Loading AI tools
Military light utility/combat multi-role vehicle From Wikipedia, the free encyclopedia
The Joint Light Tactical Vehicle (JLTV), known and marketed under Oshkosh development as the L-ATV (Light Combat Tactical All-Terrain Vehicle), is a light utility/combat multi-role vehicle. The Oshkosh-developed JLTV was selected for acquisition under the US military's Army-led Joint Light Tactical Vehicle program. In the very early stages of the program it was suggested that JLTV would replace the AM General High Mobility Multi-purpose Wheeled Vehicle (HMMWV) on a one-for-one basis. It is now suggested that the JLTV will partially replace the HMMWV.[8]
Joint Light Tactical Vehicle (JLTV or Joltvee) L-ATV | |
---|---|
Type | Light utility/combat multi-role vehicle Mine-resistant ambush protected vehicle (MRAP) |
Place of origin | United States |
Service history | |
In service | January 2019[1] – present |
Used by | United States Army United States Marine Corps United States Air Force |
Wars | Israel–Hamas war[2] |
Production history | |
Designer | Oshkosh |
Designed | 2011[3] |
Manufacturer | Oshkosh (JLTV A1) AM General (JLTV A2)[4] |
Unit cost | $370,000–$399,000[5] |
Produced | Contract placed 25 August 2015; first test JLTV delivered to Army in 2016. Full rate production transition approved in 2019 |
No. built | 19,727 (est.) JLTVs ordered by January 2022, with about 19,000 of those for US armed forces |
Variants | All JLTV variants except* M1278 Heavy Guns Carrier[3] M1279 Utility[3] M1280 General Purpose[3] M1281 Close Combat Weapons Carrier[3] *L-ATV Ambulance[6] |
Specifications | |
Mass | Gross vehicle weight: 22,500 lb (10,200 kg) |
Length | 20.5 ft (6.2 m) (nominal) |
Width | 8.2 ft (2.5 m) (nominal) |
Height | 8.5 ft (2.6 m) (nominal) |
Crew | 1 + 3 in individual seats + optional gunner (I + 1; M1279 Utility) |
Armor | Classified (A-kit/B-kit configuration) |
Main armament | A variety of light and medium caliber weapons, AGLs, or ATGMs can be fitted |
Engine | 6.6 L Gale Banks Engineering 866T V8 (based on General Motors Duramax L5P)[7] 400 hp (298 kW; 406 PS); 850 lb⋅ft (1,152 N⋅m)[7] |
Transmission | Allison 2500SP 6-speed automatic |
Suspension | Oshkosh TAK-4i independent suspension |
Operational range | 300 miles (480 km) |
Maximum speed | Forward Road: 70 mph (110 km/h) Off road: varies Reverse: 8 mph (13 km/h) |
Steering system | Power-assisted, front wheels |
The L-ATV was designed to deliver a level of protection comparable to that of heavier and less maneuverable Mine Resistant Ambush Protected (MRAP) class designs, these having more protection from blast than up-armored HMMWVs which they were delivered to replace on deployed operations.[8]
In August 2015, the L-ATV was selected as the winner of the JLTV program.[9] The first JLTV delivery order was placed in March 2016 with the U.S. Army ordering 657 examples.[10] Overall requirements have fluctuated, but as of January 2022[update] were stated by Micheal Sprang, JLTV Project Director to be 49,099 for the Army; approximately 12,500 for the Marine Corps; 2,000 for the Air Force (dependent on funding); and approximately 400 for the Navy.[8]
The JLTV achieved initial operating capability in the U.S. Marine Corps in 2019. The Army recompeted the right to manufacture the JLTV beginning with the A2 variant. In 2023, the Army selected AM General. Oshkosh expects to produce JLTVs into early 2025 and retains the right to produce JLTVs for direct commercial sale.
The idea for the Joint Light Tactical Vehicle (JLTV) first emerged in 2006 from threats experienced during the Iraq War. The primary tactical wheeled vehicle used by the U.S. military at the start of the war was the Humvee. However, most were unarmored and the type (including armored examples) incurred heavy losses when improvised explosive devices (IEDs) began being employed by insurgents. The initial response was to add armor, or more armor to armored models, and primarily on the sides. This improved side protection against direct fire and associated threats, but since the chassis was not designed to handle any further additional weight, there was little room for underbody protection. The added armor weight greatly reduced remaining useful payload capacity (within max gross weight), negatively impacted off-road mobility, compromised vehicle reliability, and greatly increased their maintenance needs (frequency, labor and parts costs).
