The Circle line is a spiral-shaped London Underground line, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Printed in yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 141 million passenger journeys were recorded in 2019.

Quick Facts Overview, Termini ...
Circle line
A red S7 Stock train arriving at the clockwise platform at Aldgate station, with passengers waiting to board
A Circle line S7 Stock train at Aldgate
Overview
Termini
  • Edgware Road
  • Hammersmith
Stations36
Colour on mapCorporate Yellow (with black outline until 1990)[1]
Websitetfl.gov.uk
Service
TypeRapid transit
SystemLondon Underground
Depot(s)Hammersmith
Rolling stockS7 Stock
Ridership141.627 million (2019)[a][2] passenger journeys
History
OpenedInfrastructure opened in stages between 1863 (162 years ago) (1863) and 1884; shown as a separate line on the Tube map from 1949
Last extension13 December 2009
Technical
Line length27 km (17 mi)
CharacterSub-surface
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
London Underground
Bakerloo
Central
Circle
District
Hammersmith & City
Jubilee
Metropolitan
Northern
Piccadilly
Victoria
Waterloo & City
London Overground
Liberty
Lioness
Mildmay (North · West)
Suffragette
Weaver
Windrush (East · South)
Other TfL Modes
DLR
Elizabeth line
London Trams
Close

The first section became operational in 1863 when the Metropolitan Railway opened the world's first underground line between Paddington and Farringdon with wooden carriages and steam locomotives. The same year a select committee report recommended an "inner circle" of lines connecting the London railway termini, and the Metropolitan District Railway (commonly known as the District Railway) was formed to build the southern portion of the line.

In 1871, services began between Mansion House and Moorgate via Paddington, jointly operated by the two companies. Due to conflict between the two companies it was not until October 1884 that the inner circle was completed. The line was electrified in 1905, and in 1933 the companies were amalgamated into the London Passenger Transport Board. In 1949, the Circle line appeared as a separate line for the first time on the Tube map. In 2009, the closed loop around the centre of London on the north side of the River Thames was broken at Edgware Road and extended west to become a spiral to Hammersmith.

Starting in 2015, the signalling system was upgraded as part of a programme to increase peak-hour capacity on the line. The six-car C Stock trains were replaced from 2012 to 2014 by new seven-car S Stock trains.

History

Summarize
Perspective

Origins

Quick Facts Metropolitan and District Railways (City Lines and Extensions) Act 1879, Citation ...
Metropolitan and District Railways (City Lines and Extensions) Act 1879
Act of Parliament
Thumb
Citation42 & 43 Vict. c. cci
Close
Thumb
High Street Kensington station in 1892

In 1863, the Metropolitan Railway, the world's first underground railway, opened in London between Paddington and Farringdon, connecting the Great Western Railway's relatively remote terminus at Paddington with Euston and King's Cross stations and the City, London's financial district. In the same year, a select committee report recommended an "inner circle" of railway lines connecting the London termini that had been built or were under construction. In the next year, the Metropolitan District Railway (commonly known as the District Railway) was formed to build and operate a railway from South Kensington to Tower Hill. The Metropolitan western extension from a new station at Paddington to South Kensington opened in 1868. By May 1870, the District Railway had opened its line from West Brompton to Blackfriars via Gloucester Road and South Kensington, services being operated at first by the Metropolitan.[3] In 1871, the District had built a terminus at Mansion House, and on 18 November 1876 the Metropolitan opened its terminus at Aldgate.[4] Because of the conflict between the two companies, it took an act of Parliament, the Metropolitan and District Railways (City Lines and Extensions) Act 1879 (42 & 43 Vict. c. cci) before further work was done on the inner circle.[5] In 1882, the Metropolitan extended its line from Aldgate to a temporary station at Tower Hill and the District completed its line to Whitechapel. On 6 October 1884, the temporary station was replaced with a joint station and the inner circle was complete.[6][7] The Metropolitan provided the clockwise, or "outer rail", trains; the District the "inner rail", or anti-clockwise.[8] Many breakdowns occurred, due to the unbalanced wear-and-tear inflicted upon the train and carriages caused by travelling in a single circular direction. Equally, services were further disrupted due to petty squabbles between the two rivals including an incident whereby the Metropolitan Railway forcibly removed (using three trains) the District Railway's parked carriages which had been chained to the track.[9]

