC-215 west) and 52B (Tropical Parkway) northbound[28] future I-215 west | ||
53.62 | 86.29 | 54 | Speedway Boulevard, Hollywood Boulevard | |||
58.14 | 93.57 | 58 | SR 604 south (Las Vegas Boulevard) – Apex, Nellis AFB | Former US 91/US 93 | ||
Garnet | 64.29 | 103.46 | 64 | US 93 north (Great Basin Highway) – Ely | Northern end of US 93 concurrency; Diverging diamond interchange[29][30] | |
Crystal–Moapa River Indian Reservation line | 75.67 | 121.78 | 75 | Valley of Fire, Lake Mead (Valley of Fire Highway) | ||
Moapa River Indian Reservation | 80.76 | 129.97 | 80 | Ute | ||
| 84.54 | 136.05 | 84 | Byron | ||
| 88.68 | 142.72 | 88 | Hidden Valley (Hidden Valley Road) | ||
Glendale–Moapa line | 90.84 | 146.19 | 90 | SR 168 west (Glendale–Moapa Road) – Glendale, Moapa | Northbound exit and southbound entrance; SR 168 west was former US 93 north | |
91.61 | 147.43 | 91 | Glendale, Moapa (Glendale Boulevard, Lewis Ranch Road) | No southbound entrance | ||
Moapa Valley | 93.89 | 151.10 | 93 | SR 169 south (Moapa Valley Boulevard) – Logandale, Overton | ||
| 100.43 | 161.63 | 100 | Carp, Elgin (Carp–Elgin Road) | ||
Mesquite | 112.01 | 180.26 | 112 | SR 170 east (Riverside Road) – Riverside, Bunkerville | SR 170 east was former US 91 north | |
118.14 | 190.13 | 118 | Lower Flat Top Drive | |||
120.34 | 193.67 | 120 | Falcon Ridge Parkway, Mesquite Boulevard | Dumbbell interchange; Mesquite Boulevard was former I-15 Bus. north/SR 144 north | ||
122.90 | 197.79 | 122 | Pioneer Boulevard, Sandhill Boulevard | Sandhill Boulevard was former I-15 Bus. south/SR 144 south | ||
123.76 | 199.17 | — | I-15 north (Veterans Memorial Highway) – Salt Lake City | Continuation into Arizona | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.