To combat increasing numbers of IED attacks, the U.S. rapidly procured some 29,000 Mine Resistant Ambush Protected (MRAP) vehicles, including the Oshkosh M-ATV for use in Iraq and Afghanistan. While MRAPs offered superior protection from IEDs, especially underbody blasts, they were significantly larger and heavier and had relatively poor off-road mobility. The military incorporated MRAPs in response to operational needs, but never intended them to become a permanent part of their tactical wheeled vehicle fleets. At the conclusion of operations, many thousands were either scrapped, adapted for other roles, or offered for sale/transfer to allies. Ultimately U.S. armed forces would retain over 11,100 MRAPS, just over 6,350 of these Oshkosh M-ATVs.[11]
Since up-armoring Humvees and buying MRAPs addressed specific issues but created gaps in vehicle capabilities, the JLTV program was started to incorporate lessons learned and balance payload, mobility, and protection into a new vehicle. Its purpose was to restore the mobility commanders had with the original Humvee, while having the side and underbody protection of a basic MRAP. It would be around two-thirds the weight of an MRAP, possible to be carried under a CH-47 Chinook and CH-53E Super Stallion and by amphibious vessels, things impossible for an MRAP. It would also be 70 percent faster off-road, adding to survivability by enabling it to egress a combat situation faster. Compared to the Humvee, the JLTV was to have the mobility of early unarmored versions with greater protection than up-armored versions, along with greater reliability, payload capacity, and ease of repair. The JLTV is the first vehicle purpose-built for network connectivity into the Warfighter Information Network-Tactical.[9][12][13][14][15]
The Joint Chief of Staff's Joint Requirements Oversight Council approved the JLTV program in November 2006; this began a 13-month Concept Refinement phase which is a pre-systems acquisition process designed to further develop the initial concepts resident in the Initial Capabilities Document. The Concept Refinement phase also includes an Analysis of Alternatives. At the conclusion of the Concept Refinement phase in December 2007, the Joint Program Office JLTV project manager intended to transition the program directly into the engineering, manufacturing, and development phase.[16]
As the milestone approached, it became clear that the Under Secretary of Defense for Acquisition and Sustainment would not support the JLTV program entering into the acquisition process at that time. He denied the request and instructed the Army and the Marine Corps to develop a more vigorous Technology Development (TD) phase.[16]
The DoD released a request for proposal (RfP) for the TD phase of the JLTV program in February 2008.[16] In October 2008, the Pentagon narrowed the field of vendors to respondents Lockheed Martin, General Tactical Vehicles and BAE Systems/Navistar. Each team was awarded contracts worth between $35.9 million and $45 million to begin the next phase of the program.[17]
These teams were as follows:
Entries during the engineering and manufacturing development phase were not limited to the winners of the TD phase. At least six teams submitted bids.[21] In August 2012, the Army and Marine Corps selected the Oshkosh Defense L-ATV, Lockheed Martin JLTV, and AM General BRV-O, as the winners of the EMD phase. They were awarded a contract to build 22 prototype vehicles.[22]
Each company delivered 22 vehicles and six trailers to Aberdeen Proving Ground, Maryland, and Yuma Proving Ground, Arizona. Previous testing had already put the vehicles through more than 400 ballistic and blast tests on armor testing samples, underbody blast testing, and more than 1,000 miles in shakedown testing. Soldiers from the Army Test and Evaluation Command and personnel from the Defense Department's Office of Test and Evaluation would begin to put the vehicles through field testing during 14 months of government performance testing. Testing was scheduled for completion by FY2015, with a production contract to be awarded to a single vendor for almost 55,000 vehicles (49,099 Army; 5,500 Marines). In September 2013, full-pace, full-scope JLTV testing began at Aberdeen Proving Ground, Yuma, and Redstone Arsenal, Alabama.[23][24][25][26][27]
Oshkosh Defense first displayed the L-ATV at Association of the United States Army (AUSA) in Washington, D.C. in October 2011.[28] The L-ATV had developmental origins that trace back to 2007 and Oshkosh/Northrop Grumman's failed JLTV proposal, with some sub-systems having a lineage that trace back to 2005. At the time, L-ATV was the lightest tactical vehicle designed by Oshkosh, being some 50% lighter than anything previously produced by the company.