Other circle routes

As well as the inner circle, other routes circumnavigated London, although these were not complete loops. From 1872, the L&NWR began an "outer circle" service from Broad Street to Mansion House via Willesden Junction and Earl's Court, diverting an earlier service that had run to Victoria; and the GWR began a "middle circle" service from Moorgate to Mansion House via Latimer Road and Earl's Court. Both of these routes were cut back to Earl's Court: the "middle circle" in 1900 and the "outer circle" in 1909. The GWR service survived as a shuttle service from the Hammersmith & City line to Addison Road, now Kensington (Olympia), until 1940.[8]

The Midland Railway briefly ran a super outer circle from St Pancras to Earl's Court from 1878 to 1880.[8] London Overground now runs services between Clapham Junction, Willesden Junction and Dalston Junction and between Dalston Junction and Clapham Junction.

Electrification

Thumb
The joint Metropolitan and District Railway experimental electric train that ran between Earl's Court and High Street Kensington in 1900

Wooden carriages were originally hauled by steam locomotives leading to smoke-filled stations and carriages, unpopular with passengers. At the start of the 20th century, the District and Metropolitan were seeing increased competition in central London from the new electric underground tube lines and trams, and conversion to electric traction was seen as the way forward.[10] Experiments were carried out on the Earl's Court to High Street Kensington section, and a jointly-owned six-carriage train began passenger service in 1900. Following this, an AC system was suggested, and this was accepted by both parties. However, the District was looking for a way to raise the finance needed and in 1901 found an investor, the American Charles Yerkes. He formed the Underground Electric Railways of London (UERL), and his experience in the United States led him to favour DC, with third-rail pick-up similar to that in use on the City & South London Railway and Central London Railway. After arbitration by the Board of Trade, the DC system was taken up, and the railways began electrifying the routes, using multiple-unit stock.[11]

The District and Metropolitan Railways bought different designs of electric multiple unit. Both had open saloons; the Metropolitan trains with gated ends, the District B Stock with sliding doors in the middle of each car.[12] When their introduction was attempted on 1 July 1905, a Metropolitan train overturned the third rail on the District Railway, requiring all Metropolitan trains to be modified before running again on the District lines. A fully electric service began on 24 September, initially with six-car trains, later reduced to four-car.[13] The Metropolitan trains were soon modified to enclose the gated end[14] and eventually to add sliding doors in the middle.[15] Trains were increased to five cars in 1918 and the Metropolitan introduced new stock in 1921, with three pairs of sliding double doors on trailer cars.[16] In 1926 the Metropolitan took over all inner circle workings except for three trains on Sundays.[17]

London Transport

Thumb
O Stock was used on the Circle line 1947–70. Here photographed at Barking in 1980.
Thumb
The Circle line before the extension to Hammersmith in 2009

On 1 July 1933, the Metropolitan and the District Railways were amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board. Metropolitan Railway electric multiple units were refurbished in 1934 at Acton Works to become eighteen five-car trains of Circle Stock, at first painted red and cream, later painted red all over to reduce costs. These trains included first-class accommodation,[18] but this was downgraded in 1940.[19] From 1947, these were replaced by five-car trains of O and P Stock, with doors remotely operated by the guard, released by the transfer of F Stock to the Uxbridge line.[20] The 1933 London Underground Beck map shows a Metropolitan line north of High Street Kensington and Mark Lane stations and a District line south of these points.[21] On the 1947 map, the Metropolitan and District lines were shown together in the same colour[22] and two years later in 1949 the Circle line was shown separately on the map.[23]

In 1959–1960, Circle line trains were increased to six cars, the same length as those operating on the Hammersmith & City line, and the stock of the two lines was integrated with maintenance concentrated at Hammersmith depot, allowing Neasden depot to concentrate on the new A Stock.[24] Aluminium C Stock trains, with public address systems and originally unpainted, replaced these trains from 1970.[25] One person operation of the trains was proposed in 1972 but, due to conflict with the trade unions, was not introduced until 1984.[26] In 2003, the infrastructure of the Circle line was partly privatised in a public–private partnership, managed by the Metronet consortium. Metronet went into administration in 2007 and the local government body Transport for London took over responsibilities.[27]