Oshkosh and partner Northrop Grumman submitted an unsuccessful bid for the JLTV technology development phase in 2008. Limited details were disclosed about the bid other than that the armor was developed by Plasan and the engine was diesel electric.[29][30]
At AUSA 2011, Oshkosh suggested that following then recent program developments, L-ATV would be offered to meet the recently revitalized JLTV's EMD (Engineering & Manufacturing Development) phase.[31]
In February 2013, Oshkosh unveiled the Utility Variant of its JLTV offer, fulfilling JLTV's requirement for a two-seat cargo vehicle. The vehicle's performance was demonstrated at the 2013 NATC Technology Rodeo at the Nevada Automotive Test Center (NATC). The Utility Variant is designed to provide mobility for loads such as containers, pallets, and break bulk cargo. It can also be outfitted as a shelter carrier to carry standard shelters for communications systems, on-board electronics, and other functions. Payload capacity is in excess of 5,100 pounds. Both Oshkosh L-ATV variants have a common crew protection system, automotive systems, and the Oshkosh TAK-4i intelligent independent suspension system.[32]
In June 2013, L-ATV prototypes participated in an event hosted by the U.S. JLTV Joint Program Office in Quantico, Virginia. The vehicles successfully completed the severe off-road track (SORT) without failure. The SORT demonstrated the L-ATV's ability to maneuver steep inclines, turn sharply, and operate in rugged terrain.[33]
In August 2013, Oshkosh delivered its first L-ATV JLTV prototype to the Army for government testing. The four-door variant (which has two base platforms – Close Combat Weapons Carrier (CCWC) and the General Purpose (GP))[34] and two-door Utility Variant were provided for evaluations.[35]
In July 2014, Oshkosh announced the L-ATV had completed 200,000 miles and all requirements for reliability, availability, maintainability (RAM) testing.[36] In November 2014, Oshkosh announced the L-ATV had completed limited user testing (LUT) with the U.S. Army and Marine Corps for the JLTV EMD contract. The LUT focused on JLTV system capabilities, functions, operations, and interfaces in a range of simulated tactical environments covering operator and crew-level preventive maintenance for the entire system, ensuring they could operate proficiently and safely. The Army held theirs the previous September and October, where three tests were held as 96-hour cycles to simulate operational missions, one of which incorporated a live fire demonstration. The Marines completed two test cycles in October and November with one live fire demonstration.[37] The Army released the final JLTV RfP in December 2014.[38] On 10 February 2015 Oshkosh Defense issued a press release announcing the company had submitted its proposal (the L-ATV) in response to the JLTV Low Rate Initial Production (LRIP) and full-rate production (FRP) RfP.[39]
In August 2015, the Army selected the Oshkosh L-ATV as the winner of the JLTV competition. The company was awarded a $6.75 billion low-rate initial base contract with two years of low-rate Initial Production (LRIP), originally three, and eight option years to procure the first 16,901 vehicles for both the Army and Marines. The Army initially declined to detail why the L-ATV was chosen over its competitors, likely owing to anticipations of protests from the losing bidders.[9]
Lockheed Martin protested the award in the Court of Federal Claims, but withdrew it February 2016.[40] potentially as a result of the release of JLTV testing data showing that the L-ATV lasted nearly six times longer between significant breakdown than Lockheed's vehicle.[41][42]
The first delivery order for JLTV was announced in March 2016 with the U.S. Army ordering 657 JLTVs, along with kits and support. The $243 million order included vehicles for the Army and Marines.[43][44] As part of the original JLTV base award in August 2015, an initial 201 JLTVs for the test and evaluation phase were ordered. The 657-vehicle order is an exercised option from the program's eight option years.[45] Initial USMC operating capability was stated to be delayed by about one year to the first quarter of FY2020, with procurement by the Marines complete by FY2022.[46]