On 7 July 2005, at about 08:50, bombs exploded on two Circle line trains. One was travelling between Liverpool Street and Aldgate and the other was at Edgware Road. The bombs killed 15 people, including the two suicide bombers.[28][29] Following the attacks, the whole of the Circle line was closed until 8 August.[30]

A day before a ban on drinking alcohol on public transport in London came into force, a party was held on 31 May 2008, mainly on the Circle line. Thousands of people attended and 17 were arrested by police due to disorderly behaviour, eventually causing several stations to be closed.[31]

Extension

Prior to 13 December 2009, Circle line trains travelled in both directions around a simple loop with 27 stations and 12.89 miles (20.75 km) of track. In 2006, there were fourteen trains in service on the line with an interval between trains of 8+12 minutes during peak hours and 8 minutes off-peak; the minimum running time around the circle off-peak was 51+12 minutes,[32] although timetabled stops at stations extended this.[b]

In December 2009, the Circle line was extended to include the Hammersmith & City route from Edgware Road to Hammersmith. Rather than continuously running around the circle, trains now travel from Hammersmith to Edgware Road, generally going around the circle once before terminating at Edgware Road, and returning via the same route; occasionally, trains may also continue clockwise through Edgware Road to additional stations. The change was made to improve reliability and increase the service frequency on the Hammersmith branch.[34]

In March 2020, following the UK government's implementation of lockdown restricting all non-essential travel, the Circle line, along with the Waterloo & City line, was suspended.[35]

Route

Summarize
Perspective

Map

Thumb
The route of the Circle line since 13 December 2009 and the London boroughs it serves

Railway line

Circle line
Hammersmith
Hammersmith & City Line
Hammersmith depot
enlarge…
Goldhawk Road
Shepherd's Bush (MR)
Shepherd's Bush Market
White City
Wood Lane Hammersmith & City Line
Latimer Road
Ladbroke Grove
enlarge…
Westbourne Park
Royal Oak
Paddington Bakerloo Line District Line Hammersmith & City Line Elizabeth Line Heathrow Express National Rail
Bayswater
Central line (London Underground) District Line Notting Hill Gate
Edgware Road District Line Hammersmith & City Line
District Line High Street Kensington
Baker Street Bakerloo Line Hammersmith & City Line Jubilee Line Metropolitan Line
District Line Piccadilly Line Gloucester Road
District Line Piccadilly Line South Kensington
Great Portland Street
Euston Square Hammersmith & City Line Metropolitan Line
Sloane Square
enlarge…
King's Cross St Pancras
Hammersmith & City Line Metropolitan Line Northern Line
Piccadilly Line Victoria Line
National Rail
Eurostar
National Rail District Line Victoria Line Victoria
St James's Park
London River Services District Line Jubilee Line Westminster
Clerkenwell not built
London River Services Bakerloo Line District Line Northern Line Embankment
Temple
Farringdon Hammersmith & City Line Metropolitan Line Elizabeth Line National Rail
National Rail London River Services District Line Blackfriars
Mansion House
Barbican Elizabeth Line
National Rail District Line Cannon Street
Docklands Light Railway Central line (London Underground) District Line Northern Line Waterloo & City Line Monument
Moorgate Hammersmith & City Line Metropolitan Line Northern Line Elizabeth Line National Rail
Liverpool Street Central line (London Underground) Hammersmith & City Line Metropolitan Line Elizabeth Line Lea Valley lines National Rail
London River Services District Line Tower Hill
Aldgate Metropolitan Line

The Circle line is 17 miles (27 km) long with 36 stations.[36] Almost all of its track, and all of its stations, are shared with the other London Underground sub-surface lines: the Hammersmith & City line from Hammersmith to Liverpool Street; the Metropolitan line from just east of Baker Street to Aldgate station; the main branch of the District line from Tower Hill station to Gloucester Road; and the Edgware Road branch of the District line from High Street Kensington to Edgware Road.[37] The only two sections of track which are not shared with any other lines are linking sections between Aldgate and Tower Hill, and between Gloucester Road and High Street Kensington. The line is electrified with a four-rail DC system: a central conductor rail is energised at −210 V and a rail outside the running rail at +420 V, giving a potential difference of 630 V.[38] The running rails are not electrified. Much of the 2-mile-35-chain (3.9 km) double track railway from the Hammersmith terminus to Westbourne Park station is on a 20-foot (6.1 m) high brick viaduct.[39]

East of Westbourne Park the line passes beneath the Great Western Main Line before resurfacing at Royal Oak station and running alongside the tracks of the main line to an island platform just north of the suburban platforms at Paddington station.[37] The line enters a cut and cover tunnel at the end of the platforms and meets the District line and the other end of the Circle line from Bayswater at Praed Street Junction before passing through Edgware Road station in a cutting. After King's Cross St Pancras station the line exits the tunnel before passing over the Ray Street Gridiron beneath which pass the City Widened Lines which are currently used by Thameslink services.[37][40] The line continues underground after Farringdon station; there are bay platforms at Moorgate station.[37]

After passing through Aldgate station, the terminus of the Metropolitan line, the line joins the District line shortly before Tower Hill; this part of the line includes stations on the Victoria Embankment, on the north bank of the Thames, as far as Westminster station.[37] West of Gloucester Road station the line turns off the District main line to join the District line's Edgware Road branch just before High Street Kensington station.[37] In Bayswater the line is in a cutting, concealed from above by a façade of two five-storey houses at Nos 23 and 24 Leinster Gardens.[41] Trains then call at the second Paddington station on Praed Street before rejoining the Hammersmith & City line at Praed Street junction and terminating at the four-platform Edgware Road station.[37]

Services

As of December 2012, there are six trains per hour, calling at all stations,[42] requiring 18 trains in service.[36] The journey from Edgware Road around the loop and continuing to Hammersmith takes 72 minutes off-peak.[42] Together with the Hammersmith & City line over 114 million passenger journeys are made each year.[43] Paddington and all stations on the loop are within Zone 1, with those on the line to Hammersmith in Zone 2.[44]

Two trains per day run from Barking to Edgware Road via Victoria (as of February 2015).[45]

Announcements

Historically there has been difficulty in relaying the direction of travel a train is headed in a clear message: variations such as "eastbound" and "westbound", and "clockwise" and "anti-clockwise" can be ambiguous. As passengers became more accustomed to digital devices, TfL considered stopping such announcements and now uses key stations along the route to describe a service (e.g. "via. High Street Kensington").[46][47]

Rolling stock

Summarize
Perspective

From 1970 to 2014, services were provided using six-car C69 stock trains, each car having mostly transverse seating and four sets of double doors per side to minimise loading times.[48]

The C69 stock trains were replaced by seven-car S Stock trains, the first running on the Circle line on 2 September 2013.[49][50][51] By June 2014 all services were provided by S7 Stock trains. The trains are part of Bombardier's Movia family,[52] and have a top speed of 62 mph (100 km/h).[52] A 7-car S Stock train has a capacity of 865 passengers compared to 739 for the 6-car C Stock train it replaced.[53][54] With a length of 117 metres (384 ft), the S Stock trains are 24 metres (79 ft) longer than the 93-metre (305 ft) long C stock train, and required station platforms to be lengthened before their introduction.[55]

Depot

The line's depot is at Hammersmith,[c] close to Hammersmith station, originally built by the Great Western Railway to be operated by the Metropolitan Railway when the joint Hammersmith & City Railway was electrified in the early 20th century.[56] Sidings at Barking, Farringdon and near High Street Kensington (known as Triangle Sidings) stable trains overnight.[36]

Four Lines Modernisation (4LM)

Summarize
Perspective

It was planned that a new signalling system would be used first on the sub-surface lines from the end of 2016,[57] but signalling contractor Bombardier was released from its contract by agreement in December 2013 amid heavy criticism of the procurement process[58] and London Underground subsequently awarded the contract for the project to Thales in August 2015.[59]

With the introduction of S7 Stock, the track, electrical supply, and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the line by 27 per cent by the end of 2023.[57][60][61] A single control room for the sub-surface railway opened at Hammersmith on 6 May 2018, and Communications Based Train Control (CBTC) provided by Thales will progressively replace 'fixed block' signalling equipment dating back to the 1940s.[57][62]

The rollout of CBTC has been split into sections, each known as a Signal Migration Area (SMA), and are located on the line as follows:[63]

More information SMA, from ...
Circle line Signal Migration Areas
SMA[i] from to status date
0.5 Hammersmith Latimer Road Completed March 2019
1 Latimer Road Paddington Completed September 2019
2 Paddington Euston Square Completed September 2019
3 Euston Square Monument Completed March 2021
4 Monument Sloane Square Completed April 2021
5 Sloane Square Paddington Completed March 2022
Close
  1. SMAs 6–14 concerns parts of the District, Hammersmith & City, and Metropolitan lines.