In March 2016, the Pentagon announced that the total program costs had dropped 19.32%, from $30.574 billion to $24.668 billion "due primarily to revised estimates for unit costs of vehicles and kits based on realized savings", which accounted for a $3.7 billion decrease. A stretched out procurement "due to budget adjustments and revised assumptions regarding the maximum buy profile year" decreased costs by $1.28 billion, and several other changes – such as for cost estimation methodologies and indices – accounted for another $921 million decrease.[47] The total cost estimates include "research and development, procurement, military construction, and acquisition-related operations and maintenance" associated with a program, the Pentagon said. These reflect actual costs so far and anticipated costs in the future, with all estimates in fully inflated then-year dollars.[47] The Army expected the JLTV program to cut about five years off of the total program and save about US$5.9 billion, as Oshkosh's final competitive bid was low enough so the Army decided to "buy to budget" and get more platforms each year, which shrunk the total length of the contract and increased cost avoidances accrued each year.[48]
The Pentagon FY2017 requested budget included US$587.5 million to procure 1,828 JLTVs for the Army and US$113.2 million to procure 192 for the Marines. About US$34.7 million was requested for research and development between the Army and Marines' JLTV programs.[49] Procurement objectives at this time remained 49,099 JLTV for the Army and 5,500 for the Marines.[50]
In January 2017, the U.S. Air Force announced it was considering acquiring JLTVs for its security forces that protect missile launch facilities.[51] The vehicles are used by security forces, explosive ordnance disposal teams, para-rescue and personnel recovery units, tactical air control party teams, and special tactics forces.[52] In its 2018 budget the Pentagon requested $1.143 billion for the program. The DoD requested 2,110 JLTVs for the Army, 140 for the Air Force, and 527 for the Marines.[53]
In June 2017 the Marines revealed they wished to adjust their acquisition objective for JLTV by 65% to up to 9,091 vehicles.[54]
In early 2018 the Marines 2018 planning objective for JLTV was disclosed to be 9,091, although funding (as of April 2018) allowed for only 7,622 JLTVs through FY2023, with deliveries concluding the first quarter of FY 2025. The Marine Corps declared initial operational capability for the JLTV in August 2019.[55]
JLTV totals have varied over time and numerous suggestions as to ultimate totals and production increases/decreases have been touted, but as of January 2022 JLTV requirements were: Army – 49,099 (this figure has remained relatively constant); Marine Corps – 12,500 (approx.); Air Force – 2000 (dependent on funding); Navy (approx. 400).[8][56]
In terms of contracts and orders, the initial JLTV contract award in summation had a potential value of US$6.749 billion and called for a maximum of 16,901 JLTVs. The second and follow-on sole source to Oshkosh contract allows for 6,262 JLTVs to be ordered by November 2023. In September 2020 a Justification and Approval (J&A) for up to an additional 6,262 JLTVs was granted, the original notice published in June 2020. The up to 6,262 JLTVs approved will technically be delivered under a separate second JLTV contract, but the original contract costings and timelines remain. Final orders are to be placed in November 2023, with deliveries permitted until late 2025, but expected to conclude mid-2025. The JLTV A2 re-compete award will allow for an additional 15,586 JLTV.[8][56]
JLTV deliveries to the Army commenced in January 2019.[citation needed] That month the 1st Armored Brigade Combat Team, 3rd Infantry Division at Fort Stewart, Georgia, and Marine Corps 3rd Battalion, 8th Marines, 2nd Marine Division at Camp Lejeune, California, became the first respective units equipped.[57][58] In June 2019, the Army approved the JLTV program's transition into full-rate production (FRP).[59]
The Marine Corps declared initial operational capability for the JLTV in August 2019, ahead of the scheduled June 2020 date.[60] The Marines had previously announced in January 2019 that its first JLTV had fielded that day at the School of Infantry West at Camp Pendleton, California, with around 1,000 further JLTVs scheduled to be fielded during FY2020.[55]
For FY2020 the Pentagon's JLTV funding request totaled US$1.641 billion to procure 2,530 vehicles for the Army, 1,398 for the Marine Corps (with 3,986 more between FY2021 and FY2024), 140 for the Air Force, and 22 for the Navy. As of May 2019, the Army had not changed its approved acquisition objective of 49,099 JLTVs.[61]
In July 2020, Oshkosh stated that over 7,500 JLTVs had been delivered to the U.S. Army, U.S. Marine Corps, U.S. Air Force, and U.S. Navy since the production contract was awarded in 2015.[62] This order brought the total of JLTVs ordered for US forces to date to 15,052.
In February 2021 Oshkosh announced the company had produced its 10,000th JLTV, and had received orders for 18,126 JLTVs in contracts totaling more than $6 billion. The first National Guard fielding of JLTV was the 19th SF in 3QFY21.
As of April 2022, 15 JLTV delivery orders had been placed:[8][56]
(all orders include unspecified quantities of training, support, kits and/or trailers)
Current U.S. Army and Marines orders are for around 19,150 JLTVs.[8]
In July 2019 an initial Sources Sought notice was issued for the A2 JLTV recompete program. Four draft request for proposals (RFPs) followed, these on 3 April 2020, 11 December 2020, 30 April 2021, and 29 October 2021.[8]
In January 2022, a presolicitation notice was issued for the Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On, the A2 contract. The planned period of performance for this contract is from September 2022 through September 2032. The awarded contract will be a single award, five-year requirements type contract, with five one-year options on a Cost-Plus Fixed-Fee and Firm-Fixed Price basis. The projected contract value is $7.3 billion with original contract award pricing retained (plus inflation), and the award is expected to call for a maximum of 15,425 A2 JLTV and 6,000 JLTV Trailers, with deliveries to commence 18 months after the contract award. In addition to Oshkosh, respondents to the RfP were expected to include AM General, GM Defense, and Navistar. Oshkosh maintains the rights to produce JLTVs for direct commercial sale.[8]
In February 2023, the Army selected the AM General bid.[63] Oshkosh submitted a protest of the award, which GAO denied.[64] Oshkosh expects to produce JLTVs into early 2025.[65]
The L-ATV is based around Oshkosh's TAK-4i (i = intelligent) independent suspension system. Vehicles fitted with an earlier version of the system, include the Oshkosh Medium Tactical Vehicle Replacement (MTVR), Oshkosh Logistic Vehicle System Replacement, and Oshkosh MRAP All-Terrain Vehicle (M-ATV); the TAK-4 system has also been retro-fitted to the Force Protection Inc Cougar and BAE Systems RG-33 MRAPs.[66] The majority of systems supplied pre-JLTV have been coil-sprung. The TAK-4i version fitted to the L-ATV remains undisclosed, but is not coil-sprung and is of the variable adjustable ride-height type with up to 20 inches (51 cm) of wheel travel, 25 percent more than the current standard.[67][68][56]
Motive power is provided by a digitally-controlled Gale Banks Engineering 866T V8 turbodiesel, based on the architecture of the General Motors Duramax L5P. Power output is 400 hp (298 kW; 406 PS) and 850 lb⋅ft (1,152 N⋅m) of torque. In commercial use, power output of the standard Duramax L5P engine is currently up to 445 hp (332 kW; 451 PS) and 910 lb⋅ft (1,234 N⋅m).[7] An Allison 2500SP six-speed fully automatic transmission is fitted to all JLTV. The L-ATV can be fitted with the Oshkosh ProPulse diesel-electric powertrain, previously fitted to the Oshkosh Heavy Expanded Mobility Tactical Truck (HEMTT) and MTVR. According to Oshkosh literature,[69] the ProPulse diesel-electric powertrain dramatically improves fuel economy by up to 35 percent in certain circumstances and serves as an on-board generator with enough output to power an entire airfield or hospital, generating up to 120 kW of AC power for external operations; the hybrid powertrain was not a requirement of the JLTV program.[67] A hybrid electric JLTV was unveiled in January 2022, this fitted with a lithium-ion battery pack.[56]
In a limited user test (LUT) c. 2016, the L-ATV demonstrated reliability of 7,051 "Mean Miles Between Operational Mission Failure", more than the Humvee and either other JLTV competitor.[70]
The L-ATV offers protection levels greater than those of up-armored HMMWVs and comparable to those of original MRAP class designs, but in an overall vehicle package that is considerably smaller and lighter than vehicles procured under MRAP procurement.[71] The JLTV armor is modular with an A-kit and a B-kit. The A-kit, which is installed during production, is primarily fixings for add-on armor but can include small amounts of armor fitted in difficult-to-reach areas. The B-kit is essentially the add-on armor, this added when required and as a modular add-on. According to the US Army, the A-kit/B-kit concept allows the Army flexibility in several areas: the armor B-kit can be taken off when not needed – reducing unnecessary wear and tear on the vehicles.[72] Oshkosh developed the CORE 1080 crew protection system for the vehicle, comprising the hull design, armor materials, a fire-extinguishing system, and energy-absorbing floors, seats, and restraint systems for crew members and stowage.[73]
The Oshkosh M-ATV, which was procured primarily for Afghanistan where the earlier and bigger/heavier MRAPs had mobility issues, has protection comparable to the original MRAP designs, but while smaller it still remains a relatively large vehicle. During the L-ATV design process, every component was optimized for survivability, resulting in the same level of protection in a vehicle 30 percent smaller. This resulted in a curb weight for the JLTV requirement of 14,000 lb (6,400 kg), almost one-third the weight of the heavier MRAP (4x4) models,[74] and almost half the weight of the original MRAP models.[75] Payload allowance for the JLTV in Combat Tactical Vehicle (CTV) configuration was four passengers and 3,500 lb (1,600 kg) of cargo, and in Combat Support Vehicle (CSV) configuration was two passengers and 5,100 lb (2,300 kg) of cargo.[76]
The base L-ATV does not have a standard armament, however it can be fitted with a selection of weapons including light, medium, and heavy machine guns, automatic grenade launchers, or anti-tank guided missiles (ATGMs) depending on user requirements. The weapons can be operated from ring mounts or a remote weapon station.[67][68] Smoke grenade launchers for self-defence can also be fitted if required.