List of stations

Summarize
Perspective
More information Station, Image ...
StationImageOpened[7]Additional informationPosition
Hammersmith Disabled accessThumb13 June 1864Moved to current position 1 December 1868.[7] Connects with District and Piccadilly lines. 51°29′39″N 000°13′30″W
Goldhawk RoadThumb1 April 191451°30′07″N 000°13′37″W
Shepherd's Bush MarketThumb13 June 1864Moved to current position 1 April 1914.[7] Renamed from "Shepherd's Bush" in 2008.[64]51°30′21″N 000°13′35″W
Wood Lane Disabled accessThumb1 May 1908Open as Wood Lane (Exhibition) 1908–14 and as required from 1920 as Wood Lane (White City). Renamed White City in 1947 and closed in 1959,[7] until re-opened as Wood Lane on 12 October 2008.[65]51°30′35″N 000°13′27″W
Latimer RoadThumb16 December 1868Closed from 17 January to 1 August 2011 for engineering and refurbishment works.[66]51°30′50″N 000°13′02″W
Ladbroke GroveThumb13 June 1864Opened as Notting Hill, renamed Notting Hill & Ladbroke Grove in 1880, Ladbroke Grove (North Kensington) in 1919, and Ladbroke Grove in 1938.[7]51°31′02″N 000°12′38″W
Westbourne ParkThumb1 February 1866Moved to current position 1 November 1871,[7] and a Great Western Main Line station from 1871 to 1992.[67]51°31′16″N 000°12′04″W
Royal OakThumb30 October 1871Also a Great Western Main Line station after opening[68] until 1934.51°31′09″N 000°11′17″W
Paddington Disabled access Elizabeth line National RailThumb10 January 1863Opened as Paddington (Bishop's Road), renamed in 1948.[7]
Connects with Bakerloo and District lines, Elizabeth line and National rail services from Paddington main line station.
51°31′07″N 000°10′46″W
Edgware RoadThumb10 January 1863Connects with District ,anti-clockwise Circle lines and the hammersmith and city line.51°31′12″N 000°10′04″W
Baker StreetThumb10 January 1863Connects with Bakerloo, Jubilee and Metropolitan lines.51°31′19″N 000°09′25″W
Great Portland StreetThumb10 January 1863Opened as Portland Road, renamed Great Portland Street in 1917. Named Great Portland Street & Regent's Park 1923–33.[7]51°31′26″N 000°08′38″W
Euston SquareThumb10 January 1863Opened as Gower Street and renamed in 1909.[7] Street connection with Lioness line and National rail services from Euston main line station.51°31′33″N 000°08′09″W
King's Cross St Pancras Disabled access Thameslink National Rail EurostarThumb10 January 1863Opened as King's Cross, renamed King's Cross & St. Pancras in 1925 and King's Cross St. Pancras in 1933. Moved to current position in 1941.[7]
Connects with Northern, Piccadilly and Victoria lines and National and International Rail Services from St Pancras and King's Cross main line stations.
51°31′49″N 000°07′27″W
Farringdon Disabled access Elizabeth line Thameslink National RailThumb10 January 1863Interchangeable with National Rail (Thameslink) services and the Elizabeth line. Opened as Farringdon Street, and moved to current position in 1865. Renamed Farringdon & High Holborn in 1922 and Farringdon in 1936.[7]51°31′12″N 000°06′19″W
BarbicanThumb23 December 1865Opened as Aldersgate Street, then Aldersgate in 1910, Aldersgate & Barbican in 1923 and Barbican in 1968.[7]51°31′13″N 000°05′52″W
Moorgate Elizabeth line National RailThumb23 December 1865Opened as Moorgate Street, renamed in 1924.[7]
Connects with Northern line and National rail services from the main line Northern City Line. The Elizabeth line is interchangeable via Liverpool Street station owing to the long platforms.
51°31′07″N 000°05′19″W
Liverpool Street Elizabeth line London Overground National RailThumb11 July 1875From February to July 1875 trains used platforms in the mainline station.[69]
Connects with Central and Hammersmith & City lines and Weaver line, Elizabeth line and National rail services from Liverpool Street mainline station. Elizabeth Line services via Stratford and Shenfield from platforms 15, 16 and 17.
51°31′04″N 000°04′59″W