The JLTV family and its nomenclature evolved throughout the development process and to date the U.S. Army has allocated M designations to four individual JLTV configurations. The JLTV family now consists of three base vehicle platforms, Utility (JLTV-UTL), Close Combat Weapons Carrier (JLTV-CCWC) and General Purpose (JLTV-GP). The Utility base vehicle platform is a two-door configuration, the General Purpose and Close Combat Weapons Carrier base vehicle platforms are a four-door configuration. Standard U.S. military M-designators are applied base vehicle platforms when outfitted to a specific Mission Package Configuration. These currently are:
This features a new Duramax engine.[77]
Showcased at the Association of the United States Army (AUSA) Global Force Symposium in 2019. The L-ATV Ambulance is based on the Utility configuration base platform and the rear can hold 4 litters or up to 8 seated patients or a combination of the two.[6]
In January 2022 Oshkosh unveiled a hybrid-electric Joint Light Tactical Vehicle (eJLTV) technology demonstrator that uses a ‘commercially available' lithium-ion battery. It takes the diesel engine of the JLTV about 30 minutes to charge the lithium-ion battery, and then the eJLTV can operate off of battery power for approximately the same amount of time. It can export up to 115 kW of power. The hybrid electric configuration adds more than 453 kg to the vehicle's curb weight.
In May 2016, the Army confirmed a plan, suggested since late 2015, to use the JLTV for the Light Reconnaissance Vehicle (LRV) requirement.[78] By 2020 the LRV requirement had evolved to such an extent that it excluded the JLTV, requiring a six-person crew.[56]
From June 2019 a dedicated trailer (JLTV-T) is being procured for the JLTV, as in-service trailers were unable to safely match the performance and mobility of the JLTV. A dedicated companion trailer for the JLTV (the JLTV – Trailer (JLTV-T) formed part of the requirement from its early stages, and the production contract awarded to Oshkosh included the option for trailer production. The decision was taken to leverage the investment made in the HMMWV’s Light Tactical Trailer (LTT) and not to resource procurement of the JLTV-T.
As a result of this, initial quantities were limited to test examples only. Operational testing demonstrated that the LTT was not compatible with a JLTV operating at mission profile speeds, so the JLTV was limited to the safe towing speed of the LTT to limit equipment damage.[citation needed] In June 2020 Oshkosh announced that the company had been awarded a contract modification to increase available trailer options from 32 to 3,541.[79] As part of a November 2020 JLTV award 1,001 trailers were ordered. First fielding of the JLTV-Trailer is scheduled for March 2022, and until then the JLTV is used with the LTT, but at a reduced mission profile.
The JLTV-T is based on a bolted channel section chassis and features independent trailing arm and air suspension. Wheels and tires are shared with the JLTV. The cargo deck features removable sidewalls and tailgate, an onboard stowage box included for these when the trailer is used as a flatbed. ISO locks are provided on the loadbed for any required shelter of similar interface.
At AUSA 2016, Oshkosh displayed a JLTV General Purpose variant equipped with an EOS R-400S-MK2 remote weapon system integrated with Orbital ATK's M230LF 30 mm lightweight automatic chain gun.[80]
At AUSA 2017 JLTVs were displayed in three new configurations. Oshkosh displayed a General Purpose variant fitted with a Boeing Compact Laser Weapon System (CLWS), a Kongsberg Protector LW 30 Remote Weapon System (RWS) with a M230LF cannon, and a communications suite that includes a Thales VRC-111 and Thales VRC-121 VIPER. The company also displayed a Utility variant equipped with the Boeing Maneuver Short Range Air Defense (SHORAD) Launcher including a M3P .50 cal machine gun, M299 launcher with four Longbow Hellfire missiles, sensor suite, and a communications suite including a Thales VRC-111. Rafael displayed a General Purpose vehicle fitted with the company's Samson RWS Dual Stabilized Remote Weapon Systems (RWS) with M230 LF, and the Trophy Light Active Protection System (APS).[81][82]
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.