AldgateThumb18 November 1876Connects with Metropolitan line. 51°30′50″N 000°04′34″W
Tower Hill Disabled accessThumb25 September 1882The Metropolitan Railway opened "Tower of London", however closed this in 1884 as the District Railway had opened "Mark Lane" nearby. This station was renamed "Tower Hill" in 1946 and moved to the site of the "Tower of London" station in 1967.[7][70] Connects with District line, DLR from Tower Gateway, National rail services from Fenchurch Street mainline station, and Riverboat services from Tower Pier51°30′36″N 000°04′34″W
Monument Docklands Light RailwayThumb6 October 1884Opened as Eastcheap, renamed The Monument in 1884.[7] Escalator connection to Bank station giving connections with Central, Northern, Waterloo & City and DLR.51°30′47″N 000°05′17″W
Cannon Street National RailThumb6 October 1884Connects with Cannon Street main line station.51°30′37″N 000°05′27″W
Mansion HouseThumb3 July 187151°30′44″N 000°05′39″W
Blackfriars Disabled access Thameslink National RailThumb30 May 1870Connects with National rail services from Blackfriars main line station, including Thameslink services, and Riverboat services from Blackfriars Pier51°30′42″N 000°06′11″W
TempleThumb30 May 1870Opened as The Temple.[7]51°30′40″N 000°06′52″W
EmbankmentThumb30 May 1870Opened as Charing Cross, renamed Charing Cross Embankment in 1974 and to the current name from 1976.[7] Connects with Bakerloo and Northern lines, National rail services from Charing Cross main line station, and Riverboat services from Embankment Pier51°30′25″N 000°07′19″W
Westminster Disabled accessThumb24 December 1868Opened as Westminster Bridge, renamed in 1907.[7] Connects with Jubilee line.51°30′04″N 000°07′30″W
St James's ParkThumb24 December 1868The former London Underground Headquarters offices, 55 Broadway, were built over the station.51°29′58″N 000°08′04″W
Victoria Disabled access National RailThumb24 December 1868Connects with Victoria line, National rail services from Victoria main line station and Victoria bus station.51°29′48″N 000°08′41″W
Sloane SquareThumb24 December 186851°29′33″N 000°09′24″W
South KensingtonThumb24 December 1868Connects with Piccadilly line.51°29′39″N 000°10′26″W
Gloucester RoadThumb1 October 1868Opened as Brompton (Gloucester Road), renamed in 1907.[7] Connects with Piccadilly and District lines.51°29′41″N 000°10′59″W
High Street KensingtonThumb1 October 1868Opened as Kensington (High Street) and name gradually changed by 1880.[7] Connects with District line Edgware Road branch.51°30′03″N 000°11′33″W
Notting Hill GateThumb1 October 1868Connects with Central line.51°30′32″N 000°11′49″W
BayswaterThumb1 October 1868Opened as Bayswater, renamed Bayswater (Queen's Road) & Westbourne Grove in 1923, Bayswater (Queen's Road) in 1933 and Bayswater (Queensway) in 1946, after which the suffix was gradually dropped.[7]51°30′43″N 000°11′17″W
Paddington Elizabeth line National RailThumb1 October 1868Opened as Paddington (Praed Street), renamed in 1948.[7] Connects with Bakerloo and Hammersmith & City lines, Elizabeth line and National rail services from Paddington main line station.

51°30′56″N 000°10′32″W

Close

The line then continues to Edgware Road where trains terminate, then reverse to traverse the loop in an anticlockwise direction to Hammersmith.

Urban myths

Owing to its historically circular nature, the line has generated many urban myths over the years, including a dead man travelling around undiscovered, a school or office using the service to save infrastructure costs and, as an April fool in the Independent, a new particle accelerator to coexist alongside passenger services.[46][71][72]

See also

Notes and references

Further reading

Wikiwand in your browser!

Seamless Wikipedia browsing. On steroids.

Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.

Